Contract 71422: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS
Project Number:
Title:
Oregon Fish Screens Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
71422
Contract Title:
1993-066-00 EXP OREGON FISH SCREENS PROJECTS
Contract Continuation:
Previous: Next:
67802: 1993-066-00 CAP OREGON FISH SCREENS
  • 75338: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS
Contract Status:
Closed
Contract Description:
The project provides immediate and long-term protection for anadromous and resident fish species in the Mid-Columbia Plateau Province (Deschutes, John Day, Umatilla, and Walla Walla subbasins) and the Blue Mountain Province (Grande Ronde and Imnaha subbasins).  The project improves survival of native fish species with the implementation of fish screen and passage projects on private or publicly owned irrigation diversions, dams, culverts and habitat structures.  These projects reduce or eliminate fish loss associated with irrigation withdrawals and passage barriers.  Along with funds from BPA, the program uses cost share from PCSRF, OWEB, Oregon General Fund, and ODFW Surcharge funds for implementation.  Since 1993, the program has focused on fish screens that needed to be replaced due to the change in NOAA criteria for Salmonids in the John Day, Umatilla and Walla Walla Basins.  Over time, the program has included, in its focus, habitat connectivity as directed by the Mid-C Steelhead Plan.  The program wishes to expand into the Grand Ronde and Imnaha subbasins since BPA is now funding O&M is the same area through ODFW.  

The program will solicit a subcontractor to complete cultural resource surveys on ground disturbance projects (through the supplemental Cultural Expense Contract).  Once the subcontractor has completed all surveys for the contract year, the report will be reviewed by ODFW and then submitted to BPA for final compliance review and approval.  Work on ground disturbance projects will not begin until BPA has provided approval.
Account Type(s):
Expense
Contract Start Date:
01/01/2016
Contract End Date:
12/31/2016
Current Contract Value:
$1,058,194
Expenditures:
$1,058,194

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Elisabeth Bowers Bonneville Power Administration Yes Env. Compliance Lead ekbowers@bpa.gov (503) 230-5184
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Lisa Dexter Bonneville Power Administration No Interested Party lldexter@bpa.gov (503) 230-3893
Jan Douglas Bonneville Power Administration Yes Contracting Officer jmdouglas@bpa.gov (503) 230-4164
Alan Hansen Oregon Department of Fish and Wildlife No Administrative Contact alan.s.hansen@odfw.oregon.gov (503) 947-6134
Michael Jensen Oregon Department of Fish and Wildlife Yes Technical Contact mike.j.jensen@odfw.oregon.gov (541) 575-0561
Lisa Kingsley Oregon Department of Fish and Wildlife No Interested Party Lisa.M.Kingsley@odfw.oregon.gov (503) 947-6233
Mark Kirsch Oregon Department of Fish and Wildlife No Supervisor mark.t.kirsch@state.or.us (541) 276-2344
Eric Leitzinger Bonneville Power Administration No Interested Party ejleitzinger@bpa.gov (503) 230-3534
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Enrique Rodriguez Oregon Department of Fish and Wildlife No Interested Party enrique.g.rodriguez@state.or.us (503) 947-6159
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Kelly Stokes Oregon Department of Fish and Wildlife Yes Contract Manager kelly.s.stokes@state.or.us (541) 575-0561
Natalie Sutter Oregon Department of Fish and Wildlife No Administrative Contact natalie.d.sutter@odfw.oregon.gov (503) 947-6188
Tracy Wyllie Oregon Department of Fish and Wildlife Yes Interested Party tracy.d.wyllie@odfw.oregon.gov (541) 575-0561
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Environmental Clearance Documentation or Prepare Biological Assessment A: 165. Complete Environmental Clearance Documentation 12/31/2016 12/30/2016
Identify Projects B: 114. Project Pre-Work 12/31/2016 12/30/2016
Prepare Design & Layout C: 175. Prepare Design & Layout 12/31/2016 12/30/2016
Technical Review: Outside (FS&P) Projects in the John Day Basin D: 122. Technical Review of Screens & Passage Projects 12/31/2016 12/30/2016
Passage Improvement F: 184. Passage Improvement - #2 12/31/2016 07/22/2016
Passage Improvement J: 184. Passage Improvement - #6 12/31/2016 08/15/2016
Passage Improvement K: 184. Passage Improvement - #7 12/31/2016
Passage Improvement L: 184. Passage Improvement - #8 12/31/2016
Passage Improvement M: 184. Passage Improvement - #9 12/31/2016
Passage Improvement N: 184. Passage Improvement - #10 12/31/2016
Passage Improvement O: 84. Passage Improvement - #11 12/31/2016 08/31/2016
Passage Improvement P: 84. Passage Improvement - #12 12/31/2016 08/31/2016
Passage Improvement Q: 84. Passage Improvement - #13 12/31/2016
Passage Improvement R: 84. Passage Improvement - #14 12/31/2016
Passage Improvement S: 84. Passage Improvement - #15 12/31/2016
Install Gravity Fish Screen T: 69. Install Gravity Fish Screen - #1 12/31/2016 10/31/2016
Install Gravity Fish Screen U: 69. Install Gravity Fish Screen - #2 12/31/2016 10/31/2016
Install Gravity Fish Screen V: 69. Install Gravity Fish Screen - #3 12/31/2016 10/31/2016
Install Gravity Fish Screen W: 69. Install Gravity Fish Screen - #4 12/31/2016 09/13/2016
Install Gravity Fish Screen X: 69. Install Gravity Fish Screen - #5 12/31/2016
Install Gravity Fish Screen Y: 69. Install Gravity Fish Screen - #6 12/31/2016
Install Gravity Fish Screen Z: 69. Install Gravity Fish Screen - #7 12/31/2016 06/30/2016
Install Gravity Fish Screen AA: 69. Install Gravity Fish Screen - #8 12/31/2016 11/30/2016
Install Gravity Fish Screen AB: 69. Install Gravity Fish Screen - #9 12/31/2016 11/30/2016
Install Gravity Fish Screen AC: 69. Install Gravity Fish Screen - #10 12/31/2016
Install Pump Fish Screen AD: 69. Install Pump Fish Screen - #1 12/31/2016 06/30/2016
Install Pump Fish Screen AE: 69. Install Pump Fish Screen - #2 12/31/2016 06/30/2016
Install Pump Fish Screen AF: 69. Install Pump Fish Screen - #3 12/31/2016 06/30/2016
Install Pump Fish Screen AG: 69. Install Pump Fish Screen - #4 12/31/2016 06/30/2016
Install Pump Fish Screen AH: 69. Install Pump Fish Screen - #5 12/31/2016 08/08/2016
Install Pump Fish Screen AI: 69. Install Pump Fish Screen - #6 12/31/2016 08/08/2016
Install Pump Fish Screen AJ: 69. Install Pump Fish Screen - #7 12/31/2016 08/08/2016
Install Pump Fish Screen AK: 69. Install Pump Fish Screen - #8 12/31/2016 08/30/2016
Install Pump Fish Screen AL: 69. Install Pump Fish Screen - #9 12/31/2016 08/30/2016
Install Pump Fish Screen AM: 69. Install Pump Fish Screen - #10 12/31/2016 08/30/2016
Install Siphon/Fish Exclusion Barrier AN: 80. Install Siphon/Fish Exclusion Barrier #1 12/31/2016
Install Siphon/Fish Exclusion Barrier AO: 80. Install Siphon/Fish Exclusion Barrier #2 12/31/2016 08/31/2016
Install Siphon/Fish Exclusion Barrier AP: 80. Install Siphon/Fish Exclusion Barrier #3 12/31/2016 08/31/2016
Install Siphon/Fish Exclusion Barrier AQ: 80. Install Siphon/Fish Exclusion Barrier #4 12/31/2016
Install Siphon/Fish Exclusion Barrier (Placeholder) AR: 80. Install Siphon/Fish Exclusion Barrier #5 12/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) AS: 148. Install Water Control Structure (Headgate or Water Measuring Device) #1 12/31/2016 11/30/2016
Install Water Control Structure (Headgate or Water Measuring Device) AT: 148. Install Water Control Structure (Headgate or Water Measuring Device) #2 12/31/2016 11/30/2016
Install Water Control Structure (Headgate or Water Measuring Device) AU: 148. Install Water Control Structure (Headgate or Water Measuring Device) #3 12/31/2016 06/30/2016
Install Water Control Structure (Headgate or Water Measuring Device) AV: 148. Install Water Control Structure (Headgate or Water Measuring Device) #4 12/31/2016 08/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) AW: 148. Install Water Control Structure (Headgate or Water Measuring Device) #5 12/31/2016 10/03/2016
Install Water Control Structure (Headgate or Water Measuring Device) AX: 148. Install Water Control Structure (Headgate or Water Measuring Device) #6 12/31/2016 08/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) AY: 148. Install Water Control Structure (Headgate or Water Measuring Device) #7 12/31/2016 08/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) AZ: 148. Install Water Control Structure (Headgate or Water Measuring Device) #8 12/31/2016 08/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) BA: 148. Install Water Control Structure (Headgate or Water Measuring Device) #9 12/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) BB: 148. Install Water Control Structure (Headgate or Water Measuring Device) #10 12/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) BC: 148. Install Water Control Structure (Headgate or Water Measuring Device) #11 12/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) BD: 148. Install Water Control Structure (Headgate or Water Measuring Device) #12 12/31/2016 02/29/2016
Install Water Control Structure (Headgate or Water Measuring Device) BE: 148. Install Water Control Structure (Headgate or Water Measuring Device) #13 12/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) BF: 148. Install Water Control Structure (Headgate or Water Measuring Device) #14 12/31/2016
Install Water Control Structure (Headgate or Water Measuring Device) BG: 148. Install Water Control Structure (Headgate or Water Measuring Device) #15 12/31/2016
Instream Improvement BH: 29. Instream Improvement #1 12/31/2016
Instream Improvement BI: 29. Instream Improvement #2 12/31/2016
Instream Improvement BJ: 29. Instream Improvement #3 12/31/2016
Instream Improvement BK: 29. Instream Improvement #4 12/31/2016
Instream Improvement (Placeholder) BL: 29. Instream Improvement #5 12/31/2016
Instream Improvement BM: 29. Instream Improvement #6 12/31/2016
Instream Improvement BN: 29. Instream Improvement #7 12/31/2016
Instream Improvement BO: 29. Instream Improvement #8 12/31/2016
Instream Improvement BP: 29. Instream Improvement #9 12/31/2016
Instream Improvement BQ: 29. Instream Improvement #10 12/31/2016
Completed Annual Report BR: 132. Submit Progress Report for the Period (1/1/2015) to (12/31/2015) 07/05/2016 07/05/2016
Cultural Compliance Requirements for ESA Clearance BT: 165. Contract Cultural Resources Surveys 12/31/2016 12/30/2016
All administrative tasks fulfilled with timely quality products BU: 119. Manage & Administer Projects 12/31/2016 12/30/2016
Install Pump Fish Screen BV: 69. Install Pump Fish Screen - #11 12/31/2016
Install Pump Fish Screen BW: 69. Install Pump Fish Screen - #12 12/31/2016
Install Pump Fish Screen BX: 69. Install Pump Fish Screen - #13 12/31/2016 12/30/2016
Install Pump Fish Screen BY: 69. Install Pump Fish Screen - #14 12/31/2016 12/30/2016
Install Pump Fish Screen BZ: 69. Install Pump Fish Screen - #15 12/31/2016 10/03/2016
Install Pump Fish Screen CA: 69. Install Pump Fish Screen - #16 12/31/2016 10/31/2016
Install Pump Fish Screen CB: 69. Install Pump Fish Screen - #17 12/31/2016
Install Pump Fish Screen CC: 69. Install Pump Fish Screen - #18 12/31/2016
Install Pump Fish Screen CD: 69. Install Pump Fish Screen - #19 12/31/2016
Install Pump Fish Screen CE: 69. Install Pump Fish Screen - #20 12/31/2016 10/03/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 10 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 30 instances of WE 69 Install Fish Screen
  • 5 instances of WE 80 Install Siphon
  • 5 instances of WE 84 Remove/Install Diversion
  • 10 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 15 instances of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 10 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 30 instances of WE 69 Install Fish Screen
  • 5 instances of WE 80 Install Siphon
  • 5 instances of WE 84 Remove/Install Diversion
  • 10 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 15 instances of WE 148 Install Flow Measuring Device
Lamprey, Pacific (Entosphenus tridentata)
  • 10 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 30 instances of WE 69 Install Fish Screen
  • 5 instances of WE 80 Install Siphon
  • 5 instances of WE 84 Remove/Install Diversion
  • 10 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 15 instances of WE 148 Install Flow Measuring Device
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 122 Provide Technical Review and Recommendation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Environmental Clearance Documentation 01/01/2016
