Contract 46273 REL 92: 2007-402-00 EXP NOAA SOCKEYE SALMON CAPTIVE BROOD
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
46273 REL 92
Contract Title:
2007-402-00 EXP NOAA SOCKEYE SALMON CAPTIVE BROOD
Contract Continuation:
Previous: Next:
46273 REL 74: 2007-402-00 EXP NOAA SOCKEYE SALMON CAPTIVE BROOD
  • 46273 REL 108: 2007-402-00 EXP NOAA SOCKEYE SALMON CAPTIVE BROOD
Contract Status:
Closed
Contract Description:
PROJECT GOAL:

The project's primary goal is to provide a safety net captive broodstock population that can be used to sustain Snake River sockeye salmon (Oncorhynchus nerka).  The program's secondary goal is to generate fish that can be used to speed the rebuilding of this population listed as Endangered under the U. S. Endangered Species Act.

The Salmon Subbasin Plan includes these future goals for Redfish Lake Sockeye:

• Natural spawning component of 2,000 adults, based on the NOAA Fisheries interim abundance de-listing criteria.
• Long-term return of 8,000 - 44,500, based on management plans.
• For FY 2015 produce up to 1,000 maturing adults that can be released to spawn naturally or used to produce up to 600,000 eyed eggs for transfer to Columbian Basin smolt production facilities.


BACKGROUND:

The National Oceanic and Atmospheric Administration's National Marine Fisheries Service (NOAA Fisheries), Northwest Fisheries Science Center (NWFSC), in partnership with Idaho Department of Fish and Game (IDFG) has been maintaining U.S. Endangered Species Act (ESA) listed Snake River sockeye salmon from Redfish Lake, Idaho in a captive broodstock program since 1991.  Captive broodstocks are a form of artificial propagation where fish are cultured in captivity for most or all of their life cycle.  These programs provide a safety net to prevent populations from going extinct.  Captive broodstock programs generate much higher egg-to-spawner survival (usually > 50%) than occurs in nature (usually < 0.2 %).  This higher in-culture survival of captive broodstock salmon enables them to produce a large number of eyed eggs, fry, and smolts per generation for use in restoration programs.  This large number of progeny per generation is being used by the program to "jumpstart" the restoration of ESA-listed endangered Redfish Lake sockeye salmon.

In the Salmon Subbasin Summary, Federal, state, and tribal agencies repeatedly call for artificial production programs, like the Redfish Lake sockeye salmon captive broodstock program, to meet goals and objectives (Section 5.2, Fisheries Needs 14 and 15).  The continuation of current programs, such as the Redfish Lake sockeye salmon captive broodstock program, is also a required reasonable and prudent action (Item 177) in the NOAA Fisheries 2000 FCRPS Biological Opinion and an Updated Proposed Action (Hatchery UPA 13) in the 2004 Biological Opinion on Remand (Sections 6.14.2.3 and 9.3).  In addition, the implementation and refinement of captive broodstocks for the recovery of Snake River sockeye salmon have been identified as priorities in the 1994 Northwest Power Planning Council's (NWPPC) Columbia Basin Fish and Wildlife Program (7.4A.1-3), are part of the overarching and regional objectives of the 2000 NWPPC Columbia Basin Fish and Wildlife Program, and are priorities described in the NOAA Fisheries proposed Recovery Plan for Snake River salmon.

Between 1991 and 2014, NOAA Fisheries has captive reared the progeny of sockeye salmon that returned to Redfish Lake.  Maturity of these fish in captivity from fall 1994 through 2014 has resulted in hundreds of prespawning adults; hundreds of thousands of eyed eggs; and thousands of juveniles being provided to IDFG for release to Stanley Basin lakes.  In upcoming years, the cooperative NOAA Fisheries/IDFG Redfish Lake captive broodstock program should continue to provide large numbers of animals for use in recovery efforts.  NOAA Fisheries feels that continuation of cooperative captive broodstock programs is imperative to aid recovery of Redfish Lake sockeye salmon.


