Contract 56662 REL 275: 1997-051-00 EXP YAKIMA BASIN HABITAT FY23
Project Number:
Title:
Yakima Basin Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
56662 REL 275
Contract Title:
1997-051-00 EXP YAKIMA BASIN HABITAT FY23
Contract Continuation:
Previous: Next:
56662 REL 252: 1997-051-00 EXP YAKIMA BASIN SIDE CHANNELS
  • 94116: 1997-051-00 EXP FY24 YAKIMA BASIN HABITAT
Contract Status:
Issued
Contract Description:
The Yakima Basin Habitat project works to restore, enhance, and protect watershed function within the Yakima subbasin off reservation. Project work emphasizes restoration and protection in priority watersheds and reaches that support native salmonid stocks, particularly steelhead (Oncorhyncus mykiss; listed as "Threatened" within the Mid-Columbia ESU), spring Chinook (O. tshawytscha) salmon, and bull trout (Salvelinus confluentus; ESA "Threatened"). Watershed and habitat improvements also benefit fall Chinook (O. tshawytscha) summer Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout (O. mykiss), and cutthroat trout (O. clarki) and enhance habitat for many terrestrial and amphibian wildlife species. The Yakima Basin Side Channels restoration project is prioritized to address Naches and Upper Yakima tributary limiting factors of reduced stream complexity and channel structure, elevated summer water temperature, reduced floodplain connectivity and function, insufficient large wood in channels and degraded riparian condition in to restore sustainable and harvestable populations of salmon, steelhead and other at-risk species that were historically present in the Yakima subbasin. Additionally, the project will promote climate resiliency and cold water fish recovery. Since 75% of the off-reservation project area is in public ownership, maximum effectiveness is accomplished via cooperation with state, federal and NGO entities. The Yakima Basin Habitat project addresses goals and objectives presented in the Yakima Basin Integrated Plan, Yakima Subbasin Plan, Yakima River Basin Integrated Water Resource Management Plan, Yakima Steelhead Recovery Plan and the Yakima Bull Trout Action Plan.  

The Habitat Team will accomplish the following under CR-360679:

Design
-Yakima River Edge Habitat Phase III RM 184
-SF Tanuem Creek Floodplain Restoration RM 0.0-3.2
-Ahtanum Village RM 5.4 Restoration
-SF Cowiche RM 9.5 and Reynolds RM 0.0 at Van Wyk, Floodplain Restoration
-Taneum Creek RM 5 Restoration

Implementation
-SF Meadow Beaver Dam Analogs, SF Taneum headwaters RM 3.7
-SF Taneum Floodplain Restoration Phase I RM 0.4-3.2
-Tieton River Habitat Enhancement RM 4.2
-SF Manastash headwaters at Frost Meadows Adaptive Management
-Lick Creek pre commercial thinning
-Procurement of materials for pre-implementation
Account Type(s):
Expense
Contract Start Date:
03/01/2023
Contract End Date:
02/29/2024
Current Contract Value:
$1,623,630
Expenditures:
$1,298,904

