Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 51487: 2003-017-00 EXP ISEMP -USFWS ENTIAT R FISHERIES EFFECTIVENESS M&E
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
51487
Contract Title:
2003-017-00 EXP ISEMP -USFWS ENTIAT R FISHERIES EFFECTIVENESS M&E
Contract Continuation:
Previous: Next:
45993: 2003-017-00 EXP ISEMP - USFWS ENTIAT R FISHERIES EFFECTNESS M & E
  • 56336: 2003-017-00 EXP ISEMP -USFWS ENTIAT R FISHERIES EFFECTIVENESS M&E
Contract Status:
Closed
Contract Description:
AMENDMENT 7/2011:  This contract is being amended to include work central to fish population status and trend monitoring under the ISEMP.  This amendment allows the U.S. Fish and Wildlife Service to collaborate with ISEMP and other participating agencies (Washington Department of Fish and Wildlife and the Yakama Nation) to conduct fish tagging surveys at status and trend sites in the Wenatchee and Entiat subbasins (described under WEs L157 and M158).  The contract is also being amended to add funding to allow USFWS to conduct monitoring in off-channel habitat in the Entiat IMW, described under WEs J157 and K158.  This amendment will add $52,294 to the contract total.

Project #2003-017-00 (Project) seeks to develop two novel monitoring and evaluation programs: (i) subbasin-scale pilot status and trend monitoring efforts for anadromous salmonids and their habitat in the Wenatchee/Entiat, John Day and South Fork Salmon River subbasins, and (ii) effectiveness monitoring for suites of habitat restoration projects in selected watersheds within the three target subbasins.  This work – critical for implementing the 2000 NMFS FCRPS Biological Opinion (RPA Actions 180, 181, and 183) (BiOp) – builds on current status and trend monitoring programs within each of these subbasins.  Several regional and local organizations are funding and implementing these programs.  In short, this project will integrate existing and new monitoring and evaluation activities in three pilot subbasins to help ensure that provisions of the BiOp are satisfied.

This contract is one of several contracts that will implement this project.  The final report for this contract will contain data that will 1) be submitted to NOAA FISHERIES (also a contractor under this project) for use in a project level integrated Annual Report and 2) be submitted to BPA as a contract final report according to the terms of this contract.  

This Scope of Work (SOW) will enable the Bonneville Power Administration (Bonneville) to implement the Project in the Entiat River Subbasin under an Intensively Monitored Watershed (IMW) framework with the objectives of (1) determining the effectiveness of restoration efforts in the Entiat River, (2) estimating spring Chinook salmon and steelhead smolt production, and (3) estimating life history parameters of spring Chinook and steelhead.  Specifically, within this SOW, the USFWS will achieve these objectives by 1) estimating the population, growth and survival of fish within the Entiat River Subbasin by conducting mark-recapture events at locations distributed along the river  2) estimating the smolt production of spring Chinook salmon and steelhead for the Entiat River Subbasin in 2010, and 3) estimating life history parameters of spring Chinook and steelhead by capturing and PIT tagging juvenile spring Chinook and steelhead.    

Technical methodologies for snorkel surveys and smolt trap conducted under this SOW will follow protocols specified in the following document unless Upper Columbia Regional Technical Team and USFWS mutually agree to changes to these methodologies:

Hillman, T.W.  2006.  Monitoring strategy for the Upper Columbia Basin: Draft report August 2006.  Prepared for Upper Columbia Regional Technical Team, Wenatchee, Washington.
Account Type(s):
Expense
Contract Start Date:
02/01/2011
Contract End Date:
01/31/2012
Current Contract Value:
$558,246
Expenditures:
$558,246

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Beasley Quantitative Consultants Inc No Interested Party chris@qcinc.org (360) 620-2883
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Jim Craig US Fish and Wildlife Service (USFWS) Yes Supervisor jim_l_craig@fws.gov (509) 548-2999
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Chris Jordan National Oceanic and Atmospheric Administration Yes Technical Contact chris.jordan@noaa.gov (541) 754-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Pamela Nelle Terraqua, Inc. Yes Administrative Contact pamela@terraqua.biz (509) 885-8143
R.D. Nelle US Fish and Wildlife Service (USFWS) Yes Contract Manager rd_nelle@fws.gov (509) 548-7573
Steve Rentmeester Environmental Data Services Yes Interested Party environmentaldataservices@gmail.com (503) 247-8431
Carol (VC) Volk Volk Consulting No Interested Party volkconsulting@gmail.com (206) 240-0301
Michael Ward Terraqua, Inc. Yes Technical Contact mike@terraqua.biz (509) 486-2426


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Sign-off from BPA's Environmental Compliance Group that EC requirements are met A: 165. EC for FY11 and pre-work for FY12 contract 05/07/2011 05/07/2011
Steelhead redd counts in Entiat River B: 157. Steelhead redd surveys in Entiat River 12/31/2011 12/31/2011
Submission of smolt trap data C: 157. Operate smolt traps 12/31/2011 12/30/2011
Data from instream PIT tag detection arrays loaded to PTAGIS D: 157. Operate and maintain PIT tag detection arrays on Entiat and Mad Rivers 01/30/2012 12/31/2011
Fish population, growth, CPUE data E: 157. Conduct a mark-recapture study on the Entiat River as part of IMW 12/31/2011 12/30/2011
PIT tagged fish F: 158. Mark/Tag juvenile salmonids using PIT tags as part of the Entiat IMW 12/31/2011 12/30/2011
Final FY11 Contract Annual Report submitted to BPA G: 132. Annual report covering the period 2/1/2010 to 01/31/2011 01/31/2012 01/31/2012
All BPA Contract Documents I: 119. Overall Project Management 01/30/2012 01/31/2012
Fish monitoring data in mainstem off-channel habitat in the Entiat River subbasin J: 157. Conduct mainstem off-channel effectiveness monitoring as part of Entiat IMW 01/31/2012 12/30/2011
PIT tagged fish K: 158. PIT tagging juvenile salminds in off-channel habitat under the Entiat IMW 12/31/2011 12/30/2011
Assist with fish monitoring at 50 status and trend sites L: 157. Conduct fish monitoring at 50 status and trend sites in the Wenatchee and Entiat 09/30/2011 09/20/2011
PIT tagged fish M: 158. PIT tagging juvenile salmon and steelhead for status and trend monitoring 09/15/2011 09/20/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 EC for FY11 and pre-work for FY12 contract 02/01/2011
B 157 Steelhead redd surveys in Entiat River 02/01/2011
C 157 Operate smolt traps 02/01/2011
D 157 Operate and maintain PIT tag detection arrays on Entiat and Mad Rivers 02/01/2011
E 157 Conduct a mark-recapture study on the Entiat River as part of IMW 02/01/2011
F 158 Mark/Tag juvenile salmonids using PIT tags as part of the Entiat IMW 02/01/2011
G 132 Annual report covering the period 2/1/2010 to 01/31/2011 02/01/2011
H 185 Periodic Status Reports for BPA 02/01/2011
I 119 Overall Project Management 02/01/2011
J 157 Conduct mainstem off-channel effectiveness monitoring as part of Entiat IMW 07/25/2011
K 158 PIT tagging juvenile salminds in off-channel habitat under the Entiat IMW 07/25/2011
L 157 Conduct fish monitoring at 50 status and trend sites in the Wenatchee and Entiat 07/25/2011
M 158 PIT tagging juvenile salmon and steelhead for status and trend monitoring 07/25/2011