Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Prepare Necessary Environmental Compliance documentation for relevant projects | B: 165. Produce Environmental Compliance Documents for projects | 12/31/2012 | 12/26/2012 | |
Designs and Specifications from NRCS on BPA projects | C: 175. NRCS Technical staff and Challis position | 12/31/2012 | 12/26/2012 | |
Identify and Select Individual Projects | D: 114. Identify and develop habitat projects | 12/31/2012 | 12/28/2012 | |
Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. | E: 99. Provide Outreach and Education for Habitat Projects | 12/28/2012 | 12/28/2012 | |
Install approximately 5100 feet of riparian fence protection approximately 3000 feet East Fork | F: 40. Install Riparian Fence on the East Fork of the Salmon River | 11/30/2012 | 11/30/2012 | |
Approximately 6000 feet of pipeline | G: 149. Install Lyon Creek Pipeline | 11/30/2012 | ||
Install 2 stock-water locations to provide alternatives to water gaps on 2 miles of the Salmon River | H: 34. Stock water devices at Broken Wing | 11/11/2012 | 12/21/2012 | |
Install Sprinkler System to allow for the removal of two points of diversion, EF-1 & Wickiup-1 | I: 150. Install Sprinkler to allow removal of two Points of Diversion 1=East Fork 1=Wickiup | 10/26/2012 | 10/26/2012 | |
Attach Progress Report in Pisces | J: 132. Submit Progress Report for the period January 2012 through March 2012 | 03/30/2012 | 01/30/2012 | |
Funding Package - Submit draft to COTR | K: 119. Routine contract actions | 10/30/2012 | 12/07/2012 | |
Install two linked paver in two ford crossing in Lyon Creek | L: 55. Install two linked paver in two ford crossing in Lyon Creek | 11/30/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 09/01/2011 | ||||||
B | 165 | Produce Environmental Compliance Documents for projects | 09/01/2011 | ||||||
C | 175 | NRCS Technical staff and Challis position | 09/01/2011 | ||||||
D | 114 | Identify and develop habitat projects | 09/01/2011 | ||||||
E | 99 | Provide Outreach and Education for Habitat Projects | 09/01/2011 | ||||||
F | 40 | Install Riparian Fence on the East Fork of the Salmon River | 11/07/2011 | ||||||
G | 149 | Install Lyon Creek Pipeline | 09/24/2012 | ||||||
H | 34 | Stock water devices at Broken Wing | 09/24/2012 | ||||||
I | 150 | Install Sprinkler to allow removal of two Points of Diversion 1=East Fork 1=Wickiup | 11/07/2011 | ||||||
J | 132 | Submit Progress Report for the period January 2012 through March 2012 | 09/01/2011 | ||||||
K | 119 | Routine contract actions | 09/01/2011 | ||||||
L | 55 | Install two linked paver in two ford crossing in Lyon Creek | 01/01/2012 |