Contract 43194: 199206800 EXP WILLAMETTE BASIN WILDLIFE MITIGATION
Project Number:
Title:
Willamette Basin Mitigation
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
43194
Contract Title:
199206800 EXP WILLAMETTE BASIN WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
36902: 1992-068-00 EXP WILLAMETTE BASIN MITIGATION
  • 52715: 2011-004-00 EXP WILLAMETTE BASIN MITIGATION
Contract Status:
History
Contract Description:
A multi-year planning effort by ODFW and others has resulted in the publication of recommendations for habitat protection and habitat enhancement projects using a variety of techniques throughout the Willamette River Basin (found in the Loss Assessments, Oregon Trust Agreement, Gap Analysis, and Alternatives Team Recommendation documents).  These projects and others will assist BPA in carrying out its wildlife mitigation obligations for the construction and operation of the Willamette Valley FCRPS Hydro Projects.  The implementation of this project will also assist BPA in meetings its goals under the Willamette Project BiOp.  Coordination and project development will continue to occur with major players in the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program (FWP) Subbasin Planning efforts.
Account Type(s):
Expense
Contract Start Date:
05/01/2009
Contract End Date:
12/31/2010
Current Contract Value:
$1,318,148
Expenditures:
$1,318,148

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Receipt of environmental compliance clearance from BPA A: 165. Prepare NEPA/ESA documentation. 07/31/2010
Project management and coordination B: 119. Coordinate subcontracts, administer and develop budgets. 11/30/2010
Complete regional coordination C: 189. Coordinate with CBFWA, NPCC, and BPA on regional wildlife issues. 11/30/2010
Complete identification of 2009 enhancement and O&M activities D: 114. Identify enhancement and O&M activities for 2009 08/31/2009 08/31/2009
Coordination of pre-acquisition activities E: 172. Identify and coordinate pre-acquisition activities for 2009 06/30/2010
Baseline HEP Reports for Willamette sites F: 87. Work with Regional HEP team to schedule and conduct 2009 HEP surveys 02/28/2010 02/28/2010
Complete reviews G: 122. Provide technical review of management plans, floodplain restoration plans, and related documents 11/30/2010
Complete database creation and maintenance H: 160. Create and maintain reporting database and invoice tracking system for subcontracts. 11/30/2010
Attach Progress Report in Pisces J: 132. Submit Progress Report for the period December 2007 to January 2008 10/31/2010
Attach Progress Report in Pisces K: 132. Submit Progress Report for the period January 2008 to April 2009 10/31/2010
Quarterly Reports and Invoices for project located on Buford Park L: 119. Coordinate activities on Sorenson and South Meadows sites 11/30/2010
Complete pre-acquisition activities; transfer Sorenson ownership M: 172. Complete pre-acquisition activities for potential acquisitions near Buford Park 11/30/2010
Complete consultation with Technical Advisory Group N: 174. Work with Technical Advisory Group for long-term Management Plan 11/30/2009 11/30/2009
Complete stand assessments and invasive species distribution data collections O: 157. Collect hydrology data South Meadow and conduct stand assessments at Mt Pisgah/Buford Park 2009 11/30/2009 11/30/2009
Prepare side channel area for excavation and excavate lower end to increase flows P: 30. Open additional side channel (to Coast Fork Willamette) on main side channel 2009 11/30/2009 11/30/2009
Complete planting on Sorenson and South Meadow Q: 47. Seed native grasses and forbs on South Meadow 2009 01/31/2010 01/31/2010
Complete vegetation maintenance R: 22. Maintain vegetation on Sorenson and South Meadow 10/30/2010
Complete weed removal S: 53. Treat/remove weeds in Sorenson Meadows and South Meadow 2009 04/30/2010
