Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62940: 1995-057-00 EXP S I W M - IDFG DEER PARK O&M
Project Number:
Title:
Southern Idaho Wildlife Mitigation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Middle Snake Boise 10.00%
Upper Snake Snake Upper 90.00%
Contract Number:
62940
Contract Title:
1995-057-00 EXP S I W M - IDFG DEER PARK O&M
Contract Continuation:
Previous: Next:
59695: 1995-057-00 EXP S I W M - IDF&G DEER PARK
  • 66298: 1995-057-00 EXP S I W M - IDFG DEER PARK O&M
Contract Status:
Closed
Contract Description:
The purpose of this amendment is for the addition of $50,000 that was not included in the original contract.  In work element J under maintain previous planted vegetation, work is required on pressurized irrigation systems and laser leveling of previously farmed fields.  Original costs were under estimated by not including Bacon Davis wages and Idaho Department of Fish and Game overhead costs.


_________________________________
Background

Creation of the Deer Parks Complex Wildlife Management Unit (DPCWMU) was made possible by BPA funding, and the cooperative efforts of Idaho Department of Fish and Game (IDFG), Shoshone-Bannock Tribe (SBT), US Bureau of Land Management (BLM), Trust for Public Lands, The Conservation Fund, and others.

BPA is the principal contributor to land acquisition funding as well as ongoing operation and management funding. This contribution serves to partially mitigate for impacts associated with construction and operation of Palisades Dam on the South Fork Snake River. IDFG also contributes to ongoing operation and maintenance funding.

The first acquisition was the 140 acre K1 segment ("Menan"), acquired in 1997, and protecting an estimated 317 Habitat Units (HUs). Next was the 310 acre K2 segment ("Beaver Dick"), acquired in 1997, and protecting an estimated 901 HUs. Next was the 2,556 acre Boyle segment, acquired in 1999, and protecting an estimated 6,918 HUs. Next was the 81 acre Allen segment, acquired in 2002, and protecting an estimated 535 HUs. Last was the 120 acre Horkley segment, acquired in 2002, and protecting an estimated 195 HUs. All Habitat Unit protection estimates assume continuing O&M funding from BPA.

For the protection of Shoshone-Bannock Tribes' treaty rights, BLM holds title to the properties, and they are co-managed by IDFG and SBT. Sho-Ban tribal participation primarily is coordination with IDFG, to ensure protection of treaty rights. Coordination between IDFG and BLM occurs, primarily to ensure that management activities comply with federal regulations.  

The 5 segments are managed as a complex, for cost-effectiveness and management efficiency. Equipment, materials, supplies, and personnel can be shared between the segments.


Project Goals

Protect and maintain wetland, riparian, and upland habitats on the DPCWMU. The Mitigation Unit is comprised of 5 segments: Boyle, K1, K2, Horkley, and Allen.

1. Management of Acquired Lands.

2. Monitoring and Evaluation.

3. Coordination.

Coordination of the contract will involve IDFG, SBT, BLM and BPA.

Background - Quarter Circle O

The Quarter Circle O (QCO) acquisition, completed in December ,1997, added 705 acres fee-title plus 640 acres Idaho Department of Lands (IDL) lease to the existing 28,750 acres Tex Creek Wildlife Management area (TCWMA).  The three QCO parcels include approximately 3.75 miles of perennial stream in the Willow Creek, Tex Creek and Deer Creek drainages.  Historically the QCO has been farmed for grain and used as pasture for livestock.

Objectives

1.  Manage Vegetation
2.  Reduce soil erosion
3.  Noxious Weed control
4.  Protect habitat around bald eagle nest site
5.  Monitor vegetation and target species habitat

***Note:  non anadromous waters***
Account Type(s):
Expense
Contract Start Date:
10/01/2013
Contract End Date:
09/30/2014
Current Contract Value:
$335,576
Expenditures:
$335,576

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Receipt of clearance from BPA's Environmental Compliance Group B: 165. Obtain environmental compliance clearance 09/30/2014 09/29/2014
Complete activities to manage public access C: 188. Maintain signs and access points, prevent illegal use of property 09/30/2014 09/29/2014
Complete structure maintenance D: 186. Operate and maintain fences, gates, water control structures 09/30/2014 09/29/2014
Complete plantings E: 47. Plant vegetation 09/30/2014 07/01/2014
Complete coordination F: 189. Regional coordination 09/30/2014 09/29/2014
Complete project administration G: 119. Manage and Administer Projects 09/30/2014 09/29/2014
Attach Progress Report in Pisces H: 132. Submit Progress Report for the period 10/01/12 to 09/30/13 04/15/2014 03/31/2014
Continue Plantings on Quarter Circle O to protect habitat and HU's I: 47. Continue Plantings on Quarter Circle O to protect habitat and HU's 09/30/2014 09/29/2014
Maintain previously planted vegetation J: 198. Maintain previously planted vegetation 09/30/2014 09/29/2014
Remove vegetation for the purpose of fire prevention/control K: 199. Remove vegetation for the purpose of fire prevention/control 09/30/2014 09/29/2014
Protect habitat and HUs through control of noxious weeds on QCO L: 198. Protect habitat and HUs through control of noxious weeds on QCO 09/30/2014 09/29/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 2 instances of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2013
B 165 Obtain environmental compliance clearance 10/01/2013
C 188 Maintain signs and access points, prevent illegal use of property 08/23/2013
D 186 Operate and maintain fences, gates, water control structures 08/23/2013
E 47 Plant vegetation 08/23/2013
F 189 Regional coordination 10/01/2013
G 119 Manage and Administer Projects 10/01/2013
H 132 Submit Progress Report for the period 10/01/12 to 09/30/13 10/01/2013
I 47 Continue Plantings on Quarter Circle O to protect habitat and HU's 08/23/2013
J 198 Maintain previously planted vegetation 09/06/2013
K 199 Remove vegetation for the purpose of fire prevention/control 10/01/2013
L 198 Protect habitat and HUs through control of noxious weeds on QCO 10/01/2013