Province | Subbasin | % |
---|---|---|
Columbia Cascade | Okanogan | 100.00% |
Previous: | Next: |
---|---|
69004: 2007-224-00 EXP CCT METHOW RESTORATION |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Documentation | A: 165. EC Compliance Documentation | 06/30/2017 | 06/30/2017 | |
All administrative tasks fulfilled with timely quality products | B: 119. Project Management | 06/30/2017 | 06/30/2017 | |
Watershed coordination | C: 191. Methow Subbasin Coordination | 06/30/2017 | 06/30/2017 | |
Projects selected for implementation | D: 114. Project Identification and Selection Process | 06/30/2017 | 06/30/2017 | |
Completed channel construction | E: 30. Silver Side Channel | 12/31/2016 | 09/05/2016 | |
Beavers relocated to the Methow basin | F: 190. Beaver Relocation Project | 06/30/2017 | 06/30/2017 | |
Restoration site trail loop and informational signage | H: 188. M2 Trail Loop Signage | 06/30/2017 | 06/30/2017 | |
Initial assessment to determine stability of wetlands for potential off channel rearing habitat. | I: 115. Gann Wetland Assessment | 06/30/2017 | 06/30/2017 | |
Completed Annual Report | M: 132. Submit Progress Report for the period 7/1/15 to 6/30/16 | 01/16/2017 | 12/21/2016 | |
Thermosink Livestock Watering Trough | N: 34. Lawson Thermosink Watering Trough | 04/30/2017 | 05/10/2017 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | EC Compliance Documentation | 07/01/2016 | ||||||
B | 119 | Project Management | 07/01/2016 | ||||||
C | 191 | Methow Subbasin Coordination | 07/01/2016 | ||||||
D | 114 | Project Identification and Selection Process | 07/01/2016 | ||||||
E | 30 | Silver Side Channel | 07/11/2016 | ||||||
F | 190 | Beaver Relocation Project | 07/01/2016 | ||||||
G | 82 | Aspen Meadows Production Well | |||||||
H | 188 | M2 Trail Loop Signage | 11/30/2016 | ||||||
I | 115 | Gann Wetland Assessment | 12/06/2016 | ||||||
J | 184 | Maltais Roughened Channel | |||||||
K | 175 | Silver Reach Instream Enhancements Phase 1 | |||||||
L | 185 | Periodic Status Reports for BPA | 07/01/2016 | ||||||
M | 132 | Submit Progress Report for the period 7/1/15 to 6/30/16 | 07/01/2016 | ||||||
N | 34 | Lawson Thermosink Watering Trough | 07/01/2016 | ||||||
O | 82 | Redshirt Ditch Production Well | |||||||
P | 175 | Burns Garrity Floodplain Restoration Design | |||||||
Q | 203 | Barkley Irrigation System Improvements |