Implement Prescribe burn T: 31. Implement prescribed burn in oak savanna and upland prairie on Mt Pisgah 2009 10/30/2009
Complete plantings on E.E. Wilson's Pipit Meadow and Frontage Road U: 47. Plant native forbs and grasses on Pipit sites on E.E. Wilson 2009 11/30/2009 11/30/2009
Complete weed and shrub removal V: 53. Treat/remove invasive weeds on E.E. Wilson Frontage Rd. wetland 2009 04/30/2010
Manage Big Island and Green Island activities W: 119. Manage and coordinate field crews on Big Island and Green Island 10/30/2010
Complete educational and outreach activities X: 99. Host educational groups and community members to highlight restoration work 2009 04/30/2010
Complete plantings Y: 47. Plant shrubs for habitat restoration on Big Island 2009 04/30/2010 12/31/2009
Complete vegetation maintenance Z: 22. Irrigate and maintain past plantings on Big Island 2009 10/30/2009 10/30/2009
Complete weed removal AA: 53. Remove/control non-native, exotic species on Big Island 2009 11/30/2009 11/30/2009
Complete installation of woody debris AB: 29. Install instream woody debris on Big Island 2009 10/30/2009 10/30/2009
Complete data collection AC: 157. Collect data on terrestrial habitat and aquatic systems on Big Island 2009 04/30/2010
Complete annual review of management plan objectives AD: 122. Evaluate and Revise Management Plan Objectives 11/30/2010
Maintain and update existing GIS resource database AE: 160. Maintain GIS database for Big Island. 11/30/2010
Conduct community outreach and education AF: 99. Facilitate educational and community (public use) activities on Green Island 2009 04/30/2010
Management Plan for Green Island AG: 174. Develop Management Plan for Green Island 04/30/2010
Complete installation of large woody debris. AH: 29. Install large woody debris in-stream on Green Island 2009 11/30/2009 11/30/2009
Restore floodplain functions. AI: 30. Implement plan to improve hydrologic functions on Green Island 11/30/2009 11/30/2009
Complete planting AJ: 47. Plant trees and shrubs on Green Island 2009 04/30/2010
Maintain trees and shrubs planted in 2007-9 AK: 22. Maintain newly planted trees and shrubs on Green Island 2009 04/30/2010
Complete weed removal AL: 53. Remove exotic invasives on Green Island 2009 04/30/2010
Complete data collection and develop hydro models AM: 157. Monitoring of hydrologic flows and planting success Green Island 2009 04/30/2010
Select 10 priority restoration sites AN: 174. Complete plan for Willamette Floodplain Restoration General Investigation Study 11/30/2010
Complete inventory AO: 115. Inventory key invasive plants on Zena property 2009 11/30/2010
Complete planting AP: 47. Reseed with native grasses 10 ac Zena Property 2009 04/30/2010
Complete burn AQ: 31. Conduct controlled burn to enhance prairie on Zena 10/30/2009 10/30/2009
Complete vegetation and tree removal AR: 53. Remove encroaching conifers and invasives from oak woodland on Zena 2009 10/31/2009 10/31/2009
Complete evaluation of easement and management plan compliance AS: 141. Produce written annual report on Zena compliance 2009 04/30/2010
Coordinate Lone Star Property activities including easement restrictions and management plan AT: 119. Manage conservation easement for Lone Star Property 2009 11/30/2009 11/30/2009
Complete initial management plan for Lone Star Property AU: 174. Complete initial management plan for Lone Star Property 11/30/2010
Complete conifer removal AV: 53. Remove conifers from oak woodlands on Lone Star 2009 04/30/2010
Develop habitat restoration/protection plan for Fender's blue butterflies AW: 174. Develop habitat restoration/protection plan for Fender's blue butterflies 11/30/2010
Oversee work and provide information as necessary AX: 119. Oversee restoration work on Camp Adair 11/30/2010
Complete removal of encroaching trees and shrubs in upland meadow on Camp Adair AY: 53. Remove encroaching conifers and invasive species on Camp Adair 11/30/2010