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shirley Alvarado Yakama Confederated Tribes Yes Administrative Contact shirley_alvarado@yakama.com (509) 865-5121x6304
Wilbur Barrick Yakama Confederated Tribes No Technical Contact barw@yakamafish-nsn.gov (509) 929-2641
Joe Blodgett Yakama Confederated Tribes No Supervisor joe_blodgett@yakama.com (509) 865-6262x6372
Catherine Clark Bonneville Power Administration Yes Env. Compliance Lead cmclark@bpa.gov (503) 230-4240
Kelly Clayton Yakama Confederated Tribes Yes Technical Contact clak@yakamafish-nsn.gov (509) 945-7195
Ilene Goudy Yakama Confederated Tribes No Technical Contact goui@yakamafish-nsn.gov (509) 388-3217
Timothy Hanrahan Bonneville Power Administration Yes Backup COR TPHanrahan@bpa.gov (503) 230-3938
Douglas Knapp Bonneville Power Administration Yes Technical Contact ddknapp@bpa.gov (503) 230-3285
Jonathan Lambert Yakama Confederated Tribes Yes Technical Contact lamj@yakamafish-nsn.gov (503) 756-6742
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Leanna Longee Yakama Confederated Tribes No Administrative Contact Leanna_Longee@Yakama.com (509) 480-6405
John Marvin Yakama Confederated Tribes Yes Contract Manager marj@yakamafish-nsn.gov (509) 966-7406
Michelle O'Malley Bonneville Power Administration Yes COR mmomalley@bpa.gov (503) 230-5138
Tara O'Rourke Yakama Confederated Tribes No Technical Contact orot@yakamafish-nsn.gov (253) 350-0265
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Brandon Rossi Yakama Confederated Tribes Yes Technical Contact rossb@yakamafish-nsn.gov (509) 831-3565
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Completed Annual Report B: 132. YKFP Habitat Project 2023 Annual Report (3/1/23-02/28/24) 02/28/2024 02/28/2024
Effectiveimplementationmanagement and timelycontract administration C: 119. Project Management 02/28/2024 02/28/2024
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish D: 114. Identify and select projects 09/29/2023 09/29/2023
NEPA planning complete E: 165. Environmental Compliance 02/28/2024 02/28/2024
Technical review complete F: 122. YKFP Habitat, Water and Passage Technical Review Activities 02/28/2024 02/28/2024
Habitat/Passage/Structure maintained G: 186. Maintain Habitat Projects 02/28/2024 02/28/2024
Human Impact & Weed Inspections H: 198. Manage Habitat Parcels 02/28/2024 02/28/2024
Fence installed I: 40. Fortune Habitat Protection 02/29/2024
Crack willow removed J: 199. Pott Road invasive crack willow removal 02/28/2024 02/28/2024
House demolished K: 27. Pott Road house demolition 08/31/2023 06/30/2023
Renovation complete L: 186. Sampson barn renovation 11/30/2023 10/31/2023
Relocate beavers M: 190. Beaver Reintroduction 02/29/2024
Design permitted for construction P: 175. SF Tanuem Creek Floodplain Restoration RM 0.0-3.2 02/29/2024
Place large wood in SF Taneum Creek Q: 29. SF Taneum Creek Floodplain Restoration Phase 1 RM 0.4- 3.2 02/29/2024
Build beaver dam analogs R: 29. SF Meadow Beaver Dam Analogs, SF Taneum headwaters RM 3.7 02/29/2024
Design permitted for construction S: 175. Ahtanum Village RM 5.4 Final Design 02/28/2024
Design fully permitted for construction T: 175. SF Cowiche RM 9.5 and Reynolds RM 0.0 at Van Wyk, Floodplain Restoration 02/28/2024
Construction complete U: 29. Tieton River Habitat Enhancement RM 4.2 02/29/2024
Design fully permitted for construction V: 175. Taneum Creek RM 5 Final Design 02/29/2024
Add wood as necessary W: 29. SF Manastash headwaters at Frost Meadows Adaptive Management 02/28/2024
Logs hauling complete Y: 29. Procurement of materials for pre-implementation 02/28/2024
LiDAR Acquisition AA: 115. Acquisition for WF Teanaway River Design Data 02/29/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 175 Produce Design
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 6 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 4 instances of WE 175 Produce Design
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 115 Produce Inventory or Assessment
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 132 YKFP Habitat Project 2023 Annual Report (3/1/23-02/28/24)
C 119 Project Management
D 114 Identify and select projects
E 165 Environmental Compliance
F 122 YKFP Habitat, Water and Passage Technical Review Activities
G 186 Maintain Habitat Projects 03/01/2023
H 198 Manage Habitat Parcels 03/01/2023
I 40 Fortune Habitat Protection
J 199 Pott Road invasive crack willow removal 02/16/2023
K 27 Pott Road house demolition 03/28/2023
L 186 Sampson barn renovation 06/01/2023
M 190 Beaver Reintroduction
N 175 Yakima River Edge Habitat Phase III RM 184 11/01/2023
O 115 Yakima River RM 164 at Thorp, Reach Assessment 11/01/2023
P 175 SF Tanuem Creek Floodplain Restoration RM 0.0-3.2 11/01/2023
Q 29 SF Taneum Creek Floodplain Restoration Phase 1 RM 0.4- 3.2
R 29 SF Meadow Beaver Dam Analogs, SF Taneum headwaters RM 3.7
S 175 Ahtanum Village RM 5.4 Final Design 11/01/2023
T 175 SF Cowiche RM 9.5 and Reynolds RM 0.0 at Van Wyk, Floodplain Restoration 11/01/2023
U 29 Tieton River Habitat Enhancement RM 4.2
V 175 Taneum Creek RM 5 Final Design 11/01/2023
W 29 SF Manastash headwaters at Frost Meadows Adaptive Management 08/17/2022
X 29 Lick Creek pre commercial thinning and wood placement
Y 29 Procurement of materials for pre-implementation
Z 115 Naches River RM 18 Reach Assessment 11/01/2023
AA 115 Acquisition for WF Teanaway River Design Data 11/01/2023