Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67741: 2008-903-00 EXP ESA HABITAT RESTORATION
Project Number:
Title:
ESA Habitat Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
67741
Contract Title:
2008-903-00 EXP ESA HABITAT RESTORATION
Contract Continuation:
Previous: Next:
63756: 2008-903-00 EXP ESA HABITAT RESTORATION
  • 71194: 2008-903-00 EXP ESA HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
Since 2013 Geographic Review the ESA Habitat Restoration Program has retooled it's objectives to assist as a first priority; implementing habitat restoration, and additional data collection in the Yankee Fork Salmon River.  2015 will be mostly budgeted for implementing on-the-ground habitat restoration projects in Yankee Fork, remaining funds are directed at the North Fork, Panther Creek, and Upper Salmon River watersheds.  This year the ESA program will collaborate work and cost-share with various agencies, non-profit organization within the Salmon Subbasin; USFS in the Salmon-Challis South Zone, and Sawtooth National Recreation Area (SNRA); IDTeam members: Bureau of Reclamation (BOR), ID-OSC Pacific Coastal Salmon Recovery Funds (PCSRF), Trout Unlimited (TU), and private land owners.  Habitat projects to be implemented in 2015 are exclosure fence in the Upper Salmon on Pole Creek, the first phase of the West Fork Confluence on Yankee Fork reconnection with the historic channel and floodplain.  To follow up with last year's project to replace a culvert with a  bridge on Pole Creek to improve fish passage and complement the project area and a suite of habitat restoration actions we will be constructing an exclosure fence on the lower end of the property.  Last year we postponed a stream restoration project on Panther Creek by removing an abandoned diversion, remove berms, and leave a straightened channel to allow Panther Creek to flow sinuously back across and through the riparian area.  It will be completed in 2015.  Also, we are looking to complete the suite of projects on the North Fork of the Salmon River in 2015.  This next year is looking to be as challenging, fulfilling and busy as 2014.
Account Type(s):
Expense
Contract Start Date:
01/01/2015
Contract End Date:
12/31/2015
Current Contract Value:
$380,087
Expenditures:
$380,087

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jessica Buelow-IDFG Idaho Department of Fish and Game (IDFG) No Interested Party jessica.buelow@idfg.idaho.gov (208) 756-2271
Steven Campbell Shoshone-Bannock Tribes Yes Technical Contact steve.campbell@sbtribes.com (208) 236-1047
Chad Colter Shoshone-Bannock Tribes No Supervisor chad.colter@sbtribes.com (208) 239-4553
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Sammy Matsaw Shoshone-Bannock Tribes Yes Technical Contact smatsaw@sbtribes.com (208) 239-4550
Gaylene Turnage Shoshone-Bannock Tribes No Contract Manager gturnage@sbtribes.com (208) 478-3821
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821
Jacee Weed Shoshone-Bannock Tribes No Administrative Contact jacee.weed@sbtribes.com (208) 239-4551
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Provide all Environmental Compliance documents to BPA B: 165. Environmental Compliance 12/31/2015 12/31/2015
Planning, Prioritize and Selecting habitat restoration projects C: 114. Prioritize & Select Habitat Projects 12/31/2015 12/31/2015
Conference attending, presenting and communicating fisheries and indigenous science D: 99. Conference attendance and presentation 11/30/2015 09/30/2015
Pole Creek II: Upper Salmon River Exclosure Fence E: 40. Pole Creek II: Upper Salmon River Exclosure Fence 11/13/2015 11/05/2015
Panther Creek Stream Restoration F: 29. Panther Creek Stream Restoration 11/02/2015
Yankee Fork Mainstem: Jordan Creek to Eightmile Creek LWD Phase II G: 29. Yankee Fork Mainstem: Jordan Creek to Eightmile Creek LWD 10/30/2015 10/30/2015
North Fork Habitat Improvement H: 29. North Fork Habitat Improvement 11/27/2015
Yankee Fork CHaMP/AEM data collection I: 157. Yankee Fork CHaMP/AEM data collection 12/31/2015 08/27/2015
Yankee Fork CHaMP/AEM disseminate data J: 161. Yankee Fork CHaMP/AEM disseminate data 12/31/2015 12/31/2015
All administrative tasks fulfilled with timely quality products K: 119. Administer & Manage ESA Habitat 12/31/2015 12/31/2015
Progress Report has been published L: 132. Submit Progress Report for the period 1/1/2014 to 12/31/2014 03/31/2015 03/31/2015
Signs along upper Salmon River installed M: 188. Access signs on Easements 11/06/2015 11/06/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 01/01/2015
B 165 Environmental Compliance 01/01/2015
C 114 Prioritize & Select Habitat Projects 01/01/2015
D 99 Conference attendance and presentation 01/01/2015
E 40 Pole Creek II: Upper Salmon River Exclosure Fence 01/01/2015
F 29 Panther Creek Stream Restoration 01/01/2015
G 29 Yankee Fork Mainstem: Jordan Creek to Eightmile Creek LWD 01/01/2015
H 29 North Fork Habitat Improvement 07/13/2015
I 157 Yankee Fork CHaMP/AEM data collection 01/01/2015
J 161 Yankee Fork CHaMP/AEM disseminate data 01/01/2015
K 119 Administer & Manage ESA Habitat 01/01/2015
L 132 Submit Progress Report for the period 1/1/2014 to 12/31/2014 01/01/2015
M 188 Access signs on Easements 01/01/2015