Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 60107: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION M&E
Project Number:
Title:
Grande Ronde Supplementation Operations and Maintenance (O&M) and Monitoring and Evaluation (M&E) on Lostine River
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
60107
Contract Title:
1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION M&E
Contract Continuation:
Previous: Next:
55021: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION M&E
  • 63319: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION M&E
Contract Status:
Closed
Contract Description:
This contract provides for monitoring and evaluation of the Nez Perce Tribe’s Chinook salmon supplementation program in the Lostine River as well as the monitoring of steelhead returning to the Lostine River.  Monitoring and evaluation consists of data collection, data analysis, and communication of results.  These activities are coordinated and often accomplished cooperatively with fisheries co-managers of the Nez Perce Tribe.

The scope of this contract includes monitoring and evaluation of steelhead during the spring (February to July), an evaluation of returning adult Chinook salmon from the captive broodstock program, and an ongoing evaluation of natural and hatchery Chinook salmon within the Wallowa/ Lostine River River Spring Chinook population area, as its defined by the Interior Columbia Technical Review Team.  Ongoing work includes evaluating fin clip and mark retention rates, monitoring and evaluation at the Lostine River Acclimation Facility, monitoring and evaluation at the Lostine River Weir Facility, conducting spawning ground surveys in northeast Oregon, marking juvenile Chinook salmon, analysis of data, coordinating monitoring and evaluation in the Lostine River with co-managers, and providing technical representation for the Nez Perce Tribe for regional monitoring and evaluation forums.  The analysis of the data for this contract will begin with summarizing data for the performance measures outlined in the Monitoring and Evaluation Plan for Northeast Oregon Hatcheries (Hesse et al. 2006).  These performance measures describe juvenile and adult life history characteristics, abundance, and survival of compare the performance of hatchery Chinook salmon to natural Chinook salmon.  The performance measures include the annual number of fish captured by origin and escapement, age at return, sex ratios, smolt-to-adult returns, spawner abundance, redd abundance and distribution, and progeny per parent ratios.  The analysis may include comparisons of trends in the Lostine River to other streams in Northeast Oregon such as the Minam and Wenaha rivers.  The results of data collection and analysis will be communicated to co-managers through an annual report.  Information that is pertinent to ongoing management of Lostine River Chinook salmon will be provided at Grande Ronde Subbasin Technical Oversite Team meetings, and the Annual Operation Plan meeting for the Lower Snake River Compensation Plan in Northeast Oregon.  Additionally, results may be presented at annual chapter meetings of the American Fisheries Society.
Account Type(s):
Expense
Contract Start Date:
01/01/2013
Contract End Date:
12/31/2013
Current Contract Value:
$391,151
Expenditures:
$391,151

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Peter Cleary Nez Perce Tribe Yes Contract Manager peterc@nezperce.org (208) 621-3572
Katey Grange Bonneville Power Administration Yes Env. Compliance Lead kcgrange@bpa.gov (503) 230-4047
James Harbeck Nez Perce Tribe No Interested Party jimh@nezperce.org (541) 432-2501
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Jay Hesse Nez Perce Tribe Yes Supervisor jayh@nezperce.org (208) 621-3552
Rebecca Johnson Nez Perce Tribe Yes Supervisor beckyj@nezperce.org (208) 621-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Jason Vogel Nez Perce Tribe No Interested Party jasonv@nezperce.org (208) 621-3602


