Completed NEPA Checklist |
B: 165. NEPA Analysis and Documentation |
|
04/30/2013 |
04/26/2013 |
Selection of Restoration Projects |
C: 114. Identify and Select New Restoration Projects |
|
04/30/2013 |
04/26/2013 |
In-stream channel enhancements |
D: 29. Place Instream LWD in Sheep Creek |
|
04/30/2013 |
01/29/2013 |
Supplementation of existing food and dam building materials for beaver |
E: 29. Enhance Beaver dam supplies |
|
04/30/2013 |
04/30/2013 |
Enhanced Floodplain Communities on Sheep Creek |
F: 47. Enhance Floodplain Plant Communities at Sheep Creek Allotments 336/340 |
|
04/30/2013 |
04/30/2013 |
Install and maintain HDX PIT tag systems |
G: 70. Install and maintain PIT-tag fixed interrogation stations |
|
04/30/2013 |
04/01/2013 |
Fish Traps Installed and Maintained |
H: 70. Install and maintain migration traps |
|
04/30/2013 |
04/30/2013 |
Data from redband trout captured in migrant traps |
I: 157. Sample Fish Using Migration Traps |
|
04/30/2013 |
04/30/2013 |
Electroshock Sampling of Fish in Hangman Watershed |
J: 157. Sample Fish Using Electroshocking Equipment |
|
04/30/2013 |
02/28/2013 |
PIT-tag juvenile and adult redband trout in Hangman Creek. |
K: 158. Uniquely mark redband trout in upper Hangman |
|
04/30/2013 |
04/30/2013 |
Abundance and life-history information for migratory redband trout in upper Hangman |
L: 162. Analyze data generated from trapping and PIT tagging of redband trout captured in migrant traps |
|
04/30/2013 |
04/30/2013 |
Examination of distribution and abundance patterns at the sub-watershed and watershed scale |
M: 162. Analyze data generated from sampling salmonids in rearing habitats in upper Hangman watershed |
|
04/30/2013 |
04/30/2013 |
Maintained Fisheries Database. |
N: 160. Maintain Fisheries Database |
|
04/30/2013 |
04/30/2013 |
Fish Habitat Variables Collected |
O: 157. Collect Physical Habitat data in Reference and Treatment Reaches |
|
04/30/2013 |
03/08/2013 |
Water Quality Data Collected |
P: 157. Collect Water Quality & Quantity Data |
|
04/30/2013 |
04/30/2013 |
Continuous Temperature Data Collected |
Q: 157. Monitor Water and Air Temperature |
|
04/30/2013 |
04/26/2013 |
Field Data Transfer |
R: 159. Transfer Data from Field Equipment |
|
04/30/2013 |
04/26/2013 |
Habitat and Water Quality Databases Maintained |
S: 160. Maintain Water Quality and Physical Habitat Database |
|
04/30/2013 |
04/26/2013 |
Water Quality Analyzed |
T: 162. Analyze Water Quality |
|
04/30/2013 |
04/26/2013 |
Physical Habitat Analyzed |
U: 162. Analyze Physical Habitat |
|
04/30/2013 |
04/26/2013 |
GIS Summarization of Project Data Collected |
V: 161. Summarize Water Quality, Physical habitat, and Fisheries using GIS |
|
04/30/2013 |
04/26/2013 |
Project report for the period (May 2010) to (April 2012) uploaded to the BPA website |
W: 132. Produce Annual Report 2010-11 |
|
04/30/2013 |
|
Management and Administration of Project |
X: 119. Manage and Administer Project |
|
04/30/2013 |
04/30/2013 |