Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 48418: 1996-035-01 EXP BIOP M&E TOPPENISH CREEK
Project Number:
Title:
Yakama Reservation Watershed Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
48418
Contract Title:
1996-035-01 EXP BIOP M&E TOPPENISH CREEK
Contract Continuation:
Previous: Next:
n/a
  • 56662 REL 6: 1996-035-01 EXP BIOP M&E TOPPENISH CREEK
Contract Status:
Closed
Contract Description:
The objective of this project is to monitor status and trends of the steelhead population in the Toppenish Creek watershed.  We intend to use a redd count census conducted on all known spawning habitats in the basin to obtain an index of steelhead spawner abundance.  We will attempt to use methods and models under development in the upper Columbia to arrive at an estimate of steelhead adult spawner  abundance.  Abundance estimates will incorporate redd counts, information on redd life, regional data on the number of redds per female (or information obtained from the Yakima VSP 201003000 monitoring radio tracking study), annual Yakima basin sex ratios observed at Prosser dam, and mark-resight data collected to evaluate observer efficiency.

We will evaluate the steelhead abundance estimate by using radio tracking data collected under the Yakima VSP project during years 2011-2013.   Prosser Dam Counts will be partitioned to individual tributaries including Toppenish Creek based on proportions of a representative sample radio tagged at Prosser and tracked to their final spawning location.  When Genetic Stock Identification (GSI) data collected from Prosser dam and analyzed as part of the Yakima VSP project becomes available for the Yakima MPG we will use this information to compare estimates.  Like the radiotracking study, GSI data will be used to disaggregate the Prosser dam count into the four distinct populations (including Toppenish).  If spawner estimates from these different methods differ substantially we will consider constructing a total upstream/downstream resistance board weir at the mouth of Toppenish Creek the following year (summer 2012).

We will operate a rotary screw trap continuously capturing the entire spawning season to obtain an estimate of steelhead juvenile outmigration.  In addition to monitoring the Toppenish Creek  steelhead population viability, we will use this information in the development of an IMW to evaluate restoration activities planned in the basin.
Account Type(s):
Expense
Contract Start Date:
07/01/2010
Contract End Date:
06/30/2012
Current Contract Value:
$509,359
Expenditures:
$509,359

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes Yes Technical Contact adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Tim Resseguie Yakama Confederated Tribes Yes Technical Contact rest@yakamafish-nsn.gov (509) 945-7409
Brandon Rogers Yakama Confederated Tribes Yes Contract Manager rogb@yakamafish-nsn.gov (509) 949-4109
Jennifer Stolz Bonneville Power Administration Yes Interested Party jpstolz@bpa.gov (503) 230-3233
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Protocol for redd count surveys and screw trapping A: 156. Develop methods to obtain estimates of steelhead population parameters 04/30/2011 03/07/2011
Produce steelhead redd count for Toppenish Creek B: 157. Conduct steelhead spawning surveys in Toppenish Creek 06/15/2012 06/30/2011
Gages capable of providing real time flow data and automated stage measurements C: 148. Install stream gauges on Toppenish Creek 10/14/2010 10/01/2010
Produce hydrographs at automated gaging stations D: 157. Collect wading discharge measurements and download gage data 06/30/2012 06/30/2011
Install rotary screw traps E: 70. Install rotary screw trap 11/01/2010 11/04/2010
steelhead juvenile catch and estimates of efficiency F: 157. Collect Juvenile Steelhead 06/30/2012 06/30/2011
Estimate steelhead population parameters G: 162. Analyze raw data collected from screw traps and surveys to develop population estimates (year 1) 08/31/2011 06/30/2011
Funding Package - Submit draft to COTR I: 119. Manage RM&E Activities on Toppenish Creek 03/01/2012 06/28/2011
Completed environmental documentation K: 165. Environmental Compliance Year 1 07/15/2010 12/31/2010
PIT tag juvenile steelhead L: 158. PIT tag junenile steelhead 06/28/2012
Attach Progress Report in Pisces M: 132. Submit Progress Report for the period July 2010 to June 2011 06/30/2012 06/28/2012
Completed environmental documentation N: 165. Environmental Compliance Year 2 09/01/2011 09/01/2011
Estimate steelhead population parameters for MY2012 O: 162. Analyze raw data collected from screw traps and surveys to develop population estimates (Year 2) 08/30/2012
Steelhead Juvenile survival estimates P: 162. Analyze PIT tag detections at downstream detection facilities to estimate survival

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 3 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 156 Develop methods to obtain estimates of steelhead population parameters 04/01/2010
B 157 Conduct steelhead spawning surveys in Toppenish Creek 06/30/2011
C 148 Install stream gauges on Toppenish Creek 04/01/2010
D 157 Collect wading discharge measurements and download gage data 06/30/2011
E 70 Install rotary screw trap 06/30/2011
F 157 Collect Juvenile Steelhead 06/30/2011
G 162 Analyze raw data collected from screw traps and surveys to develop population estimates (year 1) 04/01/2010
H 185 Periodic Status Reports for BPA 04/01/2010
I 119 Manage RM&E Activities on Toppenish Creek 04/01/2010
J 132 No report due in year one 04/01/2010
K 165 Environmental Compliance Year 1 04/01/2010
L 158 PIT tag junenile steelhead 07/06/2011
M 132 Submit Progress Report for the period July 2010 to June 2011 07/01/2010
N 165 Environmental Compliance Year 2 07/01/2010
O 162 Analyze raw data collected from screw traps and surveys to develop population estimates (Year 2) 07/01/2010
P 162 Analyze PIT tag detections at downstream detection facilities to estimate survival 07/01/2010