Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 64527: 2003-017-00 EXP ISEMP - ECOLOGICAL RESEARCH - JOHN DAY
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
64527
Contract Title:
2003-017-00 EXP ISEMP - ECOLOGICAL RESEARCH - JOHN DAY
Contract Continuation:
Previous: Next:
59730: 2003-017-00 EXP ISEMP - ECOLOGICAL RESEARCH - JOHN DAY
  • 67511: 2003-017-00 EXP ISEMP - ECOLOGICAL RESEARCH - JOHN DAY
Contract Status:
Closed
Contract Description:
Contract Description: The Integrated Status and Effectiveness Monitoring Program (ISEMP, 2003-017-00) is an ongoing collaborative effort to design, test, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and their habitat, and watershed-scale Effectiveness Monitoring for management actions impacting salmon and steelhead populations and habitat in the Interior Columbia River Basin.

ISEMP explicitly addresses work requirements of many 2008 FCRPS Biological Opinion RPAs (56.1, 56.2, 56.3, 57.1, 57.2, 57.3, 57.4, 57.5) and is directly related to additional 2008 FCRPS Biological Opinion implementation strategy requirements and recommendations. ISEMP takes a pilot-project approach to the research and development of monitoring by implementing experimental programs in several major subbasins of the Interior Columbia: the Wenatchee, Entiat, Methow, John Day, South Fork Salmon and Lemhi River basins. The overall goal of the project is to provide regional salmon management agencies with the data, information and tools necessary to design efficient and effective monitoring programs.

Specifically, ISEMP generates quantitative guidance on and examples of: the robustness and limitations of population and habitat monitoring protocols, indicators and metrics; sampling design approaches for the distribution of monitoring effort in time and space; analytical approaches to the evaluation of monitoring data, information and programs; effective data management and communication designs that support the use, standardization and compilation of implementation, compliance, status, trends and effectiveness monitoring data by regional data generators and decision makers; and finally the design and implementation of watershed-scale restoration actions to maximize both the biological impact and associated learning opportunities resulting from the design and implementation strategy.

Through its work to date, ISEMP has developed expertise in the coordination and implementation of large-scale monitoring data collection programs. Applying this experience, ISEMP coordinates the installation, maintenance and calibration of in-stream PIT tag arrays across the Snake River basin and is designing and coordinating the implementation of a Columbia River basin-wide stream habitat status and trends monitoring. These programmatic implementation facets of ISEMP leverage previous experience with logistics and social factors to effectively implement comprehensive, standardized monitoring research and development at an unprecedented scale.  

This contract is one of several contracts that will implement this project.  Each contract is responsible for an end of contract progress report.  Additionally, a project level "synthesis report" will also be produced under this project and data and analysis from this contract will be utilized in the production of that project level report.  The synthesis report is a deliverable under the TerraQua contract (not this contract) under this project.

Eco Logical Research, Inc will perform specific design and coordination elements of the overall project in the Wenatchee, Salmon, and John Day River basins.
Account Type(s):
Expense
Contract Start Date:
12/01/2013
Contract End Date:
11/30/2014
Current Contract Value:
$939,942
Expenditures:
$939,942

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Time and Materials
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Beasley Quantitative Consultants Inc Yes Interested Party chris@qcinc.org (360) 620-2883
Nick Bouwes Eco Logical Research Yes Contract Manager nbouwes@gmail.com (435) 760-0771
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Chris Jordan National Oceanic and Atmospheric Administration Yes Supervisor chris.jordan@noaa.gov (541) 754-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Pamela Nelle Terraqua, Inc. Yes Interested Party pamela@terraqua.biz (509) 885-8143
Meagan Polino Eco Logical Research Yes Technical Contact mtpolino@gmail.com (435) 757-7201
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Jody White Quantitative Consultants Inc Yes Interested Party jody@qcinc.org (208) 860-5269


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance completed B: 165. Environmental compliance 03/30/2014 03/30/2014
ISEMP John Day Subbasin Coordination (ELR) C: 191. ISEMP John Day Subbasin Coordination (ELR) 11/30/2014 11/30/2014
ISEMP Project Coordination (ELR) D: 189. ISEMP Project Coordination (ELR) 11/30/2014 11/30/2014
All administrative tasks fulfilled with timely quality products E: 119. Project Management 11/30/2014 11/30/2014
ISEMP John Day subbasin data analysis F: 162. ISEMP John Day subbasin data analysis 11/30/2014 11/30/2014
Conduct juvenile seining and PIT tagging activities in Bridge Creek and the South Fork John Da G: 157. Conduct juvenile seining and PIT tagging activities in Bridge Creek IMW 11/30/2014 11/30/2014
Mark/Tag salmonids captured in Bridge Creek seining surveys H: 158. Mark/Tag salmonids captured in the Bridge Creek IMW seining surveys 11/30/2014 11/30/2014
Juvenile seining for in intensively surveyed watersheds I: 157. Conduct juvenile seining in intensively surveyed watersheds 11/30/2014 11/30/2014
Mark/Tag salmonids in intensively surveyed watersheds J: 158. Mark/Tag salmonids intensively surveyed watersheds 11/30/2014 09/01/2014
Bridge Creek and South John Day Basin habitat sampling K: 157. Bridge and South Fork John Day IMW habitat sampling 11/30/2014 11/30/2014
Intensively surveyed watersheds of the John Day Basin habitat sampling L: 157. Habitat sampling in intensively surveyed watersheds of the John Day Basin 11/30/2014 09/01/2014
Enter data into ISEMP Database (ELR) M: 159. Enter data in ISEMP Database (ELR) in support for Lessons Learned Report 11/30/2014 11/30/2014
Beaver dam structural supports N: 29. Beaver dam structural supports 11/30/2014 11/30/2014
Development of ISEMP sampling designs and protocols O: 156. Development of ISEMP sampling designs and protocols 11/30/2014 11/30/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2013
B 165 Environmental compliance 12/01/2013
C 191 ISEMP John Day Subbasin Coordination (ELR) 12/01/2013
D 189 ISEMP Project Coordination (ELR) 12/01/2013
E 119 Project Management 12/01/2013
F 162 ISEMP John Day subbasin data analysis 12/01/2013
G 157 Conduct juvenile seining and PIT tagging activities in Bridge Creek IMW 11/06/2013
H 158 Mark/Tag salmonids captured in the Bridge Creek IMW seining surveys 11/06/2013
I 157 Conduct juvenile seining in intensively surveyed watersheds 11/06/2013
J 158 Mark/Tag salmonids intensively surveyed watersheds 11/06/2013
K 157 Bridge and South Fork John Day IMW habitat sampling 11/06/2013
L 157 Habitat sampling in intensively surveyed watersheds of the John Day Basin 11/06/2013
M 159 Enter data in ISEMP Database (ELR) in support for Lessons Learned Report 12/01/2013
N 29 Beaver dam structural supports 11/06/2013
O 156 Development of ISEMP sampling designs and protocols 11/06/2013
P 132 Annual FCRPS BiOp RM&E reports 12/01/2013