Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56065 REL 1: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
56065 REL 1
Contract Title:
2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
26934 REL 34: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
  • 56065 REL 6: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Status:
Closed
Contract Description:
The goal of this project is to provide temporary upstream passage for bull trout at Albeni Falls Dam, Pend Oreille River.  We propose to collect bull trout below the dam using boat electrofishing. The fish will then be transported above Albeni Falls Dam and released near Priest River, Idaho, or re-released below the dam depending on water temperature and number of fish captured.  Prior to release each fish will be implanted with a combination radio-acoustic transmitter to track the fish to potential spawning tributaries of Pend Oreille Lake. A system of stationary radio receiving stations and airplane/truck/boat surveys will be used to monitor the movement of the tagged fish. This project provides direct on-the-ground benefits for endangered bull trout in the Pend Oreille Basin because it will allow fish, whose migration corridor has been blocked by a dam without fish passage, to return to their natal streams and contribute their genes (which would otherwise have been lost) to the spawning population.
Account Type(s):
Expense
Contract Start Date:
04/05/2012
Contract End Date:
04/04/2013
Current Contract Value:
$63,347
Expenditures:
$63,347

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 04/04/2013 03/28/2013
Functioning radio monitoring stations B: 157. Maintain and download radio receiving stations 04/04/2013 03/28/2013
Develop a profile of each fish tracked C: 162. Data reduction and analysis 01/31/2013 01/31/2013
Final report uploaded to the BPA website D: 132. Submit Annual Report for the period 16 November 2011 to 15 November 2012 04/04/2013 04/04/2013
Complete all project management activities for FY12/13 E: 119. Manage Project 04/04/2013 03/28/2013
Testing and calibration of all monitoring stations F: 70. Test all stations prior to FY13/14 monitoring season, if applicable 04/04/2013 03/28/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 04/05/2012
B 157 Maintain and download radio receiving stations 04/05/2012
C 162 Data reduction and analysis 04/05/2012
D 132 Submit Annual Report for the period 16 November 2011 to 15 November 2012 04/05/2012
E 119 Manage Project 04/05/2012
F 70 Test all stations prior to FY13/14 monitoring season, if applicable 04/05/2012
G 185 Periodic Status Reports for BPA 04/05/2012