Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 51636: 2009-001-00 EXP EXPANDED MULTI-SPECIES ACCLIMATION
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Acclimation
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Methow 50.00%
Wenatchee 50.00%
Contract Number:
51636
Contract Title:
2009-001-00 EXP EXPANDED MULTI-SPECIES ACCLIMATION
Contract Continuation:
Previous: Next:
47427: 2009-001-00 EXP ACCORD EXPANDED MULTI-SPECIES ACCLIMATION
  • 55960: 2009-001-00 EXP EXPANDED MULTI-SPECIES ACCLIMATION
Contract Status:
Closed
Contract Description:
This acclimation project proposes to further develop acclimation for upper Columbia steelhead and spring Chinook by developing new semi-natural ponds similar to what has been uniquely successful in the Mid-Columbia Coho Restoration Project (BPA Project #19-96-04000).  This would involve utilizing the existing PUD/Federal mitigation production in the region that is currently doing either direct stream plants or single point, large releases and expand/refine those releases by adding additional acclimation releases in known habitat reaches within the Wenatchee and Methow watersheds.   This strategy will enhance the goals of recovery for these two listed stocks.

Since a comprehensive plan has already been complied through the efforts of YN staff and sub-contracted work from ANCHOR Environmental and been successfully accepted through the ISRP/NPCC processes, the FY11 contracting period will focus on preparing site(s) for on-the-ground operations as soon as the spring of 2011 in both the Methow and Wenatchee basins.  Primary objectives for this project in 2011-2012 is to beginning implementing steelhead acclimation at Rohlfing's Pond in the Wenatchee Basin as well as design, construct and acclimate spring Chinook at Biddle Pond (upper Methow drainage) and Winthrop NFH back channel in the Methow Basin.  YN will continue with various field studies and site data collection, if not already completed, to determine if potential, identified rearing sites will have the ability to rear these species of concern and at what level.  Management throughout this whole process will be key in implementation.
Account Type(s):
Expense
Contract Start Date:
02/01/2011
Contract End Date:
07/31/2012
Current Contract Value:
$405,796
Expenditures:
$405,796

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Tana Hoptowit Yakama Confederated Tribes No Interested Party hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Technical Contact kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Contract Manager scrt@yakamafish-nsn.gov (503) 331-9850
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129
Nancy Weintraub Bonneville Power Administration Yes Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Produce plan for 2012 spring Chinook and steelhead A: 174. # 2012 Multispecies rearing plan 01/31/2012 01/31/2012
Final Site List compliance for acclimation C: 165. Final site list compliance for acclimation 01/31/2012 01/31/2012
Data Collection and Analysis D: 157. Collect Water Quality Data 01/31/2012 01/31/2012
Funding Package - Submit draft to COTR E: 119. Manage Expanded Acclimation Project 01/31/2012 01/31/2012
Stakeholder Coordination F: 191. Coordination of Plan with Regional Stakeholders 01/31/2012 01/31/2012
Annual comprehensive report to cover activities from 3/1/11 to 12/31/11 G: 132. Comprehensive progress report delivering accomplishments from project initiation through the CY11 05/31/2012
Development of acclimation ponds H: 35. # Develop ponds within the Methow basin on the Twisp River 01/31/2012
PIT tag spring Chinook and/or steelhead I: 158. Tag up to 52K steelhead and/or spring Chinook in the Wenatchee and Methow basins 01/31/2012 01/31/2012
acclimate spring Chinook in CY2011. J: 176. Acclimate spring Chinook at Biddle Pond and Winthrop NFH 01/31/2012 06/30/2011
acclimate steelhead in CY2011. K: 176. Acclimate steelhead at Rohlfing's Pond 01/31/2012 06/30/2011
Repair/Upgrade a irrigation diversion to provide a water source for acclimation at Goat Wall L: 171. ## Repair and upgrade a water delivery system located on Gate Cr. 11/01/2011 11/01/2011
Secure groundwater and bridge stabilization at Rohlfing's Pond M: 171. ## Secure groundwater and bridge stabilization at Rohlfing's Pond 07/30/2012 07/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 35 Develop Pond
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 35 Develop Pond
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 174 # 2012 Multispecies rearing plan 02/01/2011
B 185 Periodic Status Reports for BPA 02/01/2011
C 165 Final site list compliance for acclimation 02/01/2011
D 157 Collect Water Quality Data 02/01/2011
E 119 Manage Expanded Acclimation Project 02/01/2011
F 191 Coordination of Plan with Regional Stakeholders 02/01/2011
G 132 Comprehensive progress report delivering accomplishments from project initiation through the CY11 02/01/2011
H 35 # Develop ponds within the Methow basin on the Twisp River 09/04/2011
I 158 Tag up to 52K steelhead and/or spring Chinook in the Wenatchee and Methow basins 02/24/2011
J 176 Acclimate spring Chinook at Biddle Pond and Winthrop NFH 02/01/2011
K 176 Acclimate steelhead at Rohlfing's Pond 02/01/2011
L 171 ## Repair and upgrade a water delivery system located on Gate Cr. 10/26/2011
M 171 ## Secure groundwater and bridge stabilization at Rohlfing's Pond 03/01/2012