Province | Subbasin | % |
---|---|---|
Columbia River Estuary | Elochoman | 100.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Manage and Administer the Abernathy Restoration Project | A: 119. WDFW will Manage & Administer the Abernathy Restoration | 08/31/2012 | 08/31/2012 | |
Review of Available Data and Assessment of Restoration Alternative | B: 122. WDFW will Review Feasibility Study Data and Documents from the Corps and HDR | 10/31/2011 | 10/31/2011 | |
Collect Site-specific Data Needed to Complete Restoration Design | C: 157. Conduct Site Visits and Field Surveys | 11/30/2011 | 11/30/2011 | |
Restoration Alternative 30% Design | D: 175. WDFW will Develop 30% Restoration Design | 03/16/2012 | 03/16/2012 | |
Complete Environmental Review and Permitting | E: 165. WDFW will work with BPA to Complete Environmental Review | 07/01/2012 | 08/31/2012 | |
Final Design of Abernathy Restoration Project | F: 175. WDFW will Develop 100% Restoration Design | 05/01/2012 | 05/01/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | WDFW will Manage & Administer the Abernathy Restoration | 09/01/2011 | ||||||
B | 122 | WDFW will Review Feasibility Study Data and Documents from the Corps and HDR | 09/01/2011 | ||||||
C | 157 | Conduct Site Visits and Field Surveys | 09/01/2011 | ||||||
D | 175 | WDFW will Develop 30% Restoration Design | 09/01/2011 | ||||||
E | 165 | WDFW will work with BPA to Complete Environmental Review | 09/01/2011 | ||||||
F | 175 | WDFW will Develop 100% Restoration Design | 09/01/2011 | ||||||
G | 132 | Submit Progress Report for the period (Sep 2011) to (Aug 2012) | 09/01/2011 | ||||||
H | 185 | Periodic Status Reports for BPA | 09/01/2011 |