Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46273 REL 100: 2002-032-00 EXP NOAA SNAKE R. FALL CHINOOK LIFE HISTORY
Project Number:
Title:
Snake River Fall Chinook Salmon Life History Investigations
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
46273 REL 100
Contract Title:
2002-032-00 EXP NOAA SNAKE R. FALL CHINOOK LIFE HISTORY
Contract Continuation:
Previous: Next:
46273 REL 82: 2002-032-00 EXP NOAA SNAKE R. FALL CHINOOK LIFE HISTORY
  • 46273 REL 112: 2002-032-00 EXP NOAA SNAKE RIVER FALL CHINOOK LIFE HISTORY
Contract Status:
Closed
Contract Description:
Management of Snake River fall Chinook has been hindered by a great deal of uncertainty regarding key aspects of the ESU.  In particular, differential detectability of redds across source populations has limited the ability to accurately develop run reconstructions.  Further, migratory patterns of yearling migrants are largely unknown but spatially variable (Hegg et al. 2013), which makes it difficult to manage this segment of the population.  Therefore, we propose to conduct micro-chemical and micro-structural studies of otoliths in an effort to reduce these uncertainties.  In addition, information derived from these studies will be incorporated into ongoing efforts to develop life-history models and models of the fitness of alternative life-history strategies.
Account Type(s):
Expense
Contract Start Date:
04/01/2015
Contract End Date:
03/31/2016
Current Contract Value:
$126,828
Expenditures:
$126,828

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 03/31/2016 03/31/2016
Snake River Fall Chinook Adult Otolith Sampling (U of I will lead) B: 157. Snake River Fall Chinook Adult Otolith Sampling 03/31/2016 03/31/2016
Snake River Fall Chinook Juvenile Otolith Sampling (U of I/NOAA will co-lead) C: 157. Snake River Fall Chinook Juvenile Otolith Sampling 03/31/2016 03/31/2016
Water Chemistry Samples (U of I will lead) D: 157. Water Chemistry Sampling 03/31/2016 03/31/2016
Snake River Fall Chinook Otolith Micro-chemistry (NOAA/U of I will co-lead) E: 162. Snake River Fall Chinook Otolith Micro-chemistry 03/31/2016 03/31/2016
Snake River Fall Chinook Fish Classification (U of I will lead) F: 162. Snake River Fall Chinook Fish Classification 03/31/2016 03/31/2016
Snake River Fall Chinook Growth Analyses (NOAA will lead) G: 162. Snake River Fall Chinook Growth Analyses 03/31/2016 03/31/2016
Analyze Water Samples (NOAA/U of I will co-lead) H: 162. Water Chemistry Analysis 03/31/2016 03/31/2016
All administrative tasks fulfilled with timely quality products I: 119. Contract and project management for 2002-032-00 03/31/2016 03/31/2016
Submit BiOp RPA information to USGS for report for Calendar Year 2015 K: 202. BiOp RPA Report for CY 2015 03/15/2016 03/31/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 04/01/2015
B 157 Snake River Fall Chinook Adult Otolith Sampling 04/01/2015
C 157 Snake River Fall Chinook Juvenile Otolith Sampling 04/01/2015
D 157 Water Chemistry Sampling 04/01/2015
E 162 Snake River Fall Chinook Otolith Micro-chemistry 04/01/2015
F 162 Snake River Fall Chinook Fish Classification 04/01/2015
G 162 Snake River Fall Chinook Growth Analyses 04/01/2015
H 162 Water Chemistry Analysis 04/01/2015
I 119 Contract and project management for 2002-032-00 04/01/2015
J 132 Coauthor Progress Report for 2015 (1/1/2015 through 12/31/2015) 04/01/2015
K 202 BiOp RPA Report for CY 2015
L 185 Periodic Status Reports for BPA 04/01/2015