Province | Subbasin | % |
---|---|---|
Columbia Plateau | John Day | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance | A: 165. Obtain NEPA Compliance | 03/31/2017 | 03/31/2017 | |
Final Design for Phase 5 | B: 175. Coordinate with Reclamation on Completion of Design and Plans for Phase 5 | 12/30/2016 | 06/30/2016 | |
Information Sign Updating, Access Regulation, Hunting Program | C: 188. Provide Access, Signs, and Adequate Roads | 03/31/2017 | 03/31/2017 | |
Project Outreach and Opportunities, Information Distribution | D: 99. Public Access and Volunteer Coordination | 03/31/2017 | 03/31/2017 | |
Facility Maintenance | E: 186. Maintain Facilities and Structures throughout the Property | 03/31/2017 | 03/31/2017 | |
Property Patrol | F: 26. Property Patrol | 03/31/2017 | 03/31/2017 | |
Establish Vegetation | G: 47. Plant Seed and Locally Collected Cuttings | 12/16/2016 | 12/16/2016 | |
Completed Grazing Season | H: 92. Grazing Program Oversight and Management | 03/31/2017 | 03/31/2017 | |
Fish, Habitat, Temperature, Weather and Flow Data | I: 157. Steelhead Redd Counts | 03/31/2017 | 03/01/2017 | |
Fish Data | J: 157. Juvenile Fish Count Surveys | 03/31/2017 | 03/01/2017 | |
Weather Data | K: 157. Weather Data Management | 03/31/2017 | 03/01/2017 | |
Stream Temperature Data | L: 157. Stream Temperature Monitoring | 03/31/2017 | 03/01/2017 | |
Irrigation Data | M: 157. Irrigation Monitoring | 03/31/2017 | 03/31/2017 | |
Oxbow Tailings Monitoring and Maintenance Plan Data | N: 157. Tailings Project Monitoring and Maintenance Plan Work | 03/31/2017 | 03/01/2017 | |
Data Synthesis for Report and Storage of Data with Appropriate Metadata | O: 162. Oxbow Conservation Area fish and Environmental Conditions Data Analysis | 11/01/2016 | ||
Photo for 2016 | P: 115. Photopoint Inventory | 03/31/2017 | 03/01/2017 | |
Conduct Steelhead and Chinook Redd Surveys with ODFW | Q: 191. Conduct Steelhead and Chinook Redd Surveys with ODFW | 09/30/2016 | 09/30/2016 | |
Property Noxious Weed Control Activities | R: 199. Property Noxious Weed Control Activities | 10/28/2016 | 10/28/2016 | |
Complete Phase 4 and 5 Tailings Remediation | S: 30. Complete a Portion of Phase 4 and all of Phase 5 Tailings Remediation | 10/28/2016 | 10/28/2016 | |
Coordination and Monitoring Efforts for the Middle Fork John Day IMW Group | T: 191. Coordination and Monitoring Efforts for the Middle Fork John Day IMW Group | 03/31/2017 | 03/01/2017 | |
Protect and Maintain Riparian Vegetation | U: 198. Protect Riparian Vegetation | 12/30/2016 | 11/30/2016 | |
Completed Annual Report | V: 132. Submit Progress Report for the Period (April 2015) to (March 2016) | 03/31/2017 | 03/31/2017 | |
Project Management | X: 119. Manage and Administer Tribal Projects and BPA Activities | 03/31/2017 | 03/31/2017 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Interior Redband (O. mykiss gairdnerii) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain NEPA Compliance | 04/01/2016 | ||||||
B | 175 | Coordinate with Reclamation on Completion of Design and Plans for Phase 5 | 04/01/2016 | ||||||
C | 188 | Provide Access, Signs, and Adequate Roads | 06/15/2016 | ||||||
D | 99 | Public Access and Volunteer Coordination | 04/01/2016 | ||||||
E | 186 | Maintain Facilities and Structures throughout the Property | 04/01/2016 | ||||||
F | 26 | Property Patrol | 04/01/2016 | ||||||
G | 47 | Plant Seed and Locally Collected Cuttings | 06/16/2016 | ||||||
H | 92 | Grazing Program Oversight and Management | 04/01/2016 | ||||||
I | 157 | Steelhead Redd Counts | 04/01/2016 | ||||||
J | 157 | Juvenile Fish Count Surveys | 04/01/2016 | ||||||
K | 157 | Weather Data Management | 04/01/2016 | ||||||
L | 157 | Stream Temperature Monitoring | 04/01/2016 | ||||||
M | 157 | Irrigation Monitoring | 04/01/2016 | ||||||
N | 157 | Tailings Project Monitoring and Maintenance Plan Work | 04/01/2016 | ||||||
O | 162 | Oxbow Conservation Area fish and Environmental Conditions Data Analysis | 04/01/2016 | ||||||
P | 115 | Photopoint Inventory | 04/01/2016 | ||||||
Q | 191 | Conduct Steelhead and Chinook Redd Surveys with ODFW | 04/01/2016 | ||||||
R | 199 | Property Noxious Weed Control Activities | 06/16/2016 | ||||||
S | 30 | Complete a Portion of Phase 4 and all of Phase 5 Tailings Remediation | 06/15/2016 | ||||||
T | 191 | Coordination and Monitoring Efforts for the Middle Fork John Day IMW Group | 04/01/2016 | ||||||
U | 198 | Protect Riparian Vegetation | 04/01/2016 | ||||||
V | 132 | Submit Progress Report for the Period (April 2015) to (March 2016) | 04/01/2016 | ||||||
W | 185 | Periodic Status Reports for BPA | 04/01/2016 | ||||||
X | 119 | Manage and Administer Tribal Projects and BPA Activities | 04/01/2016 |