Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73354 REL 109: 2008-524-00 EXP IMPLEMENT TRIBAL PACIFIC LAMPREY RESTORATION
Project Number:
Title:
Implement Tribal Pacific Lamprey Restoration Plan
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
73354 REL 109
Contract Title:
2008-524-00 EXP IMPLEMENT TRIBAL PACIFIC LAMPREY RESTORATION
Contract Continuation:
Previous: Next:
73354 REL 92: 2008-524-00 EXP IMPLEMENT TRIBAL PACIFIC LAMPREY RESTORATION
  • CR-375354: 2008-524-00 EXP IMPLEMENT TRIBAL PACIFIC LAMPREY RESTORATION
Contract Status:
Issued
Contract Description:
This contract is directed toward implementing the objectives and actions outlined in the Tribal Pacific Lamprey Restoration Plan. These objectives include 1) Improve Lamprey mainstem passage, survival, and habitat; 2) improve tributary passage and identify, protect, and restore tributary habitat; 3) Supplement/Augment lamprey populations by reintroduction and translocation of adults and juveniles into areas where they are severely depressed or extirpated; 4)  Evaluate and reduce contaminant accumulation and improve water quality for lamprey in all life stages; 5)  Establish and implement a coordinated regional lamprey outreach and education program within the region; 6) Conduct research, monitoring and evaluation of lamprey at all life history stages.
Account Type(s):
Expense
Contract Start Date:
05/01/2024
Contract End Date:
04/30/2025
Current Contract Value:
$1,286,069
Expenditures:
$707,785

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Applicable permits and other environmental clearances received A: 165. Obtain Environmental Clearance - NEPA, ESA, etc. 04/30/2025
An accessible, error-checked data set with metadata B: 162. Use a multifunctional SNPs panel for genetic monitoring of CRB lamprey species 04/30/2025
Produce accessible, error-checked datasets C: 157. Genetic monitoring of CRB lamprey species - adult lamprey tissue collection 04/30/2025
Produce accessible, error-checked datasets D: 157. Genetic monitoring of CRB lamprey species - pre-adult lamprey tissue collection 04/30/2025
Produce accessible, error-checked datasets E: 157. Determining the presence/absence of Pacific lamprey in the Snake River Basin 04/30/2025
Record Fish collection numbers and locations collected F: 66. Facilitate the collection of adult lamprey from the Columbia River 04/30/2025
Operational G: 61. Maintenance and Repairs 04/30/2025
Deliverable: An accessible, error-checked data set with metadata H: 162. Assess emerging and legacy contaminants in Pacific lamprey in the CRB, etc opportunistic sampling of existing samples (e.g. larval/juvenile/adult mortalites collected at mainstem dams, etc.) 04/30/2025
Deliverable: An accessible, error-checked data set with metadata I: 162. Utilizing existing datasets to address critical uncertainties 04/30/2025
Document Regional Coordination and facilitation J: 189. Regional coordination with CRITFC member tribes regarding Pacific lamprey 04/30/2025
Document regional coordination in the annual report K: 189. Regional coordination of matters concerning Pacific lamprey 04/30/2025
Document Outreach and education materials developed L: 99. Outreach and education regarding Pacific lamprey to regional agencies and schools 04/30/2025
Produce Plans and Finalize with Tribal and regional coordination M: 174. Development of tribal and regional coordination, collaboration, and planning documents 04/30/2025
Effective implementation management and timely contract administration N: 119. FY24 contract and budget management, FY25 contract package prep 04/30/2025
Completed Progress (Annual) Report O: 132. Submit Progress Report for the period 1/1/2023 to 12/31/2023 04/30/2025
Completed Progress (Annual) Report P: 132. Submit Progress Report for the period 1/1/2024 to 12/31/2024 04/30/2025

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Environmental Clearance - NEPA, ESA, etc.
B 162 Use a multifunctional SNPs panel for genetic monitoring of CRB lamprey species
C 157 Genetic monitoring of CRB lamprey species - adult lamprey tissue collection 06/27/2024
D 157 Genetic monitoring of CRB lamprey species - pre-adult lamprey tissue collection 06/27/2024
E 157 Determining the presence/absence of Pacific lamprey in the Snake River Basin 09/19/2023
F 66 Facilitate the collection of adult lamprey from the Columbia River 06/27/2024
G 61 Maintenance and Repairs 06/27/2024
H 162 Assess emerging and legacy contaminants in Pacific lamprey in the CRB, etc opportunistic sampling of existing samples (e.g. larval/juvenile/adult mortalites collected at mainstem dams, etc.)
I 162 Utilizing existing datasets to address critical uncertainties
J 189 Regional coordination with CRITFC member tribes regarding Pacific lamprey
K 189 Regional coordination of matters concerning Pacific lamprey
L 99 Outreach and education regarding Pacific lamprey to regional agencies and schools
M 174 Development of tribal and regional coordination, collaboration, and planning documents 06/27/2024
N 119 FY24 contract and budget management, FY25 contract package prep
O 132 Submit Progress Report for the period 1/1/2023 to 12/31/2023
P 132 Submit Progress Report for the period 1/1/2024 to 12/31/2024
Q 185 Periodic Status Reports for BPA