Province | Subbasin | % |
---|---|---|
Intermountain | Columbia Upper | 100.00% |
Previous: | Next: |
---|---|
73548 REL 80: 2008-115-00 EXP LAKE ROOSEVELT BURBOT POPULATION ASSESSMENT |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental compliance | A: 165. Produce Environmental Compliance Documentation | 02/28/2022 | 02/28/2022 | |
Produce accessible, error-checked datasets | B: 157. Assist with Fall Walleye Index Netting on Lake Roosevelt | 02/28/2022 | 02/28/2022 | |
2020 FWIN burbot data set formatted for analysis | C: 159. Acquire 2020 Fall Walleye Indexing Netting (FWIN) data from Co-managers and format | 05/31/2021 | 05/31/2021 | |
Produce accessible, error-checked datasