SOW Report
Contract 72367: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
Project Number:
Title:
Idaho Watershed Habitat Restoration-Custer District
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
72367
Contract Title:
2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
Contract Continuation:
Previous: Next:
68920: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
  • 76599: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
Problems identified in the Salmon Sub-basin Management Plan (May 2004) indicate that the Upper Salmon Watershed encompasses a total of five Chinook species populations, two steelhead populations and one sockeye population. The Upper Main-stem Salmon River from Pahsimeroi confluence to the headwaters has been altered by irrigation with-drawls. The plan addresses improved connectivity of tributaries that are intercepted or impacted by irrigation ditches.  Improvements to water deliver Pole Creek is anticipated to modify the sequence and/or timing of when the diversion operates and how much flow is taken out of the system at critical times to sustain the focal species. To follow up on the success of the previous two years contract for Pole Creek, a reconnect on Upper Pole Creek is planned in addition to completing a stock-water system to prevent livestock from using Pole Creek.  The  flows established in Pole Creek along with the associated re-hab work will extend down the length of Pole Creek through the private lands, and add substantially to another ˜8 miles of the headwater of the Salmon River, building on the many previous investments and efforts towards the same objectives.

A Garden Creek diversion is being removed and will no longer be a passage barrier on lower Garden Creek this builds on work completed previously with the City of Challis on Garden Creek and future stream enhancements on this system.

There is a need to revisit fencing contracts installed by the Custer SWCD in order to protect the previous investments by BPA. The district proposes to work with contract holders to repair areas of fence in need of repair and extend the fence contracts for longer period of time if feasible based on repair needs. This district has hired staff to assist with the management of this task and to complete monitoring inventories on these contracts to determine the level of work needed. Monitoring of fencing projects will be accomplished this year by utilizing district staff to conduct monitoring inventories and determine the need and extend of maintenance required to maintain the integrity of the structures.
Account Type(s):
Expense
Contract Start Date:
05/01/2016
Contract End Date:
07/31/2017
Current Contract Value:
$213,413
Expenditures:
$213,413

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Provide Necessary Environmental Compliance documentation for relevant projects A: 165. Produce Environmental Compliance Documents for projects 07/29/2016 07/19/2016
Designs and Specifications and project installation oversight from NRCS on BPA projects B: 175. NRCS Technical Engineer and Challis position 07/31/2017 07/31/2017
Restore and reconnect Pole Creek to it's Historic Channel in Upper Stanley C: 30. Restore/reconnect Pole Creek to historic channel in Upper Stanley 11/11/2016 10/21/2016
Install seven Stock-water tanks for the stock-water system to complete Pole Creek Restoration D: 34. Install stock-water system to complete Pole Creek Restoration 09/30/2016 08/26/2016
Plant Vegetation at Pole Creek behind riparian fence E: 47. Plant Vegetation on Pole Creek within fenced riparian area 07/31/2017
Remove Fish Passage Barrier and transport water in a pipe supplied to irrigators by the Gini Canal F: 85. Remove Garden Creek Lower Diversion Structure 04/28/2017 09/27/2016
Install Approximately 2400 feet of Jack Post and Pole Fence on Salmon River and Williams Creek H: 40. Install Fence at Rocky Mountain Ranch in Upper Stanley 06/30/2017 06/30/2017
Monitor and assist with maintenance on at least six BPA funded projects 8-10 years old. I: 186. Monitor and assist with maintenance of fence projects to maintain BPA investment 07/31/2017 07/31/2017
Visitation Log J: 26. Investigate Trespass on Easement Property 07/31/2017 07/31/2017
Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. K: 99. Provide Outreach and Education for Habitat Projects 07/31/2017 07/31/2017
Identify and Select Individual Projects L: 114. Identify and develop habitat projects 05/31/2017 07/31/2017
All administrative tasks fulfilled with timely quality products M: 119. Routine contract actions 07/31/2017 07/31/2017
Attach Progress Report in Pisces O: 132. Annual Report for the period May 1 2015 through April 30, 2016 08/05/2016 06/30/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 47 Plant Vegetation
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 114 Identify and Select Projects
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documents for projects 05/01/2016
B 175 NRCS Technical Engineer and Challis position 05/01/2016
C 30 Restore/reconnect Pole Creek to historic channel in Upper Stanley 06/02/2016
D 34 Install stock-water system to complete Pole Creek Restoration 06/06/2016
E 47 Plant Vegetation on Pole Creek within fenced riparian area 06/06/2016
F 85 Remove Garden Creek Lower Diversion Structure 08/19/2016
G 40 Install Fence near Herd Creek, in East Fork
H 40 Install Fence at Rocky Mountain Ranch in Upper Stanley 05/01/2016
I 186 Monitor and assist with maintenance of fence projects to maintain BPA investment 05/01/2016
J 26 Investigate Trespass on Easement Property 05/01/2016
K 99 Provide Outreach and Education for Habitat Projects 05/01/2016
L 114 Identify and develop habitat projects 05/01/2016
M 119 Routine contract actions 05/01/2016
N 185 Periodic Status Reports for BPA 05/01/2016
O 132 Annual Report for the period May 1 2015 through April 30, 2016 05/01/2016