Complete maintenance of native vegetation AZ: 22. Mow and spot spray to prevent invasive plant regrowth on Camp Adair 11/30/2010
Complete beaver landowner incentive survey BA: 157. Collect landowner survey data on Beaver impacts 11/30/2010
Complete analysis of beaver survey data BB: 162. Analyze and interpret beaver survey data 11/30/2010
Complete final project report for beaver survey BC: 141. Complete final report on beaver landowner survey 11/30/2010
Complete easements and acquisitions through MRT BD: 172. Complete appraisals and due diligence for Breggren and Green Island Addition Properties 11/30/2010
Complete easements through Greenbelt Land Trust BE: 172. Complete appraisals and due diligence for Little Willamette, Buena Vista, and other easements 11/30/2010
Complete identification of 2010 enhancement and O&M activities BF: 114. Identify enhancement and O&M activities for 2010 09/30/2010
Coordination of pre-acquisition activities BG: 172. Identify and coordinate pre-acquisition activities for 2010 11/30/2010
Baseline HEP Reports for Willamette sites BH: 87. Work with Regional HEP team to schedule and conduct FY10 HEP surveys 11/30/2010
Develop draft annual report BI: 132. Submit Progress Report for the period April 2009 to November 2010 11/30/2010
Complete 2010 stand assessments and invasive species distribution data collections BJ: 157. Collect hydrology data South Meadow and conduct stand assessments at Mt Pisgah/Buford Park 2010 11/30/2010
Prepare 2010 side channel area for excavation and excavate lower end to increase flows BK: 30. Open additional side channel (to Coast Fork Willamette) on main side channel 2010 08/31/2010
Complete 2010 planting on Sorenson and South Meadow BL: 47. Seed native grasses and forbs on South Meadow 2010 11/30/2010
Complete 2010 weed removal BM: 53. Treat/remove weeds in Sorenson Meadows and South Meadow 2010 11/30/2010
Implement 2010 prescribed burn BN: 31. Implement prescribed burn in oak savanna and upland prairie on Mt Pisgah 2010 10/31/2010
Complete plantings on E.E. Wilson's Pipit Meadow and Frontage Road BO: 47. Plant native forbs and grasses on Pipit sites on E.E. Wilson 2010 11/30/2010
Complete 2010 tree removal from wetland BP: 53. Treat/remove invasives on E.E. Wilson wetland sites 2010 09/30/2010
Complete educational and outreach activities BQ: 99. Host educational groups and community members to profile restoration work 2010 11/30/2010
Complete 2010 plantings BR: 47. Plant shrubs for habitat restoration on Big Island 2010 11/30/2010
Complete 2010 vegetation maintenance BS: 22. Irrigate and maintain past plantings on Big Island 2010 10/31/2010
Complete installation of woody debris BT: 29. Install instream woody debris on Big Island 2010 08/31/2010
Complete 2010 data collection BU: 157. Collect data on terrestrial habitat and aquatic systems on Big Island 2010 11/30/2010
Completed feasibility and assessment reports for Breggren Conservation Area BV: 115. CR assessment, decomissioning pond, vegetation inventory for Breggren CA 11/30/2010
Conduct community outreach and education BW: 99. Facilitate educational and community activities on Green Island 2010 09/30/2010
Complete 2010 installation of large woody debris. BX: 29. Install large woody debris in-stream on Green Island 2010 09/30/2010
Complete 2010 planting BY: 47. Plant trees and shrubs on Green Island 2010 11/30/2010
Complete road improvements BZ: 38. Improve road infrastructure 2010 11/30/2010
Complete 2010 perch and roost site installation on Green Island CA: 36. Install perch sites and artificial roosting sites for avian species on Green Island 2010 11/30/2010
Complete 2010 weed removal CB: 53. Remove exotic invasives on Green Island 2010 10/31/2010
Complete 2010 data collection and develop hydro models CC: 157. Monitoring species, hydrologic flows and planting success Green Island 2010 09/30/2010
Complete 2010 vegetation and tree removal CD: 53. Remove encroaching conifers and invasives from oak woodland on Zena 2010 09/30/2010
