Contract 73354 REL 75: 2008-503-00 EXP STUDIES LIMITING OKAN/WENAT SOCKEYE
Project Number:
Title:
Studies into Factors Limiting the Abundance of Okanagan and Wenatchee Sockeye Salmon
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 1.00%
Methow 1.00%
Okanogan 49.00%
Wenatchee 49.00%
Contract Number:
73354 REL 75
Contract Title:
2008-503-00 EXP STUDIES LIMITING OKAN/WENAT SOCKEYE
Contract Continuation:
Previous: Next:
73354 REL 59: 2008-503-00 EXP STUDIES LIMITING OKAN/WEN SOCKEYE
Contract Status:
Issued
Contract Description:
This project, managed by the Columbia River Inter-Tribal Fish Commission (CRITFC), seeks to expand knowledge of the factors limiting production of Okanogan and Wenatchee sockeye salmon (Oncorhynchus nerka) stocks.

This contract covers CRITFC’s management and oversight of the following activities:
1. PIT tagging of adult and juvenile sockeye salmon;
2. Collection and analysis of PIT tag detection data for adult and juvenile sockeye salmon (Okanagan basin);
3. Maintenance of, and improvement to, PIT tagging infrastructure as needed in Okanagan Basin (ZSL, OKC, OKM, SKA, and OKP);
4. Acoustic trawl surveys (ATS) and comparison of ATS data data in Lake Wenatchee (Osoyoos/Skaha data is collected by the ONA using other funding);
5. Monthly collection of water chemistry and limnology data in Lake Wenatchee (Osoyoos/Skaha data is collected by the ONA using other funding);
6. Collection of sockeye and/or kokanee juvenile samples in Lake Wenatchee (Osoyoos/Skaha data is collected by the ONA using other funding);
7. Trial operation of a PIT barge;
8. Collection of data on substrate available for shorespawning sockeye within Okanagan Lake; and
9. Subsequent reporting and data dissemination.

CRITFC subcontracts with multiple governmental partners to complete work elements described in this contract:
Yakama Nation (YN) -- C, D, G
Okanagan Nation Alliance (ONA) -- C, E, F, G, H, I, J, K, L, M
Biomark or other qualified contractor (through ONA subcontract) – F

PROJECT BACKGROUND:
Two stocks of sockeye salmon in the Upper Columbia River Basin are studied in this project: Okanagan and Wenatchee sockeye. Significant PIT tagging infrastructure has been funded and maintained through this project to improve understanding of adult sockeye migration and mortality, including PIT tag antenna arrays at Zosel (ZSL), McIntyre, and Skaha (SKA) dams, as well as an instream arrays at Okanagan Channel (OKC) and Penticton Channel (OKP).  Zosel Dam, located immediately downstream of Osoyoos Lake, is a key site for both the upstream and downstream migration of Okanagan Basin Sockeye Salmon. This project has funded PIT tag detection in fish ladders as well as two floating antennas at the dam. Detection of upstream migrating Sockeye through the ladders is nearly 100%, however in years of high flow, most Sockeye use the spillways and thus pass Zosel Dam undetected. In 2021, additional antennas were installed across the concrete apron in the spill bay downstream of Zosel Dam. It is expected that PIT-tagged Sockeye passing along the river bottom will be detected by these antennas, providing sufficient detections to estimate survival and migration timing in years of high flows.

For Okanagan sockeye, a primary factor affecting the stock is survival upstream of Wells Dam. To quantify mortality, this project has historically funded PIT and acoustic tagging of sockeye salmon at Wells Dam. Additional PIT tagging has occurred at Bonneville Dam as part of CRITFC’s Upstream Migration Timing Accords project (#2009-518-00). Mortality is partitioned by reach upstream of Wells Dam. The intent is to be able to correlate survival with river and lake conditions, hopefully allowing survival to be increased through better Okanagan River management. Additionally, better flow management techniques may optimize adult survival.

This project has continued to PIT tag adults at Wells Dam in order to augment the number of PIT tagged sockeye in the Okanagan Basin used for estimating survival through the established PIT tag network. The PIT tag network developed as part of this project has also improved data on steelhead and Chinook use of the Canadian portion of the Okanagan Basin. Acoustic tagging has also been used to determine survival to the North Basin of Osoyoos Lake, which is a cold water refuge for migrating sockeye salmon.  Acoustic tagging was discontinued in 2015 due to its expense, and the PIT tag network (largely funded by this project) keeps improving.

This project also annually supports PIT tagging of juvenile Okanagan sockeye to assess downstream mortality of these fish through the Okanagan River and the Columbia River Basin hydrosystem.  Additional funding for the PIT tagging is provided by the Fish Passage Center through the Comparative Survival Study (CSS), Department of Fisheries and Oceans Canada (DFO), and Grant and Chelan PUDs. In 2020, the use of a PIT Tag barge will be tested to detect juvenile sockeye in the vicinity of the Osoyoos Narrows. The PIT barge is owned and operated by project subcontractor Okanagan Nation Alliance (ONA).

