Contract 56304: 1996-040-00 EXP COHO MID-COL. SITE/FACILITY DEVELOPMENT
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
56304
Contract Title:
1996-040-00 EXP COHO MID-COL. SITE/FACILITY DEVELOPMENT
Contract Continuation:
Previous: Next:
n/a
  • 56662 REL 42: 1996-040-00 EXP COHO RESTORATION MID-COLUMBIA - SITE DVLPMNT
Contract Status:
Closed
Contract Description:
The long term vision of this restoration project is to restore coho salmon to the Wenatchee and Methow river basins at biologically sustainable levels that will support harvest in most years. The project works toward development of locally adapted, naturally spawning coho populations in the Wenatchee and Methow subbasins by increasing the fitness of reintroduced coho salmon by reducing domestication and emphasizing local adaptation. The program will use strict broodstock collection protocols, which ultimately will place a limit on the proportion of natural origin adults in the hatchery program and place a limit on the proportion of hatchery origin adults on the spawning ground. This contract will allow for progressive movement through the 3-STEP process, of which, the program is currently involved in STEP 2 and moving towards a Record of Decision (ROD) tentatively scheduled for late spring/early summer 2012.  This decision of whether or not the coho project will continue towards full plan implementation, as outlined within the Coho Master Plan for Long-Term Restoration, will be guided by the comprehensive and detailed programmatic analyses of the Environmental Impact Statement (EIS) that has been submitted for review.  Our Project is in the phase of fine-tuning site specific details and the processes that are required to implement multiple new sites within this project.  A tentative schedule of 2013 for partial or full program implementation the Methow and/or Wenatchee basins is what the Yakama Nation is aiming towards.  Step 3 is designed to allow for refinements to specific sites and prepare for final reviews through the ISRP and funding agencies while coming to final design where construction is needed.    

This SOW includes includes work elements for tasks that will be completed prior to January 31st, 2014.  This 24-month contract is being put in place through Accord funding that will include fall activities for the 2012/2013 CYs and extend through the early winter 2014CY.  This contract includes pre-construction and other expense-side work that precedes and complements the construction work itself, which will be contracted separately with capital funds.  Ongoing fish production O&M and M&E also is in a separate contract.  This contract will predominately include subcontracted work to continue towards the process of refining site details and securing appropriate permits and rights associated with a functioning site(s).

Sites that will require some level of construction are listed below:
Methow: MSWA, Eightmile Ranch, Lincoln, Newby, a new Twisp site still be located, and Gold Creek.  Level of construction varies by site from existing pond modifications to new pond construction with an artificial intake system.
Wenatchee :Dryden, Natapoc, Chumstick (Boyce property), Koslowski, Chikamin, Minnow, Tall Timber, and Rohlfing's,  Level of construction varies by site from existing pond modifications to new pond construction with an artificial intake system to small scale holding and incubation facility.
Account Type(s):
Expense
Contract Start Date:
02/01/2012
Contract End Date:
01/31/2014
Current Contract Value:
$524,739
Expenditures:
$524,739

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Interested Party murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Nancy Weintraub Bonneville Power Administration Yes Interested Party nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package - Submit draft to COTR B: 119. Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow 01/21/2014 01/21/2014
Council check-in for progress through the 3-step process C: 196. Check-in w/Council for updated MP, etc. 11/29/2013 11/29/2013
pre-acquisition activities for multiple lands in the Wenatchee and Methow basins. D: 172. Enter into pre-aquisition activities on multiple lands in both the Wenatchee and Methow basins 01/31/2014 01/31/2014
Finalize EIS and support documenting EAs, SAs, and BAs E: 165. Support completion of FEIS + BAs and any EAs and SAs 01/31/2014 01/31/2014
Design level drawings and permitting for acclimation sites F: 175. # Produce design and specifications to include permitting for Methow sites 01/31/2014
Design level drawings and permitting for acclimation sites G: 175. Produce design and specifications to include permitting for Wenatchee sites 01/31/2014 01/31/2014
Develop and secure agreements for acclimation within conservation easements H: 98. Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow 01/31/2014 01/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 196 Council Step Process
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 98 Other
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2012
B 119 Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow 02/01/2012
C 196 Check-in w/Council for updated MP, etc.
D 172 Enter into pre-aquisition activities on multiple lands in both the Wenatchee and Methow basins 02/01/2012
E 165 Support completion of FEIS + BAs and any EAs and SAs 02/01/2012
F 175 # Produce design and specifications to include permitting for Methow sites 02/01/2012
G 175 Produce design and specifications to include permitting for Wenatchee sites 02/01/2012
H 98 Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow 02/01/2012
I 132 [No Report Required] 02/01/2012