Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46374: 2007-127-00 EXP SOUTH FORK SALMON WATERSHED RESTORATION
Project Number:
Title:
East Fork of South Fork Salmon River Passage Restoration
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
46374
Contract Title:
2007-127-00 EXP SOUTH FORK SALMON WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
41069: 200712700 EXP NPT SOUTH FORK SALMON WATERSHED RESTORATION
  • 52253: 2007-127-00 EXP SOUTH FORK SALMON WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
The watershed restoration work elements within this project area, the South Fork Salmon River Watershed, follow the watershed restoration approach adopted by the Nez Perce Tribe (NPT) Department of Fisheries Resource Management (DFRM) - Watershed Division.  The vision of the NPT DFRM - Watershed Division  focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government.  The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects and strategies that rely on natural fish production and healthy river ecosystems.  The NPT DFRM - Watershed Division strives towards maximizing historic ecosystem productivity and health for the restoration of anadromous and resident fish populations and the habitat on which all depend for future generations.

PROJECT GOAL:
The ultimate goal of this ongoing project is to work with the holistic, ridge top to ridge top approach to protect and restore the ecological and biological functions of the South Fork Salmon River Watershed to assist in the recovery and protection of anadromous and resident fish species, and all other fish and wildlife.

PROJECT SUMMARY:
FY 08 implementation included a comprehensive road inventory and assessment to prioritize future road decommissioning and road-trail conversions, the design of the Salt, Profile, and Parks Creek culvert replacement Aquatic Organism Passage (AOP) projects, the Subcontracting of the Salt & Profile Creek Bridge projects, and many hours of planning cooperatively with the Payette National Forest.

FY09 implementation for this ongoing project included Parks Creek Bridge design and Subcontract, the replacement of 3 fish passage barrier culverts with pre-stressed, pre-cast concrete free-span modular bridges over Salt, Profile, and Parks Creeks returning 15.64 miles of fish habitat,  decommissioning of 22 miles of roads within the Secesh River subwatershed, continuation of road surveys and transportation planning in sub-watersheds, and planning for fish barrier data collection for the entire South Fork Salmon Watershed on the Payette and Boise National Forests to identify future high priority restoration projects.  Also in FY09, we applied for a Pacific Coastal Salmon Recovery Fund (PCSRF) grant with the Idaho Office of Species Conservation (OSC) to fund a Conservation Easement on the Wapiti Meadow Ranch along Johnson Creek.  This effort represents a Partnership between the Nez Perce Tribe Fisheries-Watershed, the Wapiti Meadow Owner, and the Rocky Mountain Elk Foundation.  The grant application was reviewed by the PCSRF Funding Board.  The Board voted to set aside reserve funds in the amount of $866,250.00 to fund this very important project.  On June 30, 2010, Mike Edmondson of OSC and Eric Leitzinger of IDFG toured the property with NPT Staff and on Tuesday,  the OSC Board vote to fund the Wapiti Meadow CE in full.

The FY10 Statement of Work for this ongoing project includes Project Management, Coordination, and Administration activities including Wapiti Meadows Ranch Conservation Easement activities, the replacement of 6 fish passage barrier culverts to return 7.3 miles of fish habitat,  decommissioning of 10 - 20 miles roads within the South Fork Salmon River watershed, completion of road surveys and transportation planning in sub-watersheds, and completion of fish barrier data collection for the entire South Fork Salmon Subbasin on the Payette and Boise National Forests to identify future high priority restoration projects.  All this work will be performed in cooperation with the Payette and Boise National Forests, with the intent of prioritizing protection and restoration projects watershed-wide into the future, resulting in a comprehensive Watershed Restoration Strategy.   A minimum 30% cost share will be provided by the Payette and Boise National Forests including cash and in-kind contributions.

FY10 and future year Project Management, Coordination, and Administration activities will all include work on the Wapiti Meadow Ranch Conservation Easement, as well as Restoration Implementation once the Easement is in place.
Account Type(s):
Expense
Contract Start Date:
04/01/2010
Contract End Date:
06/30/2011
Current Contract Value:
$765,641
Expenditures:
$765,641