Complete appraisals CE: 172. Complete pre-acquisition appraisals for Trappist and Winter properties 09/30/2010
Coordinate easement restrictions and management plans CF: 119. Manage conservation easements for Lone Star, Little Willamette, and Buena Vista easements 2010 11/30/2010
Complete management plans for Little Willamette and Buena Vista easements CG: 174. Complete initial management plans for Little Willamette and Buena Vista easements 11/30/2010
Complete 2010 fence installation CH: 40. Install fence on Lone Star to protect at-risk plant communities 2010 11/30/2010
Complete 2010 conifer removal CI: 53. Remove conifers from oak woodlands on Lone Star 2010 11/30/2010
Remove and control invasive plants CJ: 53. Remove and control invasive plants on Buena Vista property 2010 11/30/2010
Complete access and parking site on Little Willamette and Buena Vista properties CK: 188. Construct gravel parking access to Little Willamette and Buena Vista properties for equipment 2010 11/30/2010
Complete biological assessments on Little Willamette and Buena Vista properties CL: 115. Complete biological assessments on on Little Willamette and Buena Vista properties 09/30/2010
Complete new planting maintenance CM: 22. Irrigate and mow around new plantings on Buena Vista property 11/30/2010
Complete seeding with native plants CN: 47. Plant native grasses and forbs after invasive plant removal on Camp Adair 11/30/2010
Complete maintenance of native vegetation CO: 22. Mow and spot spray to prevent invasive plant regrowth on Camp Adair 11/30/2010
Complete reference site identifications for CHAP CP: 114. Identify reference sites for CHAP comparisons 09/30/2010
GIS data and maps or aerial photos for verification and on-the-ground transects in support of CHAP CQ: 157. Collect and generate GIS and aerial photo materials for CHAP; complete on-the-ground transects 11/30/2010
Database system for CHAP work in Willamette Basin CR: 160. GIS data and shapefiles and assessment data maintenance for CHAP 11/30/2010
Posted information on web link CS: 161. Dissmeminate CHAP data via web links 11/30/2010
Complete data analysis for CHAP assessments CT: 162. Analyze data collected from field surveys for CHAP 11/30/2010
Complete tests and recommendations for revisions of accounting systems CU: 115. Test ecosystem services protocols for "Counting on the Environment" 11/30/2010
Complete evaluation of easement and management plan compliance CV: 141. Produce written annual report on Zena compliance 2010 11/30/2010
Remove and control invasive plants CW: 53. Remove and control invasive plants on Little Willamette property 2010 11/30/2010
Complete new planting maintenance CX: 22. Irrigate and mow around new plantings on Little Willamette property 2010 11/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 174 Produce Plan
Chub, Oregon (Oregonichthys crameri) (Endangered through FY2015)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 174 Produce Plan
Wildlife
  • 8 instances of WE 22 Maintain Vegetation
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 3 instances of WE 31 Conduct Controlled Burn
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 40 Install Fence
  • 10 instances of WE 47 Plant Vegetation
  • 14 instances of WE 53 Remove Vegetation
  • 2 instances of WE 122 Provide Technical Review and Recommendation
  • 6 instances of WE 174 Produce Plan
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Prepare NEPA/ESA documentation. 02/09/2007
B 119 Coordinate subcontracts, administer and develop budgets. 02/09/2007
C 189 Coordinate with CBFWA, NPCC, and BPA on regional wildlife issues. 02/09/2007
D 114 Identify enhancement and O&M activities for 2009 02/09/2007
E 172 Identify and coordinate pre-acquisition activities for 2009 02/09/2007
F 87 Work with Regional HEP team to schedule and conduct 2009 HEP surveys 02/09/2007
