Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Final Site List compliance for acclimation | B: 165. Final site list compliance for acclimation | 01/31/2011 | 01/31/2011 | |
Data Collection and Analysis | C: 157. Collect Water Quality Data | 01/31/2011 | 01/31/2011 | |
Funding Package - Submit draft to COTR | D: 119. Manage Expanded Acclimation Project | 11/01/2010 | 11/01/2010 | |
Stakeholder Coordination | E: 191. Coordination of Plan with Regional Stakeholders | 01/31/2011 | 01/31/2011 | |
Annual comprehensive report to cover activities from 3/1/09 to 12/31/10 | F: 132. Progress report delivering accomplishments through the CY09 | 01/31/2011 | ||
Develop/expansion of a acclimation pond | G: 35. Develop a pond within the Methow basin on the Twisp River-Lincoln Pond | 11/01/2010 | 11/01/2010 | |
PIT tag spring Chinook and/or steelhead | H: 158. tag up to 30K steelhead and/or spring Chinook in the Wenatchee and Methow basins | 01/31/2011 | 12/20/2010 | |
acclimate spring Chinook and/or steelhead | I: 56. potentially acclimate spring Chinook or steelhead within this contract period | 01/31/2011 | ||
well installed at Lincoln Pond | J: 171. Production well installed at Lincoln Pond | 09/01/2010 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 05/01/2010 | ||||||
B | 165 | Final site list compliance for acclimation | 05/01/2010 | ||||||
C | 157 | Collect Water Quality Data | 05/01/2010 | ||||||
D | 119 | Manage Expanded Acclimation Project | 05/01/2010 | ||||||
E | 191 | Coordination of Plan with Regional Stakeholders | 05/01/2010 | ||||||
F | 132 | Progress report delivering accomplishments through the CY09 | 05/01/2010 | ||||||
G | 35 | Develop a pond within the Methow basin on the Twisp River-Lincoln Pond | |||||||
H | 158 | tag up to 30K steelhead and/or spring Chinook in the Wenatchee and Methow basins | |||||||
I | 56 | potentially acclimate spring Chinook or steelhead within this contract period | |||||||
J | 171 | Production well installed at Lincoln Pond |