Province | Subbasin | % |
---|---|---|
Columbia Plateau | Deschutes | 100.00% |
* Expenditures data includes accruals and are based on data through 28-Feb-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Jamie Cleveland | Bonneville Power Administration | Yes | COR | jacleveland@bpa.gov | (503) 230-3160 |
Israel Duran | Bonneville Power Administration | Yes | Env. Compliance Lead | induran@bpa.gov | (503) 230-3967 |
Scott Hayes | Oregon Department of Fish and Wildlife | No | Administrative Contact | scott.hayes@state.or.us | |
Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
Jerilyn Irvine | Oregon Department of Fish and Wildlife | No | Administrative Contact | jerilyn.irvine@state.or.us | (503) 947-6137 |
Rosemary Mazaika | Bonneville Power Administration | Yes | F&W Approver | rxmazaika@bpa.gov | (503) 230-5869 |
Tom Nelson | Oregon Department of Fish and Wildlife | Yes | Contract Manager | Tom.NELSON@odfw.oregon.gov | (541) 923-7470 |
Amy Stuart | Oregon Department of Fish and Wildlife | No | Supervisor | amy.m.stuart@state.or.us | (541) 388-6363 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
NEPA Compliance Requirements Complete For Habitat Restoration Projects To Be Implemented | A: 165. Obtain Environmental Compliance | 01/31/2011 | 01/31/2011 | |
Viable Restoration Projects Developed To Assist In The Attainment Of Project Goal | B: 114. Habitat Restoration Project Development | 01/31/2011 | 01/31/2011 | |
Remove noxious weeds and revegetate ground within Trout Creek project area. | C: 47. Revegetate Exclosure Area Within The Trout Creek Project Area | 01/31/2011 | 01/31/2011 | |
Willowdale Riparian Fence | D: 40. Install Fence To Exclude 2.5 Miles Of Trout Creek From Livestock Grazing | 12/10/2010 | ||
Develop Culvert replacement Specifications for Upper Trout Creek | E: 175. Develop Design Specifications For Upper Trout Creek Culvert Replacement | 01/31/2011 | 01/31/2011 | |
Replacement of undersized and semi-functional culverts in the Upper Trout Creek Basin | F: 38. Replace Undersized Culverts In Upper Trout Creek Basin | 01/31/2011 | ||
Develop Off Channel Water Sources For Livestock (If Identified) | G: 34. Develop Offsite Water Sources For Livestock | 01/31/2011 | 01/31/2011 | |
Monitor Trout Creek Basin Riparian Exclosures | H: 26. Monitor Exclosures | 01/31/2011 | 01/31/2011 | |
Maintained Fences & Water Gaps | I: 186. Maintain Riparian Corridor Fence | 01/31/2011 | 01/31/2011 | |
Maintained Bank Stabilization Structures | J: 186. Maintain Bank Stabilization Structures | 01/31/2011 | 01/31/2011 | |
Maintained Instream Structures | K: 186. Maintain Instream Structures | 01/31/2011 | 01/31/2011 | |
Repaired/Maintained Off Channel Water Development Sites | L: 186. Repair/Maintain Off Channel Water Development Sites | 01/31/2011 | 01/31/2011 | |
Document Physical Habitat Changes In Response To Restoration Actions Funded By BPA | M: 157. Document The Changes Of Habitat Restoration Practices in the Trout Creek basin. | 01/31/2011 | 01/31/2011 | |
Basin Wide Redd Counts | N: 157. Adult Redd Counts | 06/15/2010 | 06/15/2010 | |
Post Monitoring Of Major Channel Habitat Improvement Project | O: 157. Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches | 01/31/2011 | 01/31/2011 | |
Technical Assistance Provided | P: 122. Provide Technical Assistance & Input | 01/31/2011 | 01/31/2011 | |
Stream Water Temperature Monitored | Q: 157. Monitor Stream Water Temperature In The Trout Creek Basin | 01/31/2011 | 01/31/2011 | |
Data Captured In Two Data Bases (One For Adults & One for Juveniles) | R: 157. Monitor Smolt Production & Adult Escapement | 01/31/2011 | 01/31/2011 | |
Exclude Hatchery Summer Steelhead From Wild Trout Creek Summer Steelhead Stock | S: 190. Remove/Exclude Hatchery Summer Steelhead | 06/30/2010 | 06/30/2010 | |
Summer Steelhead Smolts PIT Tagged | T: 158. PIT Tag Outmigrant Summer Steelhead To Estimate Run Size | 09/30/2010 | 09/30/2010 | |
PIT Tag Data Submitted To PTAGIS | U: 159. Submit & Acquire PIT Tag Data To/From PTAGIS | 06/30/2010 | 06/30/2010 | |
ESA Listed Mid Columbia Summer Steelhead Monitored | V: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-migrant Estimates | 01/31/2011 | 01/31/2011 | |
Annual Report For Performance Period 2/1/09 - 1/31/10 | X: 132. Annual Report | 10/01/2010 | 10/01/2010 | |
Manage & Administer Project | Y: 119. Manage & Administer Project | 01/31/2011 | 01/31/2011 |
Primary Focal Species | Work Statement Elements |
---|---|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain Environmental Compliance | 02/01/2010 | ||||||
B | 114 | Habitat Restoration Project Development | 02/01/2010 | ||||||
C | 47 | Revegetate Exclosure Area Within The Trout Creek Project Area | 07/12/2010 | ||||||
D | 40 | Install Fence To Exclude 2.5 Miles Of Trout Creek From Livestock Grazing | 07/12/2010 | ||||||
E | 175 | Develop Design Specifications For Upper Trout Creek Culvert Replacement | 02/01/2010 | ||||||
F | 38 | Replace Undersized Culverts In Upper Trout Creek Basin | 02/01/2010 | ||||||
G | 34 | Develop Offsite Water Sources For Livestock | 07/12/2010 | ||||||
H | 26 | Monitor Exclosures | 02/01/2010 | ||||||
I | 186 | Maintain Riparian Corridor Fence | 03/31/2010 | ||||||
J | 186 | Maintain Bank Stabilization Structures | 03/31/2010 | ||||||
K | 186 | Maintain Instream Structures | 03/31/2010 | ||||||
L | 186 | Repair/Maintain Off Channel Water Development Sites | 03/31/2010 | ||||||
M | 157 | Document The Changes Of Habitat Restoration Practices in the Trout Creek basin. | 03/31/2010 | ||||||
N | 157 | Adult Redd Counts | 03/31/2010 | ||||||
O | 157 | Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches | 03/31/2010 | ||||||
P | 122 | Provide Technical Assistance & Input | 02/01/2010 | ||||||
Q | 157 | Monitor Stream Water Temperature In The Trout Creek Basin | 04/02/2010 | ||||||
R | 157 | Monitor Smolt Production & Adult Escapement | 03/31/2010 | ||||||
S | 190 | Remove/Exclude Hatchery Summer Steelhead | 03/31/2010 | ||||||
T | 158 | PIT Tag Outmigrant Summer Steelhead To Estimate Run Size | 03/31/2010 | ||||||
U | 159 | Submit & Acquire PIT Tag Data To/From PTAGIS | 02/01/2010 | ||||||
V | 162 | Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-migrant Estimates | 02/01/2010 | ||||||
W | 185 | Periodic Status Reports for BPA | 02/01/2010 | ||||||
X | 132 | Annual Report | 02/01/2010 | ||||||
Y | 119 | Manage & Administer Project | 02/01/2010 |