Contract 56662 REL 74: 1996-040-00 EXP MID-C COHO O&M / M&E
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
56662 REL 74
Contract Title:
1996-040-00 EXP MID-C COHO O&M / M&E
Contract Continuation:
Previous: Next:
56662 REL 43: 1996-040-00 EXP COHO RESTORATION MID-COLUMBIA - O&M/M&E
Contract Status:
Closed
Contract Description:
This contract period from Feb. 1, 2015 through Jan. 31, 2016 would continue programmatic objectives for the coho reintroduction program.  Duties to include primary O&M activities such as acclimation, adult collections and spawning and early egg incubation in both the Methow and Wenatchee basins.  Other actions are included as well (e.g.- carcass outplanting, etc.) but are part of these overarching program goals and objectives.  M&E activities include survival measures and data collection for status and trend analyses of the coho program; both within year and for long-term comparisons.  Modifications to the 2015 calendar year of events is that the Methow program will begin to prepare for a transition to the NPIP phase, which will require approximately double the adult collections for spawning (for 1 M juvenile production for release in 2017). This had been originally scheduled for 2016 releases for Methow NPIP but with the delays of 8mile (SUP through USFS), YN had to make the determination to delay a year to maintain project integrity for all releases during NPIP to occur simultaneously.  The Wenatchee program continues to work through the BDPII phase of the program and will look to repeat project-specific studies to try and determine if a contingency can be implemented if adults are unable to ascend Tumwater Canyon at the rate required to meet BDPII objectives.
Account Type(s):
Expense
Contract Start Date:
02/01/2015
Contract End Date:
01/31/2016
Current Contract Value:
$1,120,072
Expenditures:
$1,120,072

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Gregory Wolfe Yakama Confederated Tribes No Interested Party wolg@yakamafish-nsn.gov (509) 881-0674


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain environmental compliance B: 165. Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 01/31/2016 01/31/2016
Continue to develop operation plans and protocols C: 174. Hatchery Operations and Facility Plans 01/31/2016 01/31/2016
Conduct and document maintenance and repair activities D: 61. Subcontract O&M for maintenance of facilities 01/31/2016 01/31/2016
Manage and administer project, February 1, 2015 through January 31, 2016 E: 119. Manage and Administer 2015-2016 Project for Mid Columbia Coho Restoration 01/31/2016 01/31/2016
Acclimated smolts released F: 176. Acclimation/Release: Wenatchee: Coulter Creek pond (BY 2013) 06/01/2015 06/01/2015
Acclimated smolts released G: 176. Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2013) 06/10/2015 06/10/2015
Acclimated smolts released H: 176. Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2013) 06/01/2015 06/01/2015
Acclimated smolts released form Butcher Creek pond I: 176. Acclimation/Release: Wenatchee: Butcher Creek Pond (BY 2013) 06/10/2015 06/10/2015
Acclimated smolts released J: 176. Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2013) 04/30/2015 04/30/2015
Acclimated smolts released K: 176. Acclimation/Release: Gold Creek Ponds (BY 2013) 06/01/2015 06/01/2015
Acclimated smolts released L: 176. Acclimation/Release: Wolf Creek Pond (BY 2013) 06/01/2015 06/01/2015
Acclimated smolts released M: 176. Acclimation/Release: Winthrop NFH back channel rearing (BY 2013) 06/01/2015 06/01/2015
Acclimated smolts released N: 176. Acclimation/Release: Methow: Twisp Ponds (BY 2013) 06/01/2015 06/01/2015
CWT or PBT mark fish BY2014 O: 158. Mark/Tag Animals - Subcontract CWT or PBT of approximately 1,500,000 BY14 coho pre-smolts 09/01/2015 09/01/2015
Collection of 2015 Coho Broodstock: Wenatchee and Methow programs P: 66. Trap 2015 broodstock at Dryden, Tumwater, Wells, Methow FH, Winthrop NFH, and LNFH 12/03/2015 12/03/2015
Spawn 2015 brood coho at Leavenworth NFH Q: 176. Spawn 2015 brood coho at Leavenworth NFH 12/15/2015 12/15/2015
Spawn 2015 coho broodstock at Winthrop NFH R: 176. Spawn 2015 brood coho at Winthrop NFH 12/15/2015 12/15/2015
Carcass distribution for BY2015 broodstock S: 44. Carcass dispersal of a portion of 2015 broodstock in the Wenatchee and Methow River programs 01/31/2016 01/31/2016
