Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 112: 2007-156-00 EXP ROCK CREEK FISH AND HABITAT ASSESSMENT
Project Number:
Title:
Rock Creek Fish and Habitat Assessment
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Columbia Plateau Columbia Lower Middle 100.00%
Contract Number:
56662 REL 112
Contract Title:
2007-156-00 EXP ROCK CREEK FISH AND HABITAT ASSESSMENT
Contract Continuation:
Previous: Next:
56662 REL 86: 2007-156-00 EXP ROCK CREEK FISH AND HABITAT ASSESSMENT
  • 56662 REL 136: 2007-156-00 EXP ROCK CREEK FISH AND HABITAT ASSESSMENT
Contract Status:
Closed
Contract Description:
The Yakama Nation Fisheries Resource Management Program is using a three-pronged approach to restore watershed health and aid recovery of salmonids and culturally significant fish species in Rock Creek, a 223-square-mile subbasin tributary to the Columbia River upstream of John Day Dam.  First, assessment of the current fish use, water quality/quantity, and habitat conditions to determine areas of high steelhead productivity and survival, and the primary limiting habitat factors.  Second, creation of a list of prioritized actions to protect, restore, and enhance stream reaches.  Third, conduct restoration actions to address restoration priorities, and monitor the effectiveness of restoration activities.

The overall goal of this project is to improve habitat conditions of salmonids listed under the Endangered Species Act (ESA) in the Rock Creek subbasin to an extent of supporting sustainable populations.  The Middle Columbia River Steelhead (Oncorhynchus mykiss) Distinct Population Segment (DPS) was identified and listed as threatened on January 5, 2006 (71 FR 834).  NOAA identified Rock Creek as Critical Habitat for the Middle Columbia Steelhead DPS (NOAA 2005).  The Rock Creek subbasin has been identified as a watershed with high steelhead production potential (as evidenced by spawner surveys) but with significant habitat limitations (low flow; high stream temperatures; and riparian, channel and floodplain degradation).  

This project originated as a Research Monitoring and Evaluation (RM&E) project and is still in the transitioning phase towards an on-the-ground habitat project.  The Rock Creek Fish and Habitat and Assessment project was initiated in December 2007 as primarily a RM&E Project with limited habitat restoration objectives.  Since 2007, habitat, water quality, water temperature, adult distribution and abundance, juvenile fish population and abundance, steelhead genetic collection, fish pathogen, and PIT-tag interrogation information has been compiled and used to identify key reaches and habitats (e.g. pool refugia) for future restoration or enhancement.   A Rock Creek Fish and Habitat Assessment for Prioritization of Restoration and Protection Actions report (June 1, 2008 – May 31, 2013) was recently submitted to BPA along with a Fluvial Reconnaissance with Observations on Geomorphology and Suitability for Anadromous Salmonid Habitat Actions Rock Creek, Klickitat County (December 10, 2014).  

Results of the previous fish work, along with recently completed habitat assessments, have pointed to the need for additional fish sampling to determine if presence/abundance of Snake River fish persists most years, and what levels of production are occurring in Rock Creek - recent PIT tag data suggest there are some locally produced (albeit likely still genetically Snake River) steelhead returning.  Recommendations from the geomorphic assessment include applying best management practices (BMP’s) in the subbasin, such as allowing beaver activities to expand without disturbance in the watershed and managing livestock in ways to improve native riparian plant composition, density and abundance.  Other recommendations include increasing habitat complexity (small wood jam or boulder placements) in perennial pools that would in turn increase the carrying capacity of age-0 and age-1 fish.  Prior to improving habitat complexity in perennial pools there needs to be continuous low flow habitat documentation in the subbasin.  

