Contract 55113: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION O&M
Project Number:
Title:
Grande Ronde Supplementation Operations and Maintenance (O&M) and Monitoring and Evaluation (M&E) on Lostine River
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
55113
Contract Title:
1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION O&M
Contract Continuation:
Previous: Next:
50364: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION O&M
  • 60108: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION O&M
Contract Status:
Closed
Contract Description:
This contract provides the funding for the Nez Perce Tribe (NPT) to implement a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. This supplementation activity is part of a greater project, the Grande Ronde Endemic Spring Chinook Salmon Supplementation project (GRESP), which also involves supplementation of the Upper Grande Ronde River and Catherine Creek and Lookingglass Creek.  The GRESP was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. Starting in 2011 there has been added the task of trapping/monitoring Lostine River summer steelhead.

With funding through this contract the Nez Perce Tribe operate a weir/trap for monitoring summer steelhead and for spring Chinook adult collection and monitoring on the Lostine River. The purposes of trapping Chinook are to collect broodstock for supplementation, provide adult return information for monitoring and evaluation of the program, and to manage escapement of natural spawners in the Lostine River.  This contract will provide for the 15th year of operation of the adult trap/collection facility.  Staff operate the weir (depending on water flows) from January through October.  The adult trapping facility is staffed appropriately to provide operations and maintenance of the facility, provide security and to care for fish captured in trap.  All fish trapped are sampled and removed frequently to prevent damage to the fish and limit disruption of fish migrations. These fish are managed for natural spawning and in the case of the Chinook for contribution to the hatchery broodstock.  Chinook are allocated to one of four disposition options:  1) release above the weir to spawn naturally, 2) retain for broodstock and transfer to Lookingglass Hatchery for holding and spawning, 3) out-plant to adjacent Wallowa River underutilized habitat, or 4) distributed to the tribe or local food banks.  The determination of which Chinook are selected for broodstock, released in the Lostine River or out-planted is made using a “sliding scale” management tool developed by the co-managers (BIA 1998) and permitted by ESA Section 10 permit 1149.  Adult Chinook released to spawn naturally are either released above the weir or, during the later summer months, transported by truck around a "dewatered" zone in the Lostine River and released upstream.  The low flows are a result of a naturally declining hydrograph exacerbated by withdrawal of water for irrigation from 14 different irrigation ditches.  

Chinook broodstock that are collected at the Lostine weir provide the egg source for the conventional production of spring Chinook smolts for the Lostine supplementation effort (the captive broodstock potion of the program will had its' last smolt release in 2011).  Chinook broodstock are transported to Lookingglass Hatchery for holding and spawning.  Lookingglass Hatchery is operated by Oregon Department of Fish and Wildlife.  NPT staff assist with the spawning of adults and whatever other fish culture activities are necessary at Lookingglass Hatchery.  Egg incubation, early rearing, marking and final rearing occur at Lookingglass Hatchery. After approximately 18 months of rearing, smolts are transported back to the Lostine River to the Lostine Acclimation Facility.  

Operation of the Lostine Acclimation facility is also funded through this contract.  This contract will provide for the 14th year of operation of the juvenile acclimation facility.  Staff operate the acclimation facility from late-February to mid-April, twenty-four hours a day, seven days a week.  Staff responsibilities include feeding fish, picking mortalities and recording data, responding to alarms, and ensuring the pumps and generators continue to provide a continuous water supply to the acclimation tanks.  Typically during this time two groups of fish are acclimated totaling approximately 250,000 smolts.

In addition to the activities described above, staff provide security and maintenance for both facilities all year long, which involves cutting, pulling and spraying weeds, watering trees and shrubs planted for screening purposes, upkeep on tractors, trucks, fish transport tanks, etc. There is a newly constructed weir and trap in place and there are additional operations and maintenance activities that are required as the facility has failed and is now undergoing redesign/repair. There is also a fair amount of public relations work that occurs as both facilities are located on privately owned land that is leased by BPA for the purpose of operating these facilities.
Account Type(s):
Expense
Contract Start Date:
01/01/2012
Contract End Date:
12/31/2012
Current Contract Value:
$353,129
Expenditures:
$353,129