For Wenatchee sockeye, this project has sought to standardize smolt abundance estimation methodologies by conducting annual hydroacoustic surveys of Lake Wenatchee. The data from these surveys is compared with Okanagan smolt abundance data collected in Osoyoos and Skaha Lakes. Costs of the Wenatchee acoustic surveys are shared with the DFO, while Osoyoos and Skaha lake surveys are funded by DFO, ONA, and Grant and Chelan PUDs.    
Account Type(s):
Expense
Contract Start Date:
05/01/2022
Contract End Date:
03/31/2023
Current Contract Value:
$244,721
Expenditures:
$159,014

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Richard Bussanich Okanagan Nation Alliance No Interested Party rbussanich@syilx.org (250) 490-9779
Skyeler Folks Okanagan Nation Alliance No Interested Party sfolks@syilx.org (250) 490-9779
Jeffrey Fryer Columbia River Inter-Tribal Fish Commission (CRITFC) Yes Contract Manager fryj@critfc.org (503) 731-1266
Christine Golightly Columbia River Inter-Tribal Fish Commission (CRITFC) No Administrative Contact golc@critfc.org (503) 731-1288
Bonnie Greeninger Bonneville Power Administration Yes Contracting Officer begreeninger@bpa.gov (360) 601-5500
Douglas Hatch Columbia River Inter-Tribal Fish Commission (CRITFC) No Supervisor hatd@critfc.org (503) 731-1263
Denise Kelsey Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party keld@critfc.org (503) 731-1280
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Christine Petersen Bonneville Power Administration No Interested Party chpetersen@bpa.gov (503) 230-4695
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Chris Roe Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party chris.roe@critfc.org (503) 731-1274
Dan Selbie Department of Fisheries and Oceans Canada No Interested Party daniel.selbie@dfo-mpo.gc.ca (604) 824-4702
Carley Simpson Okanagan Nation Alliance No Interested Party csimpson@syilx.org (250) 490-9779
John Whiteaker Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party whij@critfc.org (503) 238-3562
Nick Yaniw Okanagan Nation Alliance No Interested Party nyaniw@syilx.org (250) 450-9779


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Project administration 03/31/2023 03/28/2023
Environmental compliance complete C: 165. Complete environmental compliance requirements 03/31/2023 03/28/2023
Wells Dam PIT tagging complete D: 158. Tag adult sockeye salmon at Wells Dam [alternatively at Priest Rapids Dam] 12/31/2022 12/31/2022
PIT Tag approximately 10,000 juvenile Sockeye salmon E: 158. PIT tag juvenile Osoyoos and Skaha Lake sockeye salmon 03/31/2023 03/28/2023
Produce accessible, error-checked datasets F: 157. Collect PIT tag detection data from Accords project funded sites (OKC, OKP, SKA, ZSL, McIntyre) 03/31/2023 03/28/2023
Produce accessible, error-checked datasets G: 157. Conduct acoustic trawl surveys and collect limnology data and nerka samples 03/31/2023 03/28/2023
Produce accessible, error-checked datasets H: 157. Trial Operation of PIT barge for juvenile outmigration detection 03/31/2023 03/28/2023
Produce accessible, error-checked datasets I: 157. Collect data on substrate available for shorespawning sockeye within Okanagan Lake and salmon redds in the area. 03/31/2023
Deliverable: An accessible, error-checked data set with metadata J: 162. Adult Sockeye migration mortality and timing (PIT tag data) 03/31/2023 03/28/2023
Deliverable: An accessible, error-checked data set with metadata K: 162. Compare Wenatchee and Osoyoos Lake ATS and limnology data 03/31/2023 03/28/2023
Deliverable: An accessible, error-checked data set with metadata L: 162. Analyze juvenile PIT tag data 03/31/2023 03/28/2023
Report results M: 161. Share project information 03/31/2023 03/28/2023
2021 Technical Report N: 132. Submit Progress Report for data collected January 2021 to December 2021 03/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Sockeye (O. nerka) - Lake Wenatchee ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Sockeye (O. nerka) - Okanogan River ESU
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 162 Analyze/Interpret Data
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Project administration
C 165 Complete environmental compliance requirements
D 158 Tag adult sockeye salmon at Wells Dam [alternatively at Priest Rapids Dam] 05/01/2022
E 158 PIT tag juvenile Osoyoos and Skaha Lake sockeye salmon 05/01/2022
F 157 Collect PIT tag detection data from Accords project funded sites (OKC, OKP, SKA, ZSL, McIntyre) 05/01/2022
G 157 Conduct acoustic trawl surveys and collect limnology data and nerka samples 05/01/2022
H 157 Trial Operation of PIT barge for juvenile outmigration detection 05/01/2022
I 157 Collect data on substrate available for shorespawning sockeye within Okanagan Lake and salmon redds in the area. 05/01/2022
J 162 Adult Sockeye migration mortality and timing (PIT tag data)
K 162 Compare Wenatchee and Osoyoos Lake ATS and limnology data
L 162 Analyze juvenile PIT tag data
M 161 Share project information
N 132 Submit Progress Report for data collected January 2021 to December 2021