Additional time is needed for monitoring fish PIT-tagged as juveniles to return and be detected as adults to understand the complete life cycle.  A clear understanding of where steelhead utilize Rock Creek (hold, spawn, rear) and an understanding of which life history strategies are successful, is fundamental to implementing meaningful restoration strategies.  During this contract year salmonid spawner surveys, water quality, water temperature, juvenile population and abundance surveys, low-flow habitat mapping, PIT-tagging and interrogation will continue to be monitored in the watershed.  An additional RM&E work element that will be included in this SOW is the ‘Piscivorous fish survey and documentation in the lower Rock Creek inundated pool.’  There is limited to no data available on the existing fish assemblages in the lower Rock Creek inundated pool.  This data will assist in determining benefits of future habitat improvement efforts in the watershed.  Boat electrofishing surveys will be conducted in the Rock Creek inundated pool two times in the summer and fall seasons to document the fish species assemblage and abundance (winter and spring seasons will be excluded when adult coho and steelhead migrate through the inundated pool).  There is now a 5 year NOAA Fisheries Section 10 permit in place to conduct the fish sampling on O. mykiss in the watershed.  

The bridgelip sucker (Catostomus columbianus) was historically abundant throughout the subbasin and is a culturally significant fish species to the Yakama Nation.  In the last decade, it has been observed by the Tribal members that suckers are less abundant for ceremonial and subsistence harvest.  Bridgelip suckers are a culturally significant species of concern.  In previous contract years, we documented the distribution of bridgelip suckers during our juvenile salmonid abundance and population surveys.  During this contract year we would like to take a closer look at their life history during the juvenile population and abundance surveys.

Invasive weed control will be conducted at the Highway 8, Site I, Site II, and Canapu riparian enhancement sites and at the 2015 blackberry removal sites. The primary target weed types include non-native thistles, knap weed, star thistle and blackberry bushes.  Weed removal will involve mechanical, hand, and herbicidal treatments.  Two outcrops of invasive blackberry brush sites in the riparian corridor will be removed and revegetated with native species.  Native trees, shrubs, and grass will be planted in the blackberry removal sites to reduce other non-native species to reestablish at those sites.  

A co-authored manuscript covering the scientific findings of Rock Creek subbasin steelhead genetic evaluation was written and submitted to a peer-reviewed journal (American Fisheries Society) during the previous contract year. AFS is reviewed and accepted the manuscript and is working on the process of getting the manuscript published during this contract (2016 - 2017).  

Efforts have begun to conduct riparian plantings and to assess headwater forested areas and their role in the watershed hydrology of the basin.  Headwater private and commercial land owners will be contacted and meadow restoration opportunities will be pursued in this contract year.
Account Type(s):
Expense
Contract Start Date:
06/01/2016
Contract End Date:
05/31/2017
Current Contract Value:
$351,314
Expenditures:
$351,314

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Elaine Harvey Yakama Confederated Tribes Yes Technical Contact elaine@ykfp.org (509) 773-3147
Tana Hoptowit Yakama Confederated Tribes Yes Interested Party hopt@yakamafish-nsn.gov (509) 865-5121x6318
David Lindley Yakama Confederated Tribes Yes Technical Contact dlindley@ykfp.org (509) 369-3565
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Lisa Renan Bonneville Power Administration Yes Interested Party lnrenan@bpa.gov (503) 230-4332
Ashlee Rudolph Bonneville Power Administration Yes Env. Compliance Lead abrudolph@bpa.gov (503) 230-4475
Bill Sharp Yakama Confederated Tribes Yes Contract Manager Bill_Sharp@yakama.com (509) 865-5121x6355
Joe Zendt Yakama Confederated Tribes Yes Technical Contact jzendt@ykfp.org (509) 369-3184


