Province | Subbasin | % |
---|---|---|
Columbia Cascade | Okanogan | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Requirements | B: 165. Environmental Compliance Requirements | 04/30/2015 | 04/30/2015 | |
All administrative tasks fulfilled with timely quality products | C: 119. Fulfill all administrative tasks with quality products in a timely manner | 05/01/2015 | 05/01/2015 | |
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR | D: 191. Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB | 06/30/2015 | 06/30/2015 | |
Evaluation of fish passage conditions during controlled releases. | E: 186. Evaluate fish passage conditions during controlled releases | 06/01/2015 | 06/05/2015 | |
Engineered design for bank stabilization structures | F: 175. Design of instream structures to stabilize streambank | 05/15/2015 | 05/15/2015 | |
install 2 to 3 instream structures | G: 29. Install 2 - 3 instream structures to stabilize stream bank | 07/31/2015 | 03/31/2015 | |
Attach Progress Report in Pisces | H: 132. Submit Progress(Annual) Report for the period 8/1/2013 to 7/31/2014 | 05/31/2015 | 06/30/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 08/01/2014 | ||||||
B | 165 | Environmental Compliance Requirements | 08/01/2014 | ||||||
C | 119 | Fulfill all administrative tasks with quality products in a timely manner | 08/01/2014 | ||||||
D | 191 | Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB | 08/01/2014 | ||||||
E | 186 | Evaluate fish passage conditions during controlled releases | 08/01/2014 | ||||||
F | 175 | Design of instream structures to stabilize streambank | 08/01/2014 | ||||||
G | 29 | Install 2 - 3 instream structures to stabilize stream bank | 03/13/2015 | ||||||
H | 132 | Submit Progress(Annual) Report for the period 8/1/2013 to 7/31/2014 | 08/01/2014 |