Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 26934 REL 34: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
26934 REL 34
Contract Title:
2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
26934 REL 29: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
  • 56065 REL 1: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Status:
Closed
Contract Description:
The goal of this project is to provide temporary upstream passage for bull trout at Albeni Falls Dam, Pend Oreille River. We propose to collect bull trout below the dam using boat electrofishing. The fish will then be transported above Albeni Falls Dam and released near Priest River, Idaho, or re-released below the dam depending on water temperature and number of fish captured.  Prior to release each fish will be implanted with a combination radio-acoustic transmitter to track the fish to potential spawning tributaries of Pend Oreille Lake. A system of stationary radio receiving stations and airplane/truck/boat surveys will be used to monitor the movement of the tagged fish. This project provides direct on-the-ground benefits for endangered bull trout in the Pend Oreille Basin because it will allow fish, whose migration corridor has been blocked by a dam without fish passage, to return to their natal streams and contribute their genes (which would otherwise have been lost) to the spawning population.
Account Type(s):
Expense
Contract Start Date:
04/05/2011
Contract End Date:
04/04/2012
Current Contract Value:
$128,746
Expenditures:
$128,746

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 04/04/2012 03/15/2012
Bull trout tagged and transported upstream of Albeni Falls Dam B: 157. Electrofish, tag, and transport bull trout 10/30/2011 07/01/2011
3 boat-tracking surveys of Lake Pend Oreille C: 157. Lake mobile tracking surveys 11/30/2011 11/30/2011
Functioning radio monitoring stations D: 157. Maintain and download radio receiving stations 04/04/2012 03/30/2012
Bull trout tagged and transported using professional E: 157. Professional hook/line fish, tag, transport fish 06/24/2011 09/30/2011
Complete all project management activities for FY11/12 F: 119. Manage Project 04/04/2012 03/30/2012
Develop a profile of each fish tracked G: 162. Data reduction and analysis 12/31/2011 12/31/2011
Final report uploaded to the BPA website H: 132. Submit Annual Report for the period April 2011 to November 2011 04/04/2012 03/30/2012
Manuscript submitted to peer-reviewed journal I: 183. Submit journal article 06/30/2011
Testing and calibration of all monitoring stations J: 70. Test all stations prior to FY12/13 monitoring season, if applicable 04/04/2012 03/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 04/05/2011
B 157 Electrofish, tag, and transport bull trout 04/05/2011
C 157 Lake mobile tracking surveys 04/05/2011
D 157 Maintain and download radio receiving stations 04/05/2011
E 157 Professional hook/line fish, tag, transport fish 04/05/2011
F 119 Manage Project 04/05/2011
G 162 Data reduction and analysis 04/05/2011
H 132 Submit Annual Report for the period April 2011 to November 2011 04/05/2011
I 183 Submit journal article 04/05/2011
J 70 Test all stations prior to FY12/13 monitoring season, if applicable 04/05/2011
K 185 Periodic Status Reports for BPA 04/05/2011