Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67555: 2010-032-00 EXP IMNAHA RIVER STEELHEAD STATUS
Project Number:
Title:
Imnaha River Steelhead Status Monitoring
Stage:
Closed
Area:
Province Subbasin %
Blue Mountain Imnaha 100.00%
Contract Number:
67555
Contract Title:
2010-032-00 EXP IMNAHA RIVER STEELHEAD STATUS
Contract Continuation:
Previous: Next:
63259: 2010-032-00 EXP IMNAHA RIVER STEELHEAD STATUS
  • 71016: 2010-032-00 EXP IMNAHA RIVER STEELHEAD STATUS MONITORING
Contract Status:
Closed
Contract Description:
This fast track project will provide high precision population status and trend information for Imnaha River steelhead. Information regarding Snake River steelhead is considered a high priority for informing managers .  Population abundance and productivity data are used by multiple entities in the Columbia Basin (e.g. assessing ESA listing status, harvest season opportunities, and effectiveness of management actions).  Most important is the ability to describe a population’s abundance relative to management goals, quasi-extinction thresholds, sustainable harvest, and ecological process.  The Imnaha River steelhead population is unique in the Snake River DPS in that it: 1) is physically small enough to conduct sampling of steelhead (mainstem flow and manageable number of spawning/rearing aggregates), 2) has a dendritic structure of spawning areas occurring across the entire range of elevations available to Snake basin DPS steelhead (spawning in areas from 1,000 feet up to 6,000 feet), and 3) has a supplementation program occurring in just two of its spawning aggregates.

This project will use data collected from a variety of monitoring techniques including floating weirs, fixed weirs, and PIT tag arrays throughout the Imnaha River drainage.  NPT staff will deploy customized weirs in the upper tributaries of the Imnaha River that serve as spawning grounds for the endemic steelhead of the subbasin (Freezeout, Summit, Grouse, Crazyman, Mahogany, Dry and Gumboot). The ISEMP project (BPA Project No. 200301700) is also a fast track proposal that installed two PIT tag arrays in lower Imnaha River and two arrays in the upper mainstem Imnaha River and Big Sheep Creek. In addition, small stream PIT tag array systems where deployed in Camp and Crazyman creeks. These arrays are also relied upon to provide one measure of steelhead population escapement to the Imnaha River and to specific spawning tributaries.  Weirs will monitor adult fish passage and distribution from February through June, while PIT tag arrays will operated year around.  We will incorporate results from these efforts and other monitoring results conducted under the Lower Snake River Compensation Program for a comprehensive understanding of the Imnaha steelhead population.

Given the desire for escapement data, hatchery composition, and age structure information on the population, physically handling of a portion of the run is necessary to enable biological sampling.  This project will provide high accuracy and precision escapement estimates to Imnaha tributaries hatchery fraction, age structure, age-at-return, size-at-return, age-at-emigration, percent females, adult run-timing, and within population spatial structure/distribution.  The Regional RM&E Collaboration strategies for Snake River basin spring/summer Chinook and steelhead call for high precision estimates of adult abundance (coefficient of variation of 15% or less) in at least one population per life history type per Major Population Group. High precision priority populations identified included Imnaha River steelhead (Coordinated Anadromous Workshop 2010).  In addition, adult abundance data from these populations was identified as necessary to fulfill Federal Columbia River Power System RPAs: 50.5 (CAA/NOAA/NPCC RM&E Workgroup 2009 and Coordinated Anadromous Workshop 2010).
Account Type(s):
Expense
Contract Start Date:
01/01/2015
Contract End Date:
12/31/2015
Current Contract Value:
$411,272
Expenditures:
$411,272

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Deborah Docherty Bonneville Power Administration Yes COR dldocherty@bpa.gov (503) 230-4458
Neal Espinosa Nez Perce Tribe Yes Technical Contact neale@nezperce.org (541) 432-2502x3772
Katey Grange Bonneville Power Administration No Interested Party kcgrange@bpa.gov (503) 230-4047
James Harbeck Nez Perce Tribe Yes Contract Manager jimh@nezperce.org (541) 432-2501
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Jay Hesse Nez Perce Tribe Yes Supervisor jayh@nezperce.org (208) 621-3552
Amber MacLachlan Bonneville Power Administration Yes Contracting Officer almcmahon@bpa.gov (503) 230-3983
Jason Vogel Nez Perce Tribe Yes Technical Contact jasonv@nezperce.org (208) 621-3602
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Jesse Wilson Bonneville Power Administration Yes Env. Compliance Lead jcwilson@bpa.gov (503) 230-4506


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance complete A: 165. Ensure environmental compliance requirements have been met 12/31/2015 12/31/2015
All administrative tasks fulfilled with timely quality products B: 119. Manage and Administer Imhaha River Steelhead Project 12/31/2015 12/31/2015
Coordinated Project C: 189. Coordinate the Imnaha Steelhead Project 12/31/2015 12/31/2015
Data Collection D: 157. Data Collection 12/31/2015 12/31/2015
Analyzed Data E: 162. Data Results 12/31/2015 12/31/2015
PIT Tagged Adult Steelhead F: 158. Pit Tagged Adult Steelhead 12/31/2015 06/19/2015
Tissue Collection G: 157. Tissue samples for DNA analysis 12/31/2015 06/19/2015
Weir & Array Installation H: 70. Install Weirs & PIT Tag Arrays 12/31/2015 06/19/2015
Disseminated Information I: 161. Communication of Results 12/31/2015 12/31/2015
Calendar year 2014 BiOp report J: 202. Submit Calendar year 2014 BiOp report and begin work on 2015 BiOp report 03/15/2015 03/15/2015
Progress Report has been published K: 132. Submit Progress Report for the period Jan 2013 - Dec 2013 03/15/2015 05/29/2015
FY14 Progress Report has been published. L: 132. Submit Progress Report for the period Jan 2014 - Dec 2014 09/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Ensure environmental compliance requirements have been met 01/01/2015
B 119 Manage and Administer Imhaha River Steelhead Project 01/01/2015
C 189 Coordinate the Imnaha Steelhead Project 01/01/2015
D 157 Data Collection 01/01/2015
E 162 Data Results 01/01/2015
F 158 Pit Tagged Adult Steelhead 01/01/2015
G 157 Tissue samples for DNA analysis 01/01/2015
H 70 Install Weirs & PIT Tag Arrays 01/01/2015
I 161 Communication of Results 01/01/2015
J 202 Submit Calendar year 2014 BiOp report and begin work on 2015 BiOp report
K 132 Submit Progress Report for the period Jan 2013 - Dec 2013 01/01/2015
L 132 Submit Progress Report for the period Jan 2014 - Dec 2014 01/01/2015
M 185 Periodic Status Reports for BPA 01/01/2015