EXPECTED OUTCOME:

Because of the critically low population size of Redfish Lake sockeye salmon, captive broodstocks appear to offer the only hope to maintain the species while habitat improvements are underway.  The maintenance of geographically separate captive brood populations at Eagle, Idaho and Manchester-Burly, Washington will remain a key factor in reducing the risk of catastrophic loss of the Redfish Lake sockeye salmon gene pool from mechanical failure, human error, or disease.   The NOAA-Fisheries captive broodstock project expects to produce up to 1,000 maturing fish during the current contract cycle.  It is anticipated the project will supply up to 600,000 eyed eggs for use in the smolt production programs during this contract cycle.  During this contract cycle the project will continue to maintain at least 1000 fish from each of three broodyears in the safety net for this ESA listed stock.  In aggregate, these actions will continue to prevent the extinction of Snake River Sockeye salmon and produce fish for release in the rebuilding of this ESA listed species.
Account Type(s):
Expense
Contract Start Date:
01/01/2015
Contract End Date:
02/15/2016
Current Contract Value:
$1,076,026
Expenditures:
$1,076,026

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All Environmental Compliance Activities Complete A: 165. Obtain Environmental Compliance 12/31/2015 12/31/2015
Snake River sockeye RPA/BiOp data submission to IDFG project leader B: 202. Snake River sockeye RPA/BiOp Data 03/01/2015 03/01/2015
FY 15 Burley Creek Freshwater Rearing Location Maintenance Activities Complete C: 61. Burley Creek Freshwater Rearing Location 02/15/2016 02/15/2016
FY 15 Manchester Research Station Seawater Rearing Location Activities Complete D: 61. Manchester Research Station Seawater Rearing Location 12/31/2015 12/31/2015
FY 15 Fish Culture Coordination Activities Complete E: 189. Regional Coordination- Fish Culture Activities 12/31/2015 12/31/2015
Incubate and rear BY 2014 Snake River Sockeye Salmon Captive Broodstock Alevins, Fry and Fingerlings F: 176. Incubate and rear BY 2014 captive broodstock 12/31/2015 12/31/2015
Rear BY 2013 captive broodstock G: 176. Rear BY 2013 captive broodstock 12/31/2015 12/31/2015
Rear BY 2012 Captive Broodstock H: 176. Rear BY 2012 captive broodstock 12/31/2015 12/31/2015
Rear BY 2011 captive broodstock I: 176. Rear BY 2011 captive broodstock 12/31/2015 12/31/2015
Rear BY 2010 Captive Broodstock J: 176. Rear BY 2010 captive broodstock 12/31/2015 09/30/2015
Spawn, fertilize and incubate BY 2015 eggs K: 176. Spawn BY 10, 11, 12 mature fish and fertilize and incubate their eggs to produce 2015 eyed eggs 12/31/2015 12/31/2015
2015 annual maintenance plan for NOAA sockeye salmon culture facilities L: 174. 2015 annual maintenance plan for NOAA sockeye salmon culture facilities 09/30/2015 09/30/2015
Attach Progress Report in Pisces N: 132. Submit Final Progress Report for the period January 2014 to December 2014 12/31/2015
Project Mgmt. and Admin Activities Complete and submittal of new FY contract package O: 119. Manage Project And Prepare New FY SOW With Budget 12/31/2015 12/31/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 6 instances of WE 176 Produce Hatchery Fish
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Environmental Compliance 01/01/2015
B 202 Snake River sockeye RPA/BiOp Data
C 61 Burley Creek Freshwater Rearing Location 01/01/2015
D 61 Manchester Research Station Seawater Rearing Location 01/01/2015
E 189 Regional Coordination- Fish Culture Activities 01/01/2015
F 176 Incubate and rear BY 2014 captive broodstock 01/01/2015
G 176 Rear BY 2013 captive broodstock 01/01/2015
H 176 Rear BY 2012 captive broodstock 01/01/2015
I 176 Rear BY 2011 captive broodstock 01/01/2015
J 176 Rear BY 2010 captive broodstock 01/01/2015
K 176 Spawn BY 10, 11, 12 mature fish and fertilize and incubate their eggs to produce 2015 eyed eggs 01/01/2015
L 174 2015 annual maintenance plan for NOAA sockeye salmon culture facilities 01/01/2015
M 132 Submit Final Progress Report for the period December, 2012 to December 2013 01/01/2015
N 132 Submit Final Progress Report for the period January 2014 to December 2014 01/01/2015
O 119 Manage Project And Prepare New FY SOW With Budget 01/01/2015
P 185 Periodic Status Reports for BPA 01/01/2015