Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 4395: 2000-038-00 SPRING CHINOOK SUPPLEMENTATION-HATCHERY MASTER PLAN
Project Number:
Title:
Walla Walla Hatchery Final Design/Construction
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
4395
Contract Title:
2000-038-00 SPRING CHINOOK SUPPLEMENTATION-HATCHERY MASTER PLAN
Contract Continuation:
Previous: Next:
n/a
  • 32841: 2000-038-00 EXP WALLA WALLA HATCHERY PLANNING -STEP 1 SUPPORT
Contract Status:
Closed
Contract Description:
Project Title; Walla Walla Hatchery - Planning, Design, Construction, and Operation
Statement of Work and Budget FY2005

BPA Project Number:  2000-038-00
BPA Project Title: Walla Walla Hatchery - Planning, Design, Construction and Operation
Contract Number:  00004395
Contract Title: 2000-038-00 Spring Chinook Supplementation - Hatchery Master Plan
Performance/Budget Period: May 1, 2005 - December 31, 2005

Technical Contact Name: Gary James
Technical Contact Title: Fisheries Program Manager
Company / Agency Name: Confederated Tribes of the Umatilla Indian Reservation
Street Mailing Address: PO Box 638
City, ST Zip+4: Pendleton, OR 97801
Technical Contact Phone / Fax: Phone - (541) 966-2371 Fax - (541) 966-2397
Technical Contact email: garyjames@ctuir.com

Contracting Contact Name: Michelle Thompson
Contracting Contact Title: DNR Administrative Operations Manager
Company / Agency Name: Confederated Tribes of the Umatilla Indian Reservation
Street Mailing Address: PO Box 638
City, ST Zip+4: Pendleton, OR 97801
Technical Contact Phone / Fax: Phone - (541) 966-2323 Fax - (541) 276-3317
Contract Contact email: michellethompson@ctuir.com

Financial Contact Name: Paul Rabb
Financial Contact Title: Budget Compliance Officer
Company / Agency Name: Confederated Tribes of the Umatilla Indian Reservation
Street Mailing Address: PO Box 638
City, ST Zip+4: Pendleton, OR 97801
Technical Contact Phone / Fax: Phone - (541) 966-2113 Fax - (541) 966-2149
Contract Contact email: paulrabb@ctuir.com

Spring chinook have essentially been absent from the Walla Walla River subbasin for over 75 years. "The last run of importance was reported in 1925 and entered the river in May and early June" (Van Cleave and Ting 1960). Losses have generally been attributed to the development of agriculture and related irrigation diversions and channel dewatering within the basin.  In addition, the construction of Federal hydropower dams on the Columbia River changed the character of the mainstem migration corridor from a free-flowing river to a series of impoundments.  This development altered juvenile and adult migratory patterns, further compromising salmonid lifecycles.  
Under the FWP, the Northeast Oregon Hatchery Program (NEOH) was established in 1987. It was the initial artificial production planning effort by fishery co-managers for restoring anadromous fish runs in Northeast Oregon including the Walla Walla Subbasin. Little progress had been made towards meeting the NEOH goals since it was identified in the 1987 FWP and NEOH was reincorporated into the 1994 FWP (NPPC 1994).
As stated previously, a requirement of NEOH is that prior to design of facilities, a master plan be developed for each subbasin. The development of a Walla Walla Hatchery Master Plan (WWHMP) is authorized under 1994 FWProgram Measure 7.4L1 which directs BPA to "fund planning, design, construction, operation, maintenance and evaluation of artificial production facilities to raise chinook salmon and steelhead for enhancement in the Hood, Walla Walla, Grande Ronde and Imnaha rivers and elsewhere."
The development of the WWHMP was begun in the early 1990's under project #198805302 and was separated out as project #200020138 in 2000. Two draft master plans have been developed, one in 1993 and one in 1998. Neither plan was finalized as significant passage, flow, and/or habitat issues remained unresolved at the time. Considerable progress has been made in these areas to a point where implementation of the hatchery program is now warranted and a final Master Plan is now being developed for construction of hatchery facilities in the Walla Walla Subbasin.
Account Type(s):
Expense
Contract Start Date:
04/09/2001
Contract End Date:
12/31/2006
Current Contract Value:
$93,929
Expenditures:
$93,929

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Julie Burke Umatilla Confederated Tribes (CTUIR) No Administrative Contact julieburke@ctuir.org (541) 429-7292
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Gary James Umatilla Confederated Tribes (CTUIR) No Supervisor garyjames@ctuir.org (541) 429-7285
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Paul Rabb Umatilla Confederated Tribes (CTUIR) No Administrative Contact paulrabb@ctuir.org (541) 429-7165
Celeste Reeves Umatilla Confederated Tribes (CTUIR) No Administrative Contact celestereeves@ctuir.org (541) 429-7293
Michelle Thompson Umatilla Confederated Tribes (CTUIR) No Administrative Contact michellethompson@ctuir.org (541) 429-7227
Brian Zimmerman Umatilla Confederated Tribes (CTUIR) Yes Contract Manager brianzimmerman@ctuir.org (541) 429-7286


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Final Draft of Walla Walla Hatchery Master Plan A: 174. Revise Final Draft Walla Walla Hatchery Master Plan 11/18/2005 11/17/2005
CTUIR input to Council Decision on Proceeding to Step 2 B: 168. Step 1 Master Planning Process 10/01/2006
Step 2 Contract Documents submitted C: 119. Step 2 Budget Package 12/31/2006
status report completed and submitted D: 141. Status report in Word 10/13/2005 07/15/2005

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 174 Revise Final Draft Walla Walla Hatchery Master Plan
B 168 Step 1 Master Planning Process
C 119 Step 2 Budget Package
D 141 Status report in Word
E 185 Pisces Status reports