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Provide a Capture Summary of ESA Listed Species A: 165. Ensure Environmental Compliance Requirements Have Been Met 02/15/2013 01/15/2013
Determine Percent of Juvenile Chinook Salmon Departing Volitionally B: 70. Set Up Juvenile Fish Monitoring Equipment 05/17/2013 05/09/2013
Determine the Mark Retention of Juvenile Hatchery Chinook Salmon C: 157. Sample Juvenile Hatchery Chinook Salmon at Lookingglass Hatchery 12/31/2013
PIT Tag Interrogation Data File and Site Log D: 157. Collect Data from Juvenile Spring Chinook Salmon Using PIT Tag Arrays at Acclimation 12/31/2013
Transfer and Upload Juvenile PIT Tag Data to PTAGIS E: 159. Reformat and Upload Juvenile PIT Tag Array Data to from Acclimation to PTAGIS 05/31/2013 05/08/2013
PIT Tag Recapture Data from the Lostine River Screw Trap F: 157. Assist ODFW with Data Collection at the Lostine River Screw Trap 12/31/2013
Juvenile Chinook Salmon Survival Estimate Data G: 157. Query Juvenile Mainstem Interrogation Data from PTAGIS 12/31/2013
Upload Steelhead Catch Data H: 157. Collect Data from Adult Steelhead Using the Lostine River Weir 12/31/2013
Upload Lostine River Weir Data to the LSRCP Database I: 157. Collect Data from Adult Chinook Salmon Using the Lostine River Weir 12/31/2013
Adult PIT Tag Recapture Files J: 159. Reformat and Upload Adult PIT Tag Recapture Data Collected at the Weir to PTAGIS 11/02/2013 09/24/2013
Wallowa and Lostine River Spring Chinook Salmon Spawning Ground Survey Data K: 157. Collect Data from Chinook Salmon and Bull Trout Using Spawning Ground Surveys 12/31/2013 11/15/2013
Mark Lostine River Conventional Chinook Salmon L: 158. PIT Tag Lostine River Hatchery Spring Chinook Salmon 10/18/2013 10/18/2013
Analyze and Interpret Adult Steelhead Catch and Recovery Data M: 162. Analyze and Interpret Adult Steelhead Performance Measure Data by Origin and Stock 12/31/2013 08/14/2013
Analyze and Interpret Lostine River Chinook Salmon Adult Returns by Origin and Stock N: 162. Analyze and Interpret Adult Chinook Salmon Performance Measure Data by Origin and Stock 12/20/2013
Life Stage Specific Survival O: 162. Analyze and Interpret Life Stage Specific Survival Data by Origin and Stock 11/20/2013
Final 2013 Annual Operation Plan for the Lower Snake River Compensation Program P: 191. Participate in the 2013 LSRCP AOP Meetings for the Grande Ronde and Imnaha River Subbasins 02/22/2013 01/29/2013
Participate in the 2014 LSRCP AOP Meetings for the Grande Ronde and Imnaha River Subbasins Q: 191. Participate in the 2014 LSRCP Pre-AOP Meetings for the Grande Ronde and Imnaha River Subbasins 12/31/2013 11/21/2013
Annual Progress Report for 2011 R: 132. Prepare and Submit an Annual Report to BPA for the period 1/2/2011 to 12/31/2011 06/17/2013 05/28/2013
Annual Progress Report for 2012 S: 132. Prepare and Submit an Annual Report to BPA for the period 1/2/2012 to 12/31/2012 12/31/2013
Complete Administrative Tasks T: 119. Manage and Administer the Project Contract 12/31/2013 12/30/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Ensure Environmental Compliance Requirements Have Been Met 01/01/2013
B 70 Set Up Juvenile Fish Monitoring Equipment 01/01/2013
C 157 Sample Juvenile Hatchery Chinook Salmon at Lookingglass Hatchery 01/01/2013
D 157 Collect Data from Juvenile Spring Chinook Salmon Using PIT Tag Arrays at Acclimation 01/01/2013
E 159 Reformat and Upload Juvenile PIT Tag Array Data to from Acclimation to PTAGIS 01/01/2013
F 157 Assist ODFW with Data Collection at the Lostine River Screw Trap 06/06/2013
G 157 Query Juvenile Mainstem Interrogation Data from PTAGIS 01/01/2013
H 157 Collect Data from Adult Steelhead Using the Lostine River Weir 06/06/2013
I 157 Collect Data from Adult Chinook Salmon Using the Lostine River Weir 06/06/2013
J 159 Reformat and Upload Adult PIT Tag Recapture Data Collected at the Weir to PTAGIS 01/01/2013
K 157 Collect Data from Chinook Salmon and Bull Trout Using Spawning Ground Surveys 01/01/2013
L 158 PIT Tag Lostine River Hatchery Spring Chinook Salmon 01/01/2013
M 162 Analyze and Interpret Adult Steelhead Performance Measure Data by Origin and Stock 01/01/2013
N 162 Analyze and Interpret Adult Chinook Salmon Performance Measure Data by Origin and Stock 01/01/2013
O 162 Analyze and Interpret Life Stage Specific Survival Data by Origin and Stock 01/01/2013
P 191 Participate in the 2013 LSRCP AOP Meetings for the Grande Ronde and Imnaha River Subbasins 01/01/2013
Q 191 Participate in the 2014 LSRCP Pre-AOP Meetings for the Grande Ronde and Imnaha River Subbasins 01/01/2013
R 132 Prepare and Submit an Annual Report to BPA for the period 1/2/2011 to 12/31/2011 01/01/2013
S 132 Prepare and Submit an Annual Report to BPA for the period 1/2/2012 to 12/31/2012 01/01/2013
T 119 Manage and Administer the Project Contract 01/01/2013
U 185 Periodic Status Reports for BPA 01/01/2013