Transport 2015 BY eyed coho eggs to rearing facilities T: 66. Transport 2015 brood eyed-eggs from incubation facilities to rearing facilities 01/20/2016 01/20/2016
Coho redd counts and spawning composition for the 2015 return year U: 157. Conduct spawning ground surveys for the 2015 return year in the Wenatchee Basin 01/15/2016 01/15/2016
2015 return year coho redd counts and spawning composition V: 157. Conduct spawning ground surveys for the 2015 return year in the Methow Basin 01/25/2016 01/25/2016
Completed database W: 157. Collect biological data from 2015 coho brood at spawning 12/01/2015 12/01/2015
CWT recovery data from the 2015 BY X: 157. Extract CWT from 2015 brood coho snouts collected at spawning and on spawning ground surveys 01/31/2016 01/31/2016
PIT tag fish 2014 BY Y: 158. Mark/Tag Animals - PIT-tag 66,000 BY14 coho pre-smolts 01/30/2016 01/30/2016
Analyze data from 2015 BY Z: 162. Analyze and interpret M&E data from 2015 brood 01/31/2016 01/31/2016
Enter data AA: 160. Enter data into and maintain local databases 01/30/2016 01/30/2016
Collect data during 2015 emergence AB: 157. Collect/Generate Field and Lab Data to determine 2015 emergence timing, growth and distribution 01/31/2016 01/31/2016
Progress Report has been published AC: 132. Submit Annual Report for the FY13 period (2/1/13 to 1/31/14) 11/15/2015 11/15/2015
Progress Report has been published AD: 132. Submit Annual Report for the FY14 period (2/1/14 to 1/31/15) 11/30/2015 11/30/2015
Tissue analysis by CRITFC for genetic monitoring AE: 157. Analyze genetic tissue samples for PBT analysis of parental groups 01/31/2016 01/31/2016
Progress Report has been published AF: 132. Begin preparation for annual reporting of the CY15 period (1/1/15 through 12/31/15) 01/31/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 11 instances of WE 176 Produce Hatchery Fish
  • 2 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2015
B 165 Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 02/01/2015
C 174 Hatchery Operations and Facility Plans 02/01/2015
D 61 Subcontract O&M for maintenance of facilities 02/01/2015
E 119 Manage and Administer 2015-2016 Project for Mid Columbia Coho Restoration 02/01/2015
F 176 Acclimation/Release: Wenatchee: Coulter Creek pond (BY 2013) 02/01/2015
G 176 Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2013) 02/03/2015
H 176 Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2013) 02/01/2015
I 176 Acclimation/Release: Wenatchee: Butcher Creek Pond (BY 2013) 02/01/2015
J 176 Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2013) 02/01/2015
K 176 Acclimation/Release: Gold Creek Ponds (BY 2013) 02/01/2015
L 176 Acclimation/Release: Wolf Creek Pond (BY 2013) 02/01/2015
M 176 Acclimation/Release: Winthrop NFH back channel rearing (BY 2013) 02/01/2015
N 176 Acclimation/Release: Methow: Twisp Ponds (BY 2013) 02/03/2015
O 158 Mark/Tag Animals - Subcontract CWT or PBT of approximately 1,500,000 BY14 coho pre-smolts 02/01/2015
P 66 Trap 2015 broodstock at Dryden, Tumwater, Wells, Methow FH, Winthrop NFH, and LNFH 02/01/2015
Q 176 Spawn 2015 brood coho at Leavenworth NFH 02/01/2015
R 176 Spawn 2015 brood coho at Winthrop NFH 02/01/2015
S 44 Carcass dispersal of a portion of 2015 broodstock in the Wenatchee and Methow River programs 02/01/2015
T 66 Transport 2015 brood eyed-eggs from incubation facilities to rearing facilities 02/01/2015
U 157 Conduct spawning ground surveys for the 2015 return year in the Wenatchee Basin 02/01/2015
V 157 Conduct spawning ground surveys for the 2015 return year in the Methow Basin 02/01/2015
W 157 Collect biological data from 2015 coho brood at spawning 02/01/2015
X 157 Extract CWT from 2015 brood coho snouts collected at spawning and on spawning ground surveys 02/01/2015
Y 158 Mark/Tag Animals - PIT-tag 66,000 BY14 coho pre-smolts 02/01/2015
Z 162 Analyze and interpret M&E data from 2015 brood 02/01/2015
AA 160 Enter data into and maintain local databases 02/01/2015
AB 157 Collect/Generate Field and Lab Data to determine 2015 emergence timing, growth and distribution 02/01/2015
AC 132 Submit Annual Report for the FY13 period (2/1/13 to 1/31/14) 02/01/2015
AD 132 Submit Annual Report for the FY14 period (2/1/14 to 1/31/15) 02/01/2015
AE 157 Analyze genetic tissue samples for PBT analysis of parental groups 02/01/2015
AF 132 Begin preparation for annual reporting of the CY15 period (1/1/15 through 12/31/15) 02/01/2015