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Plan and coordinate project funding package and manage daily project activities 05/31/2017 05/31/2017
Environmental Compliance Documentation C: 165. Participate in ESA/NEPA Compliance for Rock Creek M&E & Fisheries Management 05/31/2017 05/31/2017
Lease 200 acres of land for fisheries conservation D: 92. Lease 200 acres of land for fisheries conservation and enhancement 05/31/2017 05/31/2017
Final report of Rock Creek steelhead life histories E: 157. Conduct juvenile steelhead population surveys 05/31/2017 05/31/2017
Final report of Rock Creek steelhead life histories based from fish PIT tag interrogation F: 157. Conduct adult and juvenile steelhead PIT tag monitoring 05/31/2017 05/31/2017
Spawning Surveys: Rock Creek database with results presented in annual report G: 157. Spawning ground surveys (redd counts) and scale collection 05/31/2017 05/31/2017
Compilation of error checked data H: 162. Analyze population monitoring information 05/31/2017 05/31/2017
Rock Creek steelhead genetics and life history journal article I: 183. Produce a co-authored journal article on the life history of Rock Creek watershed steelhead 05/31/2017
Water monitoring: Rock Creek database J: 157. Water quality and temperature 05/31/2017 05/31/2017
Invasive weed removal at 6 locations K: 199. Invasive weed control at riparian tree planting sites 05/31/2017 05/31/2017
Map of perennial habitat types in Rock Creek and tributary streams L: 115. Survey and map perennial habitat types in Rock Creek and tributary streams 05/31/2017 05/31/2017
At least one visit to a youth culture or science camp by Rock Creek staff M: 99. Public outreach and education to local residents and other agencies 05/31/2017 08/10/2016
Completed 2013-2015 Annual Report N: 132. Submit Progress Report for the period (Jun2013) to (Dec2015) 05/31/2017
Completed 2016 Annual Report O: 132. Submit Progress Report for the period (Jan2016) to (Dec2016) 05/31/2017
Inundated lake piscivorous fish surveys: Rock Creek database with results in the 2017 annual r P: 115. Piscivorous fish survey and documention in the lower Rock Creek inundated pool 05/31/2017 05/31/2017
Plant native vegetation at 4 blackberry removal sites Q: 47. Plant vegetation at four blackberry removal locations 05/31/2017 05/31/2017
Native tree/shrub planting at previous contract tree planting sites to replace dead trees R: 198. Replacement of dead trees at Site I, Site II, Canapu, and Highway 8 tree planting sites 04/28/2017 04/28/2017
Fluvial Reconnaissance of Rock Creek and Selected Tributaries with Implications for Anadromous ..... S: 132. Finalization of Fluvial of Rock Creek and Selected Tributaries Report 11/04/2016 11/04/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 92 Lease Land
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 92 Lease Land
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 183 Produce Journal Article
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 06/01/2016
B 119 Plan and coordinate project funding package and manage daily project activities 06/01/2016
C 165 Participate in ESA/NEPA Compliance for Rock Creek M&E & Fisheries Management 06/01/2016
D 92 Lease 200 acres of land for fisheries conservation and enhancement 06/01/2016
E 157 Conduct juvenile steelhead population surveys 06/01/2016
F 157 Conduct adult and juvenile steelhead PIT tag monitoring 06/01/2016
G 157 Spawning ground surveys (redd counts) and scale collection 06/01/2016
H 162 Analyze population monitoring information 06/01/2016
I 183 Produce a co-authored journal article on the life history of Rock Creek watershed steelhead 06/01/2016
J 157 Water quality and temperature 06/01/2016
K 199 Invasive weed control at riparian tree planting sites 06/01/2016
L 115 Survey and map perennial habitat types in Rock Creek and tributary streams 06/01/2016
M 99 Public outreach and education to local residents and other agencies 06/01/2016
N 132 Submit Progress Report for the period (Jun2013) to (Dec2015) 06/01/2016
O 132 Submit Progress Report for the period (Jan2016) to (Dec2016) 06/01/2016
P 115 Piscivorous fish survey and documention in the lower Rock Creek inundated pool 06/01/2016
Q 47 Plant vegetation at four blackberry removal locations 06/01/2016
R 198 Replacement of dead trees at Site I, Site II, Canapu, and Highway 8 tree planting sites 06/01/2016