Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Funding Package - Submit draft to COTR | A: 119. Routine contract administration | 07/30/2012 | 08/03/2012 | |
There is no environmental compliance associated with this contract. | B: 165. Completion of EC documentation to BPA | 08/31/2012 | 08/31/2012 | |
Develop two (2) project proposal for BPA funding | C: 114. Identify and Select Projects | 08/31/2012 | 08/31/2012 | |
Engineering Designs for Habitat Conservation Projects | D: 175. Produce engineering designs for Lemhi habitat conservation actions | 08/31/2012 | 07/06/2012 | |
Monitor Grazing exclosures and produce reports for Upper Carmen Creek Monitoring and Grazing Project | E: 174. Riparian Grazing Study & Monitoring | 08/31/2012 | 08/31/2012 | |
Upper Salmon River Basin Planning Tool, Phase III | F: 160. Sub Basin Wide Planning Tool, Phase III | 08/31/2012 | 08/31/2012 | |
Measure Well Levels | G: 115. Well Level Measurements-Sager | 08/31/2012 | 08/31/2012 | |
Attach Progress Report in Pisces | H: 132. Submit Progress Report for the period (Sept 2011) to (Aug 2012) | 07/31/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Routine contract administration | 09/01/2011 | ||||||
B | 165 | Completion of EC documentation to BPA | 09/01/2011 | ||||||
C | 114 | Identify and Select Projects | 09/01/2011 | ||||||
D | 175 | Produce engineering designs for Lemhi habitat conservation actions | 09/01/2011 | ||||||
E | 174 | Riparian Grazing Study & Monitoring | 09/01/2011 | ||||||
F | 160 | Sub Basin Wide Planning Tool, Phase III | 09/01/2011 | ||||||
G | 115 | Well Level Measurements-Sager | 09/01/2011 | ||||||
H | 132 | Submit Progress Report for the period (Sept 2011) to (Aug 2012) | 09/01/2011 | ||||||
I | 185 | Periodic Status Reports for BPA | 09/01/2011 |