Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 45564: 1998-019-00 EXP WIND RIVER WATERSHED
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
45564
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED
Contract Continuation:
Previous: Next:
41041: 199801900 EXP WIND RIVER WATERSHED USFS
  • 51064: 1998-019-00 EXP WIND RIVER WATERSHED USFS
Contract Status:
Closed
Contract Description:
The Wind River Watershed project is a collaborative effort to restore wild steelhead in the Wind River.  The four agencies forming the nucleus of this partnership include the US Forest Service (FS), Washington Department of Fish and Wildlife (WDFW), U.S. Geological Survey Columbia River Research Lab (CRRL), and Underwood Conservation District (UCD).  This partnership was established in the early 1990's and with support from BPA, has continued to conduct important habitat, research, monitoring and coordination activities across the subbasin.  The project works at multiple levels to identify and characterize key limiting habitat factors in the Wind River, to restore degraded habitats and watershed processes, to measure, track and document fish populations, life histories, and interactions, and to share information across agency and non-agency boundaries.

This contract funds continued habitat restoration within the Wind River watershed.  In FY10, work under this contract includes continued operation of the Wind River Gage to support all of the habitat and monitoring efforts underway across the watershed.  The contract will also fund decommissioning of a road and all of the required surveys, public involvement, environmental coordination and documentation to support the project.  Funds available for this contract are inadequate to cover the full cost of the road decommission, so the FS will be actively pursuing other sources of (non-BPA) funds to provide cost share and allow accomplishment of this important project.  The road to be decommissioned (Forest Road 3056) is currently a source of sediment to the Wind River, and blocks migration of juvenile steelhead, resident fish, and other aquatic organisms on at least three branches of Youngman Creek, a tributary to the upper Wind River.  Removal of the undersized and perched culverts and decommissioning of the road will improve the hydrologic performance of the Youngman Creek drainage by reducing overland water flows, and permitting the streams to properly function over a range of flows.  Sediment introduction to the Wind River will be reduced, and connectivity within the stream and riparian corridor will be re-established, improving migration for all life histories of fish and for other organisms that are an essential part of the aquatic ecosystem.  The road decommission project includes revegetation of the road surface and planting of trees at stream crossings.  In addition to work related to the decommission, this contract provides funding for identification and prioritization of outyear habitat project work in the watershed.
Account Type(s):
Expense
Contract Start Date:
12/01/2009
Contract End Date:
11/30/2010
Current Contract Value:
$34,155
Expenditures:
$34,155

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Erin Black US Forest Service (USFS) No Supervisor ekblack@fs.fed.us (509) 395-3411
Colleen Brower US Forest Service (USFS) No Administrative Contact cbrower@fs.fed.us (360) 956-2389
Bengt Coffin (USFS) US Forest Service (USFS) Yes Contract Manager bcoffin@fs.fed.us (509) 395-3425
Mary Haight Bonneville Power Administration Yes COR mthaight@bpa.gov (503) 230-3112
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Andrew Montano Bonneville Power Administration No Env. Compliance Lead ammontano@bpa.gov (503) 230-4145
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Assessment and associated reports B: 165. Document that all EC has been completed 05/31/2010 05/31/2010
Data collection C: 157. Operate and maintain Wind River Gage 11/30/2010 11/30/2010
Final report uploaded to the BPA website D: 132. Submit Annual Report for the period (Dec 2008) to (Nov 2009) 11/30/2010
Funding Package - Submit draft to COTR E: 119. Manage Wind River Project 11/04/2010 11/04/2010
Prioritized list of habitat restoration projects I: 114. Identify outyear habitat restoration work in the Wind River 11/30/2010
Attach Progress Report in Pisces J: 132. Submit Annual Report for the period (Dec 2007) to (Nov 2008) 11/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2009
B 165 Document that all EC has been completed 12/01/2009
C 157 Operate and maintain Wind River Gage 12/01/2009
D 132 Submit Annual Report for the period (Dec 2008) to (Nov 2009) 12/01/2009
E 119 Manage Wind River Project 12/01/2009
F 33 Decommission Road 3056 12/01/2009
G 47 Plant vegetation on decommissioned Road 3056 12/01/2009
H 184 Remove fish passage barrier culverts on Road 3056 12/01/2009
I 114 Identify outyear habitat restoration work in the Wind River 12/01/2009
J 132 Submit Annual Report for the period (Dec 2007) to (Nov 2008) 12/01/2009