Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Submit invoices in timely manner | A: 119. Routine administration of contract | 10/31/2010 | 10/31/2010 | |
All EC and permits | B: 165. Provide BPA with all necessary EC/permits | 10/01/2009 | 10/01/2009 | |
Gravel 900-ft of existing road | C: 38. Gravel existing road | 11/30/2009 | 11/30/2009 | |
Installation of an inverted siphon to separate L-32 irrigation ditch flow from Agency Creek | D: 80. Install inverted siphon to separate L-32 irrigation ditch flow from Agency Creek | 11/30/2009 | 11/30/2009 | |
Apply NRCS approved seed mix to 0.25 acres disturbed area | E: 47. Reseed areas disturbed by construction activities | 11/30/2009 | 11/30/2009 | |
Attach Progress Report in Pisces | G: 132. Submit Progress Report for the period Oct 2009 thru December 2009 | 10/31/2010 | 10/31/2010 | |
Plant willows and cottonwoods, seed | H: 47. Restore vegetation to disturbed areas | 10/31/2010 | 10/31/2010 | |
Replace round rock with angular rock on stream banks | I: 80. replace rock | 10/10/2010 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Routine administration of contract | 10/01/2009 | ||||||
B | 165 | Provide BPA with all necessary EC/permits | 02/09/2007 | ||||||
C | 38 | Gravel existing road | 08/26/2009 | ||||||
D | 80 | Install inverted siphon to separate L-32 irrigation ditch flow from Agency Creek | 08/26/2009 | ||||||
E | 47 | Reseed areas disturbed by construction activities | 08/26/2009 | ||||||
F | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
G | 132 | Submit Progress Report for the period Oct 2009 thru December 2009 | 02/09/2007 | ||||||
H | 47 | Restore vegetation to disturbed areas | 05/10/2010 | ||||||
I | 80 | replace rock | 06/07/2010 |