Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 41: 2008-458-00 EXP STEELHEAD KELT RECONDITIONING 18MAR14
Project Number:
Title:
Steelhead Kelt Reconditioning
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Columbia Upper Middle 100.00%
Contract Number:
56662 REL 41
Contract Title:
2008-458-00 EXP STEELHEAD KELT RECONDITIONING 18MAR14
Contract Continuation:
Previous: Next:
56662 REL 10: 2008-458-00 EXP STEELHEAD KELT RECONDITIONING 4JAN;7MAY
  • 56662 REL 75: 2008-458-00 EXP STEELHEAD KELT RECONDITIONING
Contract Status:
Closed
Contract Description:
The goal of this project is to increase the abundance of naturally produced Upper Columbia River steelhead on their natural spawning grounds.  Project objectives include: (1) Implementing steelhead kelt reconditioning program in Upper Columbia River to increase natural origin steelhead spawner abundance relative to current conditions, (2) Evaluating kelt survival and program effectiveness, and (3) Collaborating with ongoing M&E studies to document the reproductive success of reconditioned kelts after release.  The scope of this contract covers steps taken in the third year of implementation of a kelt reconditioning program in the Upper Columbia River.  Activities expected to be completed within the contract period include the collection, reconditioning, transportation, and release of natural origin (NOR) steelhead kelts.  Coordination with affected stakeholders (USFWS, WDFW, USGS, USFS, Chelan PUD and Douglas PUD) regarding live spawning of NOR broodstock, placement of weir traps, and other methods of kelt collection will take place.  An effort will be made under thing contract to work with stakeholders to find areas where collaboration on projects could be mutually beneficial.  Steelhead kelt collection will continue under this contract.  A temporary weir trap designed to downstream migrating steelhead kelts will be operated in Little Bridge Creek, South Fork Gold Cr., Libby Cr., and Hancock Springs.  NOR kelts collected at these traps will be transported to the Methow Steelhead Kelt Facility (MSKF) for reconditioning.  In addition to trapping kelts at tributary weirs the YN will also participate in hook and line broodstock collection of steelhead for Winthrop National Fish Hatchery.  All NOR females used as broodstock by Winthrop National Fish Hatchery will be live spawned in a combined effort by the YN and USFWS staff.  All NOR females from the Twisp River conservation hatchery program operated by WDWF at the Methow Hatchery will be live spawned in a combined effort by the YN and WDFW staff.   Live spawning will allow the fishes' inclusion in the kelt reconditioning project.  YN will collaborate with Chelan County PUD to collect kelts moving downstream through the juvenile bypass at Rock Island dam. The reconditioning process will begin once kelts have been transported to the MSKF.  Reconditioning will include the reintroduction of feed and pathogen treatment.  Kelts will be reconditioned for approximately six months before they are released near the mouth of the Methow River.
Account Type(s):
Expense
Contract Start Date:
02/01/2014
Contract End Date:
01/31/2015
Current Contract Value:
$336,272
Expenditures:
$336,272

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Matthew Abrahamse Yakama Confederated Tribes Yes Contract Manager abrm@yakamafish-nsn.gov (509) 996-3122
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Monica Clark Yakama Confederated Tribes Yes Administrative Contact monica@yakama.com (509) 865-5121x6338
Michelle Guay Bonneville Power Administration No Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Nancy Weintraub Bonneville Power Administration Yes Interested Party nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Manage and administer 2014 upper Columbia kelt reconditioning project 01/31/2015 01/31/2015
Environmental Compliance Documentation C: 165. ESA compliance for project implementation 01/31/2015 01/31/2015
2014 Progress Report D: 132. Submit progress report for the period (1/2014) to (12/2014) 01/31/2015 01/31/2015
Kelts for the reconditioning project E: 66. Temporary tributary weirs - SF Gold Cr. and Hancock Springs 10/31/2014 10/31/2014
Kelts for the reconditioning project F: 66. Temporary tributary weir - Little Bridge Cr. 10/31/2014 10/31/2014
Kelts for the reconditioning project G: 66. Temporary tributary weir - Libby Cr. 10/31/2014 10/31/2014
Kelts for reconditioning project H: 66. Steelhead broodstock collection and live spawning 10/31/2014 10/31/2014
Functional Kelt Facility I: 61. Methow Steelhead Kelt Facility (MSKF) operation 01/31/2015 01/31/2015
Reconditioned Kelts J: 176. Steelhead kelt reconditioning 10/31/2014 10/31/2014
Upper Columbia River Steelhead Kelt Reconditioning Project Performance Check-in and Plan K: 174. UCR Steelhead Kelt Reconditioning Project Performance Check-in and Plan 07/31/2014 07/31/2014
Kelts for reconditioning project L: 66. Kelt Collection at Rock Island Dam 10/31/2014 10/31/2014
2013 BiOp report M: 141. 2013 BiOp RM&E Reporting (RPA 64) 02/15/2014 02/15/2014
2014 BiOp report (partial) N: 141. 2014 BiOp RM&E Reporting (RPA 64) 01/31/2015 01/31/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 5 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2014
B 119 Manage and administer 2014 upper Columbia kelt reconditioning project 02/01/2014
C 165 ESA compliance for project implementation 02/01/2014
D 132 Submit progress report for the period (1/2014) to (12/2014) 02/01/2014
E 66 Temporary tributary weirs - SF Gold Cr. and Hancock Springs 12/31/2014
F 66 Temporary tributary weir - Little Bridge Cr. 08/18/2014
G 66 Temporary tributary weir - Libby Cr.
H 66 Steelhead broodstock collection and live spawning 08/11/2014
I 61 Methow Steelhead Kelt Facility (MSKF) operation 12/09/2013
J 176 Steelhead kelt reconditioning 08/11/2014
K 174 UCR Steelhead Kelt Reconditioning Project Performance Check-in and Plan 12/09/2013
L 66 Kelt Collection at Rock Island Dam 08/11/2014
M 141 2013 BiOp RM&E Reporting (RPA 64) 02/01/2014
N 141 2014 BiOp RM&E Reporting (RPA 64) 02/01/2014