Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62170: 2011-004-00 EXP JOHN R. PALENSKY O&M
Project Number:
Title:
ODFW Operation & Maintenance (O&M)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
62170
Contract Title:
2011-004-00 EXP JOHN R. PALENSKY O&M
Contract Continuation:
Previous: Next:
60418: 2011-004-00 EXP JOHN R. PALENSKY O&M
  • 66253: 2011-004-00 EXP JOHN R. PALENSKY O&M
Contract Status:
Closed
Contract Description:
In 1991, Burlington Bottoms, now called the John R. Palensky WMA, was the first site in Oregon to be purchased by the Bonneville Power Administration (BPA) under the Willamette and Columbia River Basins Fish and Wildlife Programs, to provide partial mitigation for the impacts associated with the construction of hydroelectric facilities.  The Oregon Department of Fish and Wildlife (ODFW) was contracted by BPA in 1993 to conduct interim management of the BB site, which included completion of a habitat assessment or habitat evaluation procedure (HEP).  In addition, a hydrology and hydraulics assessment was also conducted on the site in 1993. Results of the HEP and hydrology study were incorporated into the Environmental Assessment/ Management Plan written in 1994 (DOE/EA-0928).  Implementation of the EA/Management Plan began in 1995, and included custodial oversight and habitat restoration projects, including non-native vegetation removal.  In 2001, a second management plan was written, titled Five-Year Habitat Management Plan, 2001-2005.  This Plan addresses specific goals and objectives to be carried out over a five-year period, using various enhancement strategies to achieve the overall goal of protecting, maintaining and enhancing wildlife habitat on the site.   This Habitat Management Plan is being revised and will be completed in 2013.  During the term of the project, project activities and expenditures shall be consistent with BPA's Final Environmental Assessment/Management Plan and Finding of No Significant Impact (December 1994, DOE/EA-0928).  Project activities not considered in the 1994 Environmental Assessment will comply with NEPA requirements in separate documentation.  Consultation with the USFWS and/or NMFS will occur as necessary and the appropriate NEPA compliance and concurrence verification will be obtained.
        
The purpose of this scope of work is to continue implementation of various management activities that include: 1) operate and maintain the water control structure as part of moist soil management for the site; 2) habitat enhancement activities including non-native plant removal and native planting; 3) custodial management of the site; 4) monitoring and evaluation of past enhancement activities; and 5) finalization of the revised Habitat Management Plan to reflect past activities and on-the-ground conditions.  In addition to the management activities on the Palensky WMA, the scope of work includes some tasks related to the coordination and oversight of the Willamette Wildlife Agreement, which was developed between BPA and the State of Oregon in 2010.  Specifically, additional staff time has been included in order to 1) help identify potential acquisition projects in the north half of the Willamette Valley; 2) coordinate with acquisition sponsors during the solicitation process; 3) monitor completed acquisitions; and 4) assist acquisition sponsors with vegetation maintenance and restoration of previously-funded acquisitions.
Account Type(s):
Expense
Contract Start Date:
07/01/2013
Contract End Date:
06/30/2014
Current Contract Value:
$141,436
Expenditures:
$141,436

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package - Submit draft to COTR B: 119. Manage and Administer Projects 03/31/2014 03/31/2014
Complete environmental compliance requirements C: 165. Produce Environmental Compliance Documentation 06/30/2014 06/30/2014
Complete ownership/management proposal D: 174. Develop proposal for the future ownership of Palensky 06/30/2014 06/30/2014
Complete revised Habitat Management Plan E: 193. Revise and update Habitat Management Plan for Palensky 01/01/2014 12/31/2013
Complete vegetation removal F: 197. Remove invasive, non-native vegetation on Palensky 06/30/2014 06/30/2014
Complete plantings G: 47. Plant native vegetation on Palensky 06/30/2014 06/30/2014
Complete operation and maintenance activities H: 186. Operate & maintain water control structure on Palensky 06/30/2014 06/30/2014
Complete debris removal I: 27. Remove debris on Palensky 06/30/2014 06/30/2014
Complete site monitoring J: 26. Monitor authorized and unauthorized uses of the site on Palensky 06/30/2014 06/30/2014
Complete maintenance of roads & trails and replace signage K: 188. Maintain roads & trails for management access & replace signage on Palensky 06/30/2014 06/30/2014
Conduct outreach & education to various groups L: 99. Conduct meetings, tours, educational activities for Willamette Mitigation Program 06/30/2014 06/30/2014
Conduct site visits to assist in identification of potential mitigation sites M: 114. Conduct site visits to assist in identification of potential mitigation sites 06/30/2014 06/30/2014
Develop acquisition monitoring plan in conjunction with BPA N: 174. Develop acquisition monitoring plan in conjunction with BPA 06/30/2014 06/30/2014
Produce non-native vegetation removal plans O: 174. Prepare non-native vegetation removal plans for new mitigation sites 06/30/2014 06/30/2014
Complete vegetation removal on new mitigation sites P: 197. Remove invasive non-native vegetation on newly acquired mitigation sites 06/30/2014 06/30/2014
Attach Progress Report in Pisces Q: 132. Submit Progress Report for December 01, 2011 to June 30, 2013 05/09/2014 05/09/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 2 instances of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 193 Produce Land Management Plan
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2013
B 119 Manage and Administer Projects 07/01/2013
C 165 Produce Environmental Compliance Documentation 07/01/2013
D 174 Develop proposal for the future ownership of Palensky 07/01/2013
E 193 Revise and update Habitat Management Plan for Palensky
F 197 Remove invasive, non-native vegetation on Palensky 08/01/2013
G 47 Plant native vegetation on Palensky 08/01/2013
H 186 Operate & maintain water control structure on Palensky 07/01/2013
I 27 Remove debris on Palensky 07/01/2013
J 26 Monitor authorized and unauthorized uses of the site on Palensky 07/01/2013
K 188 Maintain roads & trails for management access & replace signage on Palensky 07/01/2013
L 99 Conduct meetings, tours, educational activities for Willamette Mitigation Program 07/01/2013
M 114 Conduct site visits to assist in identification of potential mitigation sites 07/01/2013
N 174 Develop acquisition monitoring plan in conjunction with BPA 07/01/2013
O 174 Prepare non-native vegetation removal plans for new mitigation sites 07/01/2013
P 197 Remove invasive non-native vegetation on newly acquired mitigation sites 08/01/2013
Q 132 Submit Progress Report for December 01, 2011 to June 30, 2013 07/01/2013