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Bruce Hollen Bonneville Power Administration Yes Env. Compliance Lead bahollen@bpa.gov (503) 230-5756
Wesley Keller Nez Perce Tribe Yes Contract Manager wesleyk@nezperce.org (208) 634-3031
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Joyce Sisson Nez Perce Tribe Yes Technical Contact siss5354@vandals.uidaho.edu (208) 630-3405
Emmit Taylor, Jr. Nez Perce Tribe Yes Supervisor emmitt@nezperce.org (208) 621-3544
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package - Submit draft to COTR A: 119. Project Management, Coordination, and Administration 01/31/2011 02/17/2011
Provide Environmental Compliance Documentation to BPA B: 165. Provide Environmental Compliance Documentation to BPA 12/31/2010 12/31/2010
List of Selected Roads to Decommission in FY2011 C: 114. Select Roads to be decommissioned In FY11 03/01/2011 03/01/2011
Decommission 10 - 20 Miles of Forest Roads D: 33. Decommission 10 - 20 Miles of Forest Roads 12/31/2010 12/31/2010
Road Decommissioning: Plant Seed/Revegetate E: 47. Road Decommissioning: Plant Seed/Revegetate 11/26/2010 11/26/2010
Design 1-3 Fish Barrier Culvert Replacement Project(s) F: 175. Design Burgdorff and Willow Creek AOP Bridge projects in Secesh River drainage 06/30/2011
Construct Three Curtis Creek AOP Bridges G: 184. Construct Three (3) Curtis Creek Bridges 10/29/2010 10/29/2010
Construct Mormon Creek Bridge H: 184. Construct Mormon Creek Bridge 11/15/2010
Construct Two Trail Creek Bridges I: 184. Construct Two (2) Trail Creek Bridges 11/19/2010 11/19/2010
Plant Native Vegetation & Grass Seed in Curtis and Trail Creek Project Areas J: 47. Plant Curtis and Trail Creek Bridge sites 11/12/2010 11/12/2010
Plant Native Vegetation & Grass Seed in Mormon Creek Project Area K: 47. Plant Mormon Creek Bridge Site 11/26/2010
Collect and Analyze Stream Crossing Data for Year 1 AOP Projects Constructed in FY09 L: 157. Collect and Analyze Stream Crossing Data for Year 1 AOP Projects FY09 03/25/2011 03/24/2011
GIS database and road treatment prescriptions M: 115. Compile South Fork Salmon River Watershed Road Survey Data 03/25/2011 03/24/2011
Collect Post-Project Year 0 Data on Culvert Replacements N: 157. Collect/Document Post-Project Year 0 Data on Culvert Replacements 03/16/2011 03/16/2011
Compile and Analyze Stream Crossing Data for the South Fork Salmon River Watershed O: 115. Compile and Analyze Stream Crossing Data for the South Fork Salmon River Watershed 03/31/2011 03/24/2011
Design Big Creek Bridge R: 175. Design Big Creek Bridge 06/30/2011 06/01/2011
Design Three Mile Creek and Jeanette Creek Fish Passage Structures S: 175. Design Three Mile and Jeanette Creek Culvert Replacements 06/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 3 instances of WE 47 Plant Vegetation
  • 2 instances of WE 184 Install Fish Passage Structure
  • 2 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 3 instances of WE 47 Plant Vegetation
  • 3 instances of WE 184 Install Fish Passage Structure
  • 3 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 3 instances of WE 47 Plant Vegetation
  • 3 instances of WE 184 Install Fish Passage Structure
  • 3 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 3 instances of WE 47 Plant Vegetation
  • 3 instances of WE 184 Install Fish Passage Structure
  • 3 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project Management, Coordination, and Administration 04/01/2010
B 165 Provide Environmental Compliance Documentation to BPA 04/01/2010
C 114 Select Roads to be decommissioned In FY11 04/01/2010
D 33 Decommission 10 - 20 Miles of Forest Roads 06/10/2010
E 47 Road Decommissioning: Plant Seed/Revegetate 04/01/2010
F 175 Design Burgdorff and Willow Creek AOP Bridge projects in Secesh River drainage 04/01/2010
G 184 Construct Three (3) Curtis Creek Bridges 04/01/2010
H 184 Construct Mormon Creek Bridge 04/01/2010
I 184 Construct Two (2) Trail Creek Bridges 04/01/2010
J 47 Plant Curtis and Trail Creek Bridge sites 04/01/2010
K 47 Plant Mormon Creek Bridge Site 04/12/2010
L 157 Collect and Analyze Stream Crossing Data for Year 1 AOP Projects FY09 04/01/2010
M 115 Compile South Fork Salmon River Watershed Road Survey Data 04/01/2010
N 157 Collect/Document Post-Project Year 0 Data on Culvert Replacements 04/01/2010
O 115 Compile and Analyze Stream Crossing Data for the South Fork Salmon River Watershed 04/01/2010
P 185 Periodic Status Reports for BPA 04/01/2010
Q 132 Submit Progress Report for the period 4.1.10 thru 3.31.11 04/01/2010
R 175 Design Big Creek Bridge 04/01/2010
S 175 Design Three Mile and Jeanette Creek Culvert Replacements 04/01/2010