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mickey Carter Bonneville Power Administration Yes Env. Compliance Lead macarter@bpa.gov (503) 230-5885
James Harbeck Nez Perce Tribe No Interested Party jimh@nezperce.org (541) 432-2501
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Jay Hesse Nez Perce Tribe No Interested Party jayh@nezperce.org (208) 621-3552
Rebecca Johnson Nez Perce Tribe Yes Supervisor beckyj@nezperce.org (208) 621-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Bruce McLeod Nez Perce Tribe No Interested Party brucem@nezperce.org (208) 843-7320x4628
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Tish Whitman Nez Perce Tribe Yes Administrative Contact tishw@nezperce.org (208) 843-7320
Greg (Nez Perce) Wolfe Nez Perce Tribe Yes Supervisor gregw@nezperce.org (509) 546-2071
Rick Zollman Nez Perce Tribe Yes Contract Manager rickz@nezperce.org (541) 432-2505


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA Permits A: 165. Assist BPA NEPA Group in Obtaining Permits 12/31/2012 12/31/2012
Acclimate spring/summer chinook smolts B: 176. Acclimate BY2010 juvenile Lostine River spring/summer Chinook at Lostine River 04/30/2012 04/30/2012
Spawn BY2012 Lostine River Chinook adults at Lookingglass Hatchery C: 176. Spawn BY2011 Lostine River Chinook adults at Lookingglass Hatchery 09/30/2012 09/13/2012
Installation of Lostine River weir for trapping adult summer steelhead. D: 70. Install Lostine River Weir For Adult Steelhead Trapping 11/30/2012 11/30/2012
Trap and sample Lostine River adult summer steelhead E: 66. Trap Summer Steelhead in Lostine River 11/30/2012 11/30/2012
Modification of Lostine R. Weir F: 70. Modify Lostine River Adult Weir for broodstock collection and monitoring 10/31/2012 10/31/2012
Collection of Lostine R. broodstock spring chinook G: 66. Collect Spring/Summer Chinook at Lostine River Adult Facility 10/31/2012 10/31/2012
Data Collection of Lostine R. spring chinook H: 157. Collect Spring/Summer Chinook data at Lostine River Adult Facility 10/01/2012 10/01/2012
Lostine River O&M Project Coordination I: 191. Lostine River O&M Coordination 12/31/2012 12/31/2012
Lostine River tours J: 99. Educational Tours of Lostine River Facilities 12/31/2012 12/31/2012
Develop Annual Operation Plan (2012) For Northeast Oregon Region K: 174. Develop Annual Operation Plan For Northeast Oregon Region 02/29/2012 03/30/2012
Attach 2010 Progress Report in Pisces L: 132. Submit Progress Report for the period 1/1/2010 to 12/31/2010 03/31/2012 12/31/2012
Attach 2011 Progress Report in Pisces M: 132. Submit Progress Report for the period 1/1/2011 to 12/31/2011 12/31/2012 12/31/2012
Manage Project N: 119. Manage and Administer the Project Contract 12/31/2012 12/31/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 70 Install Fish Monitoring Equipment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Assist BPA NEPA Group in Obtaining Permits 01/01/2012
B 176 Acclimate BY2010 juvenile Lostine River spring/summer Chinook at Lostine River 08/19/2011
C 176 Spawn BY2011 Lostine River Chinook adults at Lookingglass Hatchery 08/19/2011
D 70 Install Lostine River Weir For Adult Steelhead Trapping 08/19/2011
E 66 Trap Summer Steelhead in Lostine River 08/19/2011
F 70 Modify Lostine River Adult Weir for broodstock collection and monitoring 01/07/2012
G 66 Collect Spring/Summer Chinook at Lostine River Adult Facility 08/19/2011
H 157 Collect Spring/Summer Chinook data at Lostine River Adult Facility 08/19/2011
I 191 Lostine River O&M Coordination 01/01/2012
J 99 Educational Tours of Lostine River Facilities 01/01/2012
K 174 Develop Annual Operation Plan For Northeast Oregon Region 01/01/2012
L 132 Submit Progress Report for the period 1/1/2010 to 12/31/2010 01/01/2012
M 132 Submit Progress Report for the period 1/1/2011 to 12/31/2011 01/01/2012
N 119 Manage and Administer the Project Contract 01/01/2012
O 185 Periodic Status Reports for BPA 01/01/2012