Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 42044: 200820100 EXP CEDED AREA TRIB CULVERT/PASSAGE
Project Number:
Title:
Umatilla Tribe Ceded Land Culvert and Passage Implementation
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
42044
Contract Title:
200820100 EXP CEDED AREA TRIB CULVERT/PASSAGE
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
The purpose of this project is to protect and improve fish passage for improved natural production of indigenous, Mid-Columbia River (MCR) Evolutionary Significant Unit (ESU) summer steelhead (Oncorhynchus mykiss), listed as threatened under the Federal Endangered Species Act (ESA), and spring Chinook salmon (Oncorhynchus tshawytscha) within the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) ceded lands. The project entails coordinated and cooperative efforts to protect and improve fish passage and habitat associated with passage projects consistent with the strategies and objectives outlined in subbasin plans, recovery documents, and planning documents. All projects carried out under this project shall include cost share funding and/or in-kind assistance from various sources whenever possible. Cooperative partners may include but will not be limited to Wallowa-Whitman National Forest (WNF), Umatilla National Forest (UNF), North Fork John Day Watershed Council (NFJDWC), Grant County SWCD, U.S. Army Corps of Engineers, National Oceanic and Atmospheric Administration, and the Oregon Watershed Enhancement Board.

Implementation during this contract period shall include: (1) coordination with landowners, resource agencies and the NFJDWC to identify and select FY 2008/09 fish passage projects and associated active habitat enhancement projects throughout CTUIR’s ceded lands, (2) Replace a passage barrier (culvert) on Battle Creek, (3) Replace a passage barrier (culvert) on Granite Creek, (4) restore summer flows to a reach of Beaver Creek, (5) Produce necessary status reports, and (6) Create SOW and budget for project year 2010.

The attached SOW reflects an abbreviated performance period (10 month) ending 31 January 2010 as opposed to the 31 April 2010 performance period currently outlined. The objective of this contract closely ties it to in-stream work window and this change reflects the difficulty in securing permits and contracts in time to initiate and complete work during a 15 July to 15 August window. Consecutive performance periods will return to a 12 month schedule beginning on 1 February and end on 31 January the following year.

CTUIR is aware of a region wide programmatic MOU between BPA and the USFS requiring a 30% USFS cost share for  projects on USFS lands.
Account Type(s):
Expense
Contract Start Date:
04/15/2009
Contract End Date:
10/31/2010
Current Contract Value:
$189,920
Expenditures:
$189,920

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Identify, Prioritize and Select Habitat Project Areas A: 114. Identify, Prioritize and Select Habitat Project Areas 01/31/2010 01/31/2010
Produce Environmental Clearance B: 165. Produce Environmental Clearance 01/31/2010 01/31/2010
Install Battle Creek Culvert C: 184. Install Battle Creek Culvert 08/31/2010 08/31/2010
Install Granite Creek Culvert D: 184. Install Granite Creek Culvert 08/31/2010 08/31/2010
Restore Summer Flows in Beaver Creek E: 184. Restore Summer Flows In Beaver Creek 09/15/2010 09/15/2010
Submit Funding Package To COTR G: 119. Submit Funding Package To COTR 11/01/2009 11/30/2009
Attach Progress Report in Pisces H: 132. Submit non-technical Progress Report for the period 5/1/09 to 10/31/10 10/29/2010 10/31/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 184 Install Fish Passage Structure
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 184 Install Fish Passage Structure
Trout, Bull (S. confluentus) (Threatened)
  • 3 instances of WE 184 Install Fish Passage Structure
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 184 Install Fish Passage Structure
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 114 Identify, Prioritize and Select Habitat Project Areas 02/09/2007
B 165 Produce Environmental Clearance 02/09/2007
C 184 Install Battle Creek Culvert 03/30/2009
D 184 Install Granite Creek Culvert 03/30/2009
E 184 Restore Summer Flows In Beaver Creek 07/08/2010
F 185 Periodic Status Reports for BPA 02/09/2007
G 119 Submit Funding Package To COTR 02/09/2007
H 132 Submit non-technical Progress Report for the period 5/1/09 to 10/31/10 02/09/2007