G 122 Provide technical review of management plans, floodplain restoration plans, and related documents 02/09/2007
H 160 Create and maintain reporting database and invoice tracking system for subcontracts. 02/09/2007
I 185 Periodic Status Reports for BPA 02/09/2007
J 132 Submit Progress Report for the period December 2007 to January 2008 02/09/2007
K 132 Submit Progress Report for the period January 2008 to April 2009 02/09/2007
L 119 Coordinate activities on Sorenson and South Meadows sites 02/09/2007
M 172 Complete pre-acquisition activities for potential acquisitions near Buford Park 02/09/2007
N 174 Work with Technical Advisory Group for long-term Management Plan 02/09/2007
O 157 Collect hydrology data South Meadow and conduct stand assessments at Mt Pisgah/Buford Park 2009 02/09/2007
P 30 Open additional side channel (to Coast Fork Willamette) on main side channel 2009 02/09/2007
Q 47 Seed native grasses and forbs on South Meadow 2009 02/09/2007
R 22 Maintain vegetation on Sorenson and South Meadow 08/09/2009
S 53 Treat/remove weeds in Sorenson Meadows and South Meadow 2009 02/09/2007
T 31 Implement prescribed burn in oak savanna and upland prairie on Mt Pisgah 2009 02/09/2007
U 47 Plant native forbs and grasses on Pipit sites on E.E. Wilson 2009 05/11/2007
V 53 Treat/remove invasive weeds on E.E. Wilson Frontage Rd. wetland 2009 05/11/2007
W 119 Manage and coordinate field crews on Big Island and Green Island 02/09/2007
X 99 Host educational groups and community members to highlight restoration work 2009 02/09/2007
Y 47 Plant shrubs for habitat restoration on Big Island 2009 08/19/2009
Z 22 Irrigate and maintain past plantings on Big Island 2009 08/19/2009
AA 53 Remove/control non-native, exotic species on Big Island 2009 08/19/2009
AB 29 Install instream woody debris on Big Island 2009 12/10/2009
AC 157 Collect data on terrestrial habitat and aquatic systems on Big Island 2009 02/09/2007
AD 122 Evaluate and Revise Management Plan Objectives 02/09/2007
AE 160 Maintain GIS database for Big Island. 02/09/2007
AF 99 Facilitate educational and community (public use) activities on Green Island 2009 02/09/2007
AG 174 Develop Management Plan for Green Island 02/09/2007
AH 29 Install large woody debris in-stream on Green Island 2009 10/27/2009
AI 30 Implement plan to improve hydrologic functions on Green Island 10/27/2009
AJ 47 Plant trees and shrubs on Green Island 2009 08/19/2009
AK 22 Maintain newly planted trees and shrubs on Green Island 2009 08/19/2009
AL 53 Remove exotic invasives on Green Island 2009 08/19/2009
AM 157 Monitoring of hydrologic flows and planting success Green Island 2009 02/09/2007
AN 174 Complete plan for Willamette Floodplain Restoration General Investigation Study 02/09/2007
AO 115 Inventory key invasive plants on Zena property 2009 02/09/2007
AP 47 Reseed with native grasses 10 ac Zena Property 2009 02/09/2007
AQ 31 Conduct controlled burn to enhance prairie on Zena 12/16/2009
AR 53 Remove encroaching conifers and invasives from oak woodland on Zena 2009 12/16/2009
AS 141 Produce written annual report on Zena compliance 2009 02/09/2007
AT 119 Manage conservation easement for Lone Star Property 2009 02/09/2007
AU 174 Complete initial management plan for Lone Star Property 02/09/2007
AV 53 Remove conifers from oak woodlands on Lone Star 2009 12/16/2009
AW 174 Develop habitat restoration/protection plan for Fender's blue butterflies 02/09/2007
AX 119 Oversee restoration work on Camp Adair 05/01/2009
AY 53 Remove encroaching conifers and invasive species on Camp Adair 05/01/2009
AZ 22 Mow and spot spray to prevent invasive plant regrowth on Camp Adair 05/01/2009
BA 157 Collect landowner survey data on Beaver impacts 05/01/2009
BB 162 Analyze and interpret beaver survey data 05/01/2009
BC 141 Complete final report on beaver landowner survey 05/01/2009
BD 172 Complete appraisals and due diligence for Breggren and Green Island Addition Properties 05/01/2009
