Contract 44273: 200002100 EXP LADD MARSH
Project Number:
Title:
Ladd Marsh Wildlife Mitigation
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
44273
Contract Title:
200002100 EXP LADD MARSH
Contract Continuation:
Previous: Next:
35446: 2000-021-00 EXP LADD MARSH
  • 49831: 2000-021-00 EXP LADD MARSH WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
The overall goal of the LMWA Additions mitigation project is to protect existing habitat values and restore degraded values that have occurred as a result of past and current land management practices on lands adjacent to or near the existing LMWA.  This Statement of Work (SOW) and associated budget address the maintenance and operation (O&M) and monitoring and evaluation (M&E) of enhancements on Wallender, Conley Lake, and Simonis properties. During the contract period of October 1, 2009 through September 30, 2010, project activities will focus on water and vegetation management to control non-native and invasive weeds as well as enhancement of desirable native vegetation.  In project wetlands, emergent vegetation has increased in density, creating near monocultures in some areas.  Mechanical treatment will be used where necessary to create openings and improve wildlife habitat in such areas.  

Portions of the Wallender tract have been kept dry since 2006 as negotiations proceed regarding alleged damage to crop yields on neighboring property due to changes in ground water depth and resulting salts at the surface.  

Monitoring will continue in the project area to assess vegetation and wildlife response to the habitat restoration project.  Monitoring includes a variety of vegetation and wildlife surveys including photopoints, vegetation transects, bird surveys and documentation of incidental observations.

The Ladd Marsh project provides a unique opportunity for outreach and education due to its location near La Grande, Oregon.  Numerous schools, including Eastern Oregon University utilize Ladd Marsh as an outdoor classroom and the area is visited by numerous classes each year.  Many of the organizers of such visits request tours, talks or presentations by Ladd Marsh staff.  Local service organizations also frequently request presentations about Ladd Marsh in general or the project in particular.
Account Type(s):
Expense
Contract Start Date:
10/01/2009
Contract End Date:
09/30/2010
Current Contract Value:
$73,544
Expenditures:
$73,544

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation A: 165. Produce Environmental Compliance Documentation 01/01/2010 01/31/2010
Summary of O&E activities in Progress Reports and Annual Report B: 99. Respond to requests for project tours and information 09/30/2010 06/25/2010
Diverse vegetation communities in the project area C: 22. Management activities to encourage native vegetation and control non-native vegetation. 09/30/2010 09/30/2010
Vegetation and wildlife survey data collected D: 157. Conduct field monitoring activities throughout the project 09/30/2010 09/30/2010
Summary data and photographs of project area E: 162. Compile, analyze and interpret monitoring data 09/30/2010 03/31/2010
Operate and maintain water control structures F: 186. Operate and maintain water control structures 09/30/2010 09/30/2010
Access and other information available to the public G: 188. Update and maintain access and information signs 09/30/2010 09/30/2010
FY 11 Funding Package (SOW, budget, Property inventory), plus September accrual estimate. H: 119. Manage and Administer Ladd Marsh Wildlife Area Additions Project 09/10/2010 09/10/2010
Attach Progress Report in Pisces I: 132. Submit Progress Report for the period October 2008 to September 2009 02/28/2010 03/31/2010
Diverse, native upland plant communities K: 47. Plant native species in upland areas 09/30/2010 09/30/2010
Remove trash and other debris from uplands, wetlands and streams. L: 27. Remove trash and other debris from uplands, wetlands and streams 09/30/2010 09/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Wildlife
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documentation 02/09/2007
B 99 Respond to requests for project tours and information 02/09/2007
C 22 Management activities to encourage native vegetation and control non-native vegetation. 03/31/2008
D 157 Conduct field monitoring activities throughout the project 08/06/2009
E 162 Compile, analyze and interpret monitoring data 02/09/2007
F 186 Operate and maintain water control structures 03/31/2008
G 188 Update and maintain access and information signs 03/31/2008
H 119 Manage and Administer Ladd Marsh Wildlife Area Additions Project 02/09/2007
I 132 Submit Progress Report for the period October 2008 to September 2009 02/09/2007
J 185 Periodic Status Reports for BPA 02/09/2007
K 47 Plant native species in upland areas 10/30/2009
L 27 Remove trash and other debris from uplands, wetlands and streams 03/31/2008