B 114 Project Pre-Work 01/01/2016
C 175 Prepare Design & Layout 01/01/2016
D 122 Technical Review of Screens & Passage Projects 01/01/2016
E 184 Passage Improvement - #1
F 184 Passage Improvement - #2 06/28/2016
G 184 Passage Improvement - #3
H 184 Passage Improvement - #4
I 184 Passage Improvement - #5
J 184 Passage Improvement - #6 07/14/2016
K 184 Passage Improvement - #7
L 184 Passage Improvement - #8
M 184 Passage Improvement - #9
N 184 Passage Improvement - #10
O 84 Passage Improvement - #11 01/01/2016
P 84 Passage Improvement - #12 01/01/2016
Q 84 Passage Improvement - #13
R 84 Passage Improvement - #14
S 84 Passage Improvement - #15
T 69 Install Gravity Fish Screen - #1 01/01/2016
U 69 Install Gravity Fish Screen - #2 01/01/2016
V 69 Install Gravity Fish Screen - #3 01/01/2016
W 69 Install Gravity Fish Screen - #4 06/27/2016
X 69 Install Gravity Fish Screen - #5
Y 69 Install Gravity Fish Screen - #6
Z 69 Install Gravity Fish Screen - #7 01/01/2016
AA 69 Install Gravity Fish Screen - #8 06/27/2016
AB 69 Install Gravity Fish Screen - #9 06/28/2016
AC 69 Install Gravity Fish Screen - #10
AD 69 Install Pump Fish Screen - #1 06/27/2016
AE 69 Install Pump Fish Screen - #2 06/27/2016
AF 69 Install Pump Fish Screen - #3 06/27/2016
AG 69 Install Pump Fish Screen - #4 06/27/2016
AH 69 Install Pump Fish Screen - #5 06/27/2016
AI 69 Install Pump Fish Screen - #6 06/27/2016
AJ 69 Install Pump Fish Screen - #7 06/27/2016
AK 69 Install Pump Fish Screen - #8 06/28/2016
AL 69 Install Pump Fish Screen - #9 06/28/2016
AM 69 Install Pump Fish Screen - #10 06/28/2016
AN 80 Install Siphon/Fish Exclusion Barrier #1
AO 80 Install Siphon/Fish Exclusion Barrier #2 06/30/2016
AP 80 Install Siphon/Fish Exclusion Barrier #3 07/06/2016
AQ 80 Install Siphon/Fish Exclusion Barrier #4
AR 80 Install Siphon/Fish Exclusion Barrier #5
AS 148 Install Water Control Structure (Headgate or Water Measuring Device) #1 06/27/2016
AT 148 Install Water Control Structure (Headgate or Water Measuring Device) #2 06/27/2016
AU 148 Install Water Control Structure (Headgate or Water Measuring Device) #3 06/28/2016
AV 148 Install Water Control Structure (Headgate or Water Measuring Device) #4 06/28/2016
AW 148 Install Water Control Structure (Headgate or Water Measuring Device) #5 06/18/2716
AX 148 Install Water Control Structure (Headgate or Water Measuring Device) #6 06/27/2016
AY 148 Install Water Control Structure (Headgate or Water Measuring Device) #7 06/27/2016
AZ 148 Install Water Control Structure (Headgate or Water Measuring Device) #8 06/27/2016
BA 148 Install Water Control Structure (Headgate or Water Measuring Device) #9 06/27/2016
BB 148 Install Water Control Structure (Headgate or Water Measuring Device) #10 06/27/2016
BC 148 Install Water Control Structure (Headgate or Water Measuring Device) #11 06/27/2016
BD 148 Install Water Control Structure (Headgate or Water Measuring Device) #12 01/01/2016
BE 148 Install Water Control Structure (Headgate or Water Measuring Device) #13
BF 148 Install Water Control Structure (Headgate or Water Measuring Device) #14
BG 148 Install Water Control Structure (Headgate or Water Measuring Device) #15
BH 29 Instream Improvement #1
BI 29 Instream Improvement #2
BJ 29 Instream Improvement #3
BK 29 Instream Improvement #4
BL 29 Instream Improvement #5
BM 29 Instream Improvement #6
BN 29 Instream Improvement #7
BO 29 Instream Improvement #8
BP 29 Instream Improvement #9
BQ 29 Instream Improvement #10
BR 132 Submit Progress Report for the Period (1/1/2015) to (12/31/2015) 01/01/2016
BS 185 Periodic Status Reports for BPA 01/01/2016
BT 165 Contract Cultural Resources Surveys 01/01/2016
BU 119 Manage & Administer Projects 01/01/2016
BV 69 Install Pump Fish Screen - #11 12/22/2016
BW 69 Install Pump Fish Screen - #12 12/22/2016
BX 69 Install Pump Fish Screen - #13 12/22/2016
BY 69 Install Pump Fish Screen - #14 12/22/2016
BZ 69 Install Pump Fish Screen - #15 06/28/2016
CA 69 Install Pump Fish Screen - #16 06/28/2016
CB 69 Install Pump Fish Screen - #17 06/28/2016
CC 69 Install Pump Fish Screen - #18 06/28/2016
CD 69 Install Pump Fish Screen - #19 06/28/2016
CE 69 Install Pump Fish Screen - #20 06/28/2016