BE 172 Complete appraisals and due diligence for Little Willamette, Buena Vista, and other easements 05/01/2009
BF 114 Identify enhancement and O&M activities for 2010 05/01/2009
BG 172 Identify and coordinate pre-acquisition activities for 2010 05/01/2009
BH 87 Work with Regional HEP team to schedule and conduct FY10 HEP surveys 05/01/2009
BI 132 Submit Progress Report for the period April 2009 to November 2010 05/01/2009
BJ 157 Collect hydrology data South Meadow and conduct stand assessments at Mt Pisgah/Buford Park 2010 07/12/2010
BK 30 Open additional side channel (to Coast Fork Willamette) on main side channel 2010 07/12/2010
BL 47 Seed native grasses and forbs on South Meadow 2010 07/12/2010
BM 53 Treat/remove weeds in Sorenson Meadows and South Meadow 2010 08/09/2010
BN 31 Implement prescribed burn in oak savanna and upland prairie on Mt Pisgah 2010 07/12/2010
BO 47 Plant native forbs and grasses on Pipit sites on E.E. Wilson 2010 07/12/2010
BP 53 Treat/remove invasives on E.E. Wilson wetland sites 2010 07/12/2010
BQ 99 Host educational groups and community members to profile restoration work 2010 05/01/2009
BR 47 Plant shrubs for habitat restoration on Big Island 2010 08/03/2010
BS 22 Irrigate and maintain past plantings on Big Island 2010 08/03/2010
BT 29 Install instream woody debris on Big Island 2010 08/03/2010
BU 157 Collect data on terrestrial habitat and aquatic systems on Big Island 2010 07/12/2010
BV 115 CR assessment, decomissioning pond, vegetation inventory for Breggren CA 05/01/2009
BW 99 Facilitate educational and community activities on Green Island 2010 05/01/2009
BX 29 Install large woody debris in-stream on Green Island 2010 07/15/2010
BY 47 Plant trees and shrubs on Green Island 2010 07/15/2010
BZ 38 Improve road infrastructure 2010 07/15/2010
CA 36 Install perch sites and artificial roosting sites for avian species on Green Island 2010 07/15/2010
CB 53 Remove exotic invasives on Green Island 2010 07/15/2010
CC 157 Monitoring species, hydrologic flows and planting success Green Island 2010 07/12/2010
CD 53 Remove encroaching conifers and invasives from oak woodland on Zena 2010 07/12/2010
CE 172 Complete pre-acquisition appraisals for Trappist and Winter properties 05/01/2009
CF 119 Manage conservation easements for Lone Star, Little Willamette, and Buena Vista easements 2010 05/01/2009
CG 174 Complete initial management plans for Little Willamette and Buena Vista easements 05/01/2009
CH 40 Install fence on Lone Star to protect at-risk plant communities 2010 07/12/2010
CI 53 Remove conifers from oak woodlands on Lone Star 2010 07/12/2010
CJ 53 Remove and control invasive plants on Buena Vista property 2010 07/15/2010
CK 188 Construct gravel parking access to Little Willamette and Buena Vista properties for equipment 2010 07/15/2010
CL 115 Complete biological assessments on on Little Willamette and Buena Vista properties 07/12/2010
CM 22 Irrigate and mow around new plantings on Buena Vista property 07/12/2010
CN 47 Plant native grasses and forbs after invasive plant removal on Camp Adair 07/12/2010
CO 22 Mow and spot spray to prevent invasive plant regrowth on Camp Adair 05/01/2009
CP 114 Identify reference sites for CHAP comparisons 05/01/2009
CQ 157 Collect and generate GIS and aerial photo materials for CHAP; complete on-the-ground transects 07/12/2010
CR 160 GIS data and shapefiles and assessment data maintenance for CHAP 05/01/2009
CS 161 Dissmeminate CHAP data via web links 05/01/2009
CT 162 Analyze data collected from field surveys for CHAP 05/01/2009
CU 115 Test ecosystem services protocols for "Counting on the Environment" 05/01/2009
CV 141 Produce written annual report on Zena compliance 2010 05/01/2009
CW 53 Remove and control invasive plants on Little Willamette property 2010 07/15/2010
CX 22 Irrigate and mow around new plantings on Little Willamette property 2010 07/12/2010