Province | Subbasin | % |
---|---|---|
Columbia Plateau | Snake Lower | 100.00% |
Previous: | Next: |
---|---|
73354 REL 7: 2007-401-00 EXP BIOP KELT RECONDITION/REPRODUCTIVE SUCCESS 2018 |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Coverage Documents | A: 165. Produce Environmental compliance document for kelt activities | 06/30/2020 | 06/29/2020 | |
Collection of kelt steelhead | B: 66. Collect, hold, and transport kelt steelhead for experiments | 06/30/2020 | 06/29/2020 | |
Biological data collection on adult steelhead | C: 157. Collect biological data and tissue for genotyping from adult steelhead | 06/30/2020 | 06/29/2020 | |
PIT tagging adult steelhead | D: 158. PIT tag adult steelhead at collection sites | 06/30/2020 | 06/29/2020 | |
Recondition & Rear steelhead kelts | E: 176. Recondition kelt steelhead for long term treatments | 06/30/2020 | 06/29/2020 | |
Collection of biological data from reared fish | F: 157. Collect survival, condition, and rematuration data on reared kelt steelhead | 06/30/2020 | 06/29/2020 | |
Data analysis | G: 162. Analyze kelt steelhead post rearing data | 06/30/2020 | 06/29/2020 | |
Generate Genotypic data | H: 157. Genotype tissue samples from adult and kelt steelhead, and from resident O. mykiss | 06/30/2020 | 06/29/2020 | |
Conduct genetic analysis | I: 162. Conduct parentage assignments, and stock identification from genetic data | 06/30/2020 | 06/29/2020 | |
Implement Snake River Kelt Reconditioning Research Plan | J: 157. Implement Snake River Kelt Reconditioning Plan | 06/30/2020 | 06/29/2020 | |
Compete the 3 step process for a Snake River Kelt Reconditioning Facility | K: 196. Complete 3 Step Process for a Snake River Kelt Reconditioning Facility | 06/30/2020 | 06/29/2020 | |
Produce Presentations | L: 161. Present findings with presentations | 06/30/2020 | 06/29/2020 | |
Work toward submitting a peer-reviewed journal article | M: 183. Work toward submitting a peer-reviewed journal article | 06/30/2020 | 06/29/2020 | |
Attach Hatchery Reconditioning Plan | N: 174. Hatchery Reconditiong Plan | 06/30/2020 | 06/29/2020 | |
Effective implementation management and timely contract administration | O: 119. Manage project and subcontracts for kelt project | 06/30/2020 | 06/29/2020 | |
Completed Annual Report | P: 132. Submit 2019 Annual Report for January 2019 to December 2019 | 03/16/2020 | 03/13/2020 |
Primary Focal Species | Work Statement Elements |
---|---|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Produce Environmental compliance document for kelt activities | 07/01/2019 | ||||||
B | 66 | Collect, hold, and transport kelt steelhead for experiments | 02/19/2019 | ||||||
C | 157 | Collect biological data and tissue for genotyping from adult steelhead | 02/19/2019 | ||||||
D | 158 | PIT tag adult steelhead at collection sites | 02/19/2019 | ||||||
E | 176 | Recondition kelt steelhead for long term treatments | 02/19/2019 | ||||||
F | 157 | Collect survival, condition, and rematuration data on reared kelt steelhead | |||||||
G | 162 | Analyze kelt steelhead post rearing data | 07/01/2019 | ||||||
H | 157 | Genotype tissue samples from adult and kelt steelhead, and from resident O. mykiss | 02/19/2019 | ||||||
I | 162 | Conduct parentage assignments, and stock identification from genetic data | 07/01/2019 | ||||||
J | 157 | Implement Snake River Kelt Reconditioning Plan | 02/19/2019 | ||||||
K | 196 | Complete 3 Step Process for a Snake River Kelt Reconditioning Facility | |||||||
L | 161 | Present findings with presentations | 07/01/2019 | ||||||
M | 183 | Work toward submitting a peer-reviewed journal article | 07/01/2019 | ||||||
N | 174 | Hatchery Reconditiong Plan | 07/01/2019 | ||||||
O | 119 | Manage project and subcontracts for kelt project | 07/01/2019 | ||||||
P | 132 | Submit 2019 Annual Report for January 2019 to December 2019 | 07/01/2019 | ||||||
Q | 202 | BiOp RPA Report for CY 2019 | |||||||
R | 185 | Periodic Status Reports for BPA | 07/01/2019 |