Province | Subbasin | % |
---|---|---|
Columbia Plateau | Yakima | 100.00% |
Previous: | Next: |
---|---|
55510: 2010-030-00 EXP YN PROVIDE VSP ESTIMATE FOR YAKIMA STEELHEAD MPG |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Dave Fast | Yakama Confederated Tribes | No | Supervisor | fast@yakama.com | (509) 966-5291 |
Sandra Fife | Bonneville Power Administration | Yes | COR | safife@bpa.gov | (503) 230-3678 |
Chris Frederiksen | Yakama Confederated Tribes | Yes | Contract Manager | chrisf@yakama.com | (509) 966-5156 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Khanida Mote | Bonneville Power Administration | Yes | Contracting Officer | kpmote@bpa.gov | (503) 230-4599 |
Andrew Murdoch | Washington Department of Fish and Wildlife (WDFW) | Yes | Technical Contact | andrew.murdoch@dfw.wa.gov | (509) 664-3148x15 |
Gabriel Temple | Washington Department of Fish and Wildlife (WDFW) | Yes | Technical Contact | gabriel.temple@dfw.wa.gov | (509) 925-4467 |
Kurt Unger | Bonneville Power Administration | Yes | Env. Compliance Lead | klunger@bpa.gov | (503) 230-5885 |
Adrienne Wilson | Yakama Confederated Tribes | Yes | Administrative Contact | Adrienne_Wilson@Yakama.com | (509) 865-5121x6306 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
EC documents obtained for this contract | B: 165. Provide EC documentation to BPA | 10/01/2013 | 10/01/2013 | |
Purchase additional telemetry equipment and Install or maintain fixed site telemetry receivers | C: 70. Purchase and Install temporary fixed site radio telemetry receivers | 06/28/2013 | 06/28/2013 | |
500 migrating steelhead fitted with radiotags | D: 158. Insert radio tags into steelhead | 05/17/2013 | 05/17/2013 | |
PIT-tag juvenile steelhead in tributaries of Naches | E: 158. PIT-tag juvenile steelhead | 10/14/2013 | 10/14/2013 | |
Track tagged steelhead throughout Yakima Basin | F: 157. Conduct radio telemetry study | 07/31/2013 | 07/31/2013 | |
Synthesize Biological data and store in local database | G: 157. Collect biological data on migrating adult steelhead | 10/14/2013 | 10/14/2013 | |
Fulfill all administrative tasks with quality products and in a timely manner. | H: 119. Manage and administer project | 10/14/2013 | 10/14/2013 | |
Supply WDFW with materials to construct spare antennas and replacement Instream arrays | I: 70. Purchase Instream Array equipment for temporary instream PIT-tag detector | 07/31/2013 | 07/31/2013 | |
Annual Report for time period October 2011 through October 2012 | J: 132. Annual report for prior years work elements | 10/14/2013 |
Primary Focal Species | Work Statement Elements |
---|---|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 10/15/2012 | ||||||
B | 165 | Provide EC documentation to BPA | 10/15/2012 | ||||||
C | 70 | Purchase and Install temporary fixed site radio telemetry receivers | 10/15/2012 | ||||||
D | 158 | Insert radio tags into steelhead | 10/15/2012 | ||||||
E | 158 | PIT-tag juvenile steelhead | 10/15/2012 | ||||||
F | 157 | Conduct radio telemetry study | 10/15/2012 | ||||||
G | 157 | Collect biological data on migrating adult steelhead | 10/15/2012 | ||||||
H | 119 | Manage and administer project | 10/15/2012 | ||||||
I | 70 | Purchase Instream Array equipment for temporary instream PIT-tag detector | 10/15/2012 | ||||||
J | 132 | Annual report for prior years work elements | 10/15/2012 |