Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Provide Necessary Environmental Compliance documentation for relevant projects | A: 165. Produce Environmental Compliance Documents for projects | 07/01/2015 | ||
Identify and Select Individual Projects | B: 114. Identify and develop habitat projects | 03/01/2016 | 03/01/2016 | |
Designs and Specifications and project installation oversight from NRCS on BPA projects | C: 175. NRCS Technical Engineer and Challis position | 04/30/2016 | 04/30/2016 | |
Visitation Log | D: 26. Investigate Trespass on Easement Property | 09/30/2015 | 09/30/2015 | |
Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. | E: 99. Provide Outreach and Education for Habitat Projects | 04/29/2016 | 04/29/2016 | |
Install 7 sprinkler irrigation center pivots and two pumps and pumps stations | F: 203. Install sprinkler irrigation pivots, pumps & infrastructure to ensure water conservation in Pole Crk | 11/30/2015 | 09/30/2015 | |
All administrative tasks fulfilled with timely quality products | G: 119. Routine contract actions | 04/29/2016 | 04/29/2016 | |
Attach Progress Report in Pisces | I: 132. Annual Report for the period January 2014 through April 30, 2015 | 07/30/2015 | 12/21/2015 | |
Remove Garden Creek Lower Diversion and Place Pipe to Deliver Gini Canal Irrigation Water | J: 85. Remove Garden Creek Lower Diversion Structure | 04/29/2016 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Produce Environmental Compliance Documents for projects | 01/01/2015 | ||||||
B | 114 | Identify and develop habitat projects | 01/01/2015 | ||||||
C | 175 | NRCS Technical Engineer and Challis position | |||||||
D | 26 | Investigate Trespass on Easement Property | 01/01/2015 | ||||||
E | 99 | Provide Outreach and Education for Habitat Projects | 01/01/2015 | ||||||
F | 203 | Install sprinkler irrigation pivots, pumps & infrastructure to ensure water conservation in Pole Crk | 05/01/2015 | ||||||
G | 119 | Routine contract actions | 01/01/2015 | ||||||
H | 185 | Periodic Status Reports for BPA | 01/01/2015 | ||||||
I | 132 | Annual Report for the period January 2014 through April 30, 2015 | 01/01/2015 | ||||||
J | 85 | Remove Garden Creek Lower Diversion Structure |