Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 63865: 1990-092-00 EXP WANAKET WILDLIFE AREA (OPERATIONS)
Project Number:
Title:
Wanaket Wildlife Area
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
63865
Contract Title:
1990-092-00 EXP WANAKET WILDLIFE AREA (OPERATIONS)
Contract Continuation:
Previous: Next:
60141: 1990-092-00 EXP WANAKET WILDLIFE AREA (OPERATIONS)
  • 67613: 1990-092-00 EXP WANAKET WILDLIFE AREA (OPERATION & ENHANCEMENTS)
Contract Status:
Closed
Contract Description:
The 2,817 acre Wanaket Wildlife Area was established in 1992 to mitigate for habitat losses due to construction and operation of the McNary Hydroelectric facility.  The wildlife area is located in Umatilla County and lies adjacent to the south shore of the Columbia River between River Mile 295 and 299.  It is bordered by the  Port of Umatilla on the west and Hat Rock State Park on the east.  State Highway 730 bisects the area.  The legal description includes T5N, R28E, portions of sections 12, 23, 34 and T5N, R29E, portions of sections 16, 17, 18, 19, 20, and 21.  

Wanaket is managed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR), through contract with BPA, to provide protection and enhancement credits for wildlife mitigation.  Wanaket provides an estimated 2,334 habitat units of protection credit for 7 wildlife mitigation species.  HEP species include mallard, California quail, western meadowlark, spotted sandpiper, mink, yellow warbler, and downy woodpecker.  Primary habitat types include shrub-steppe/grassland (2477 acres) and riparian wetland (159 acres) and other habitat types include riparian herb, riparian shrub, riparian tree, and sand/cobble/gravel/mud.  

This is a 1 year contract, which includes the period between January 1, 2014 through December 31, 2014.  This SOW is a continuation of management activities on Wanaket Wildlife Area and provides direction for planned actions in the 1 year contract period.   Many of the major tasks are annual in nature and contribute to the on-going protection of the wildlife area.  Management focuses on providing wetland habitat by applying irrigation water to the "McNary Potholes"; exclusion of un-permitted livestock grazing; enhancing native vegetation through removing undesirable vegetation, noxious weed control, planting native vegetation; and providing regulated public access.  

Project activities include: 1) planning and design, 2) construction and implementation, 3) operations and maintenance, and 4) monitoring..  Management efforts undertaken as part of this contract are designed to protect, enhance, and mitigate target wildlife mitigation species.

Management activities planned for 2014  focus on the following tasks:

- Administration and operations of Wanaket Wildlife Area
- Maintain wetlands by applying irrigation water
- Maintain the irrigation infrastructure
- Continue noxious weed surveillance and  treatment program
- Maintain Russian olive removal sites by treating re-sprouting Russian olive trees
- Treat managed wetlands to reduce cover of cattail and bulrush
- Maintain boundary fence to prevent trespass livestock
- Provide regulated public access
- Monitor results of weed control and revegetation efforts
- Monitor waterfowl production by conducting waterfowl pair and brood counts
Account Type(s):
Expense
Contract Start Date:
01/01/2014
Contract End Date:
12/31/2014
Current Contract Value:
$259,960
Expenditures:
$259,960

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Project Implementation Management and General Administrative Duties 12/24/2014 12/24/2014
Successful and timely environmental compliance documentation and clearance B: 165. Environmental Compliance Clearance for ecological restoration & habitat enhancement projects 09/30/2014 09/30/2014
Spray, mow, excavate, burn, and hand pull unwanted vegetation C: 199. Remove Vegetation from wetlands to create more open water habitat; remove invasive weeds 12/31/2014 12/31/2014
Maintain pumps, ditches, and water structures; irrigate 160 acres D: 186. Irrigation System Maintenance and Operation 12/31/2014 12/31/2014
Coordinate w/vector control to minimize mosquito production E: 190. Assist Vector Control District in Reducing Vector Production 12/31/2014 12/31/2014
Provide 75 days of regulated public access per calendar year F: 188. Provide Regulated Public Access 12/31/2014 12/24/2014
Remove dumped material from 2,817 acres G: 27. Remove Modern Trash from Illegal Dumping 12/31/2014 12/31/2014
Reduce criminal activities on site H: 26. Reduce Trespass and other criminal activities 12/31/2014 12/31/2014
Repair pump house and well I: 34. Rebuild pumphouse and pumphouse components and aerate well [carried-over from FY13 (#60141 - WE: K)] 08/31/2014 08/31/2014
Native shrubs planted in the WUWU J: 47. Plant native shrubs in the west upland weed unit 12/31/2014
Submit 2-year Progress Report for 2012 and 2013 (01/01/2012 to 12/31/2013) L: 132. Submit Progress Report for the period Jan 1, 2012 to Dec 31, 2013 05/31/2014 05/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project Implementation Management and General Administrative Duties 01/01/2014
B 165 Environmental Compliance Clearance for ecological restoration & habitat enhancement projects 01/01/2014
C 199 Remove Vegetation from wetlands to create more open water habitat; remove invasive weeds 06/30/2014
D 186 Irrigation System Maintenance and Operation 03/25/2014
E 190 Assist Vector Control District in Reducing Vector Production 01/01/2014
F 188 Provide Regulated Public Access 01/01/2014
G 27 Remove Modern Trash from Illegal Dumping 01/01/2014
H 26 Reduce Trespass and other criminal activities 01/01/2014
I 34 Rebuild pumphouse and pumphouse components and aerate well [carried-over from FY13 (#60141 - WE: K)] 06/30/2014
J 47 Plant native shrubs in the west upland weed unit 06/30/2014
K 181 Re-establish Wetlands 03/25/2014
L 132 Submit Progress Report for the period Jan 1, 2012 to Dec 31, 2013 01/01/2014
M 185 Periodic Status Reports for BPA 01/01/2014