Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Sign-off from BPA's Environmental Compliance Group that EC requirements have been met | A: 165. Environmental compliance required for water quality data collection | 05/31/2009 | 05/31/2009 | |
Data that clarify the effectiveness of in-stream restoration projects in the Entiat River | B: 157. Measure population dynamics to estimate carrying capacity at restoration sites in the Entiat River | 10/02/2009 | 09/25/2009 | |
Analysis of fish population dynamics in restored vs. unrestored stream reaches | C: 162. Analyze population dynamics at restoration sites vs. unrestored sites | 02/01/2010 | 01/13/2010 | |
Database and publication of Entiat River water quality data | D: 157. Measure, analyze and interpret water quality trends in Entiat River subbasin | 03/31/2010 | 03/31/2010 | |
All BPA contract documents | E: 119. Overall project management | 03/31/2010 | 03/31/2010 | |
Annual Report submitted to NOAA Fisheries | F: 132. Submit Annual Report for Entiat River Effectiveness Monitoring for the period of performance | 03/17/2010 | 03/31/2010 | |
Annual Report submitted to NOAA, Fisheries, ISEMP, and BPA | G: 132. Submit Annual Report for Entiat River water quality for the period of performance | 03/15/2010 | 03/31/2010 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Environmental compliance required for water quality data collection | 02/09/2007 | ||||||
B | 157 | Measure population dynamics to estimate carrying capacity at restoration sites in the Entiat River | 04/28/2009 | ||||||
C | 162 | Analyze population dynamics at restoration sites vs. unrestored sites | 02/09/2007 | ||||||
D | 157 | Measure, analyze and interpret water quality trends in Entiat River subbasin | 01/31/2009 | ||||||
E | 119 | Overall project management | 02/09/2007 | ||||||
F | 132 | Submit Annual Report for Entiat River Effectiveness Monitoring for the period of performance | 02/09/2007 | ||||||
G | 132 | Submit Annual Report for Entiat River water quality for the period of performance | 02/09/2007 | ||||||
H | 185 | Periodic Status Reports for BPA | 02/09/2007 |