SOW Report
Contract 52075: 1992-026-01 EXP BIOP CATHERINE CREEK DAVIS DAMS FISH PASSAGE
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
52075
Contract Title:
1992-026-01 EXP BIOP CATHERINE CREEK DAVIS DAMS FISH PASSAGE
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Catherine Creek provides habitat for ESA-listed Snake River spring Chinook, summer steelhead and Columbia River bull trout.  The Catherine Creek Chinook population is considered one of the highest priority populations for restoration within the Grande Ronde Basin.

Catherine Creek has been diverted at the Davis Dams since 1870 with the earliest water right.  A variety of diversion structures have been in place in the past at both the Upper and Lower Davis Dams including gravel pushup dams. The project proposes to upgrade the two existing concrete diversions structures and install vertical slot fish ladders at each site.  Construction is proposed for the 2011.

Project Objectives:

•Provide continuous and unobstructed adult Chinook passage through both dam sites, during the irrigation water withdrawal period, by designing and constructing fish ladders that meet NMFS Passage Criteria.
•Provide juvenile fish passage through both dam sites, during the irrigation water withdrawal period, when there is flow through the fish ladders (near-zero flow will facilitate juvenile passage in vertical-slot ladders).
•Eliminate false attraction flows for adult Chinook at both dam sites by installing radial gates that direct all available flow through fish ladders and bypass channels.
•Improve all salmonid and native fish passage over concrete aprons outside of the irrigation withdrawal period.
•Facilitate juvenile fish passage back to the stream from the ditch inlets by upgrading  culvert entrances.
•Promote continuous adult and juvenile passage, as much as practical, by designing and constructing facilities that require minimal operational adjustments and monitoring (vertical-slot fish ladders and remote/continuous flow monitoring).
•Reduce scour and excessive erosion that is occurring below each diversion.

Proposed Actions at the Upper and Lower Dam sites Include:

*Work area isolation and fish salvage
*Demolition of portions of the existing structures
*Construction of radial gate support and flow by-pass structures
*Streambed modification and cross vane construction
*Irrigation ditch culvert and headgate improvements
*Installation of the radial gates
*Site restoration/seeding/planting

Construction is proposed for 2011, June 1 - December 31. In-water work will be done July 15 to September 30.
Account Type(s):
Expense
Contract Start Date:
04/01/2011
Contract End Date:
12/31/2012
Current Contract Value:
$1,808,338
Expenditures:
$1,808,338

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mason Bailie Grande Ronde Model Watershed Foundation No Interested Party mason@grmw.org (541) 663-0570
Amanda Coffman Grande Ronde Model Watershed Foundation No Interested Party amanda@grmw.org (541) 663-0570
Mary Estes Grande Ronde Model Watershed Foundation No Administrative Contact mary@grmw.org (541) 663-0570
Daniel Gambetta Bonneville Power Administration Yes Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Lyle Kuchenbecker Grande Ronde Model Watershed Foundation Yes Contract Manager lyle@grmw.org (541) 663-0570
Jeff Oveson Grande Ronde Model Watershed Foundation No Supervisor jeff@grmw.org (541) 663-0570
Jesse Steele Grande Ronde Model Watershed Foundation Yes Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Sean Welch Bonneville Power Administration Yes F&W Approver spwelch@bpa.gov (503) 230-7691


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Project permits and environmental compliance documents A: 165. Environmental compliance for Upper and Lower Davis Dams 04/29/2011 12/31/2010
Upper Davis Dam diversion facilities reconstructed B: 84. Upper Davis - Rebuild/replace diversion structure and associated diversion components 12/16/2011 12/16/2011
Upper Davis Dam vertical-slot fish ladder constructed C: 184. Upper Davis - Construct vertical slot fish ladder 03/15/2012 12/31/2011
Lower Davis Dam diversion facilities reconstructed D: 84. Lower Davis - Rebuild/replace diversion structure and associated diversion components 12/16/2011 12/16/2011
Lower Davis Dam vertical-slot fish ladder constructed E: 184. Lower Davis - Construct vertical slot fish ladder 03/15/2012 12/31/2011
Revegetated project site F: 47. Upper Davis - revegetate/seed disturbed ground 11/30/2011 12/30/2011
Revegetated project site G: 47. Lower Davis - revegetate/seed disturbed ground 11/30/2011 12/30/2011
Project management and administration H: 119. Project management & Administration Upper and Lower Davis Dams 12/31/2012 12/31/2012
Attach Completion Report in Pisces I: 132. Project Completion Report - April 2010 - February 2012 11/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 184 Install Fish Passage Structure
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 184 Install Fish Passage Structure
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 84 Remove/Install Diversion
  • 2 instances of WE 184 Install Fish Passage Structure
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 84 Remove/Install Diversion
  • 2 instances of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance for Upper and Lower Davis Dams 10/01/2010
B 84 Upper Davis - Rebuild/replace diversion structure and associated diversion components 01/14/2011
C 184 Upper Davis - Construct vertical slot fish ladder 01/19/2011
D 84 Lower Davis - Rebuild/replace diversion structure and associated diversion components 01/14/2011
E 184 Lower Davis - Construct vertical slot fish ladder 01/14/2011
F 47 Upper Davis - revegetate/seed disturbed ground 01/14/2011
G 47 Lower Davis - revegetate/seed disturbed ground 01/14/2011
H 119 Project management & Administration Upper and Lower Davis Dams 10/01/2010
I 132 Project Completion Report - April 2010 - February 2012 03/01/2011
J 185 Quarterly PISCES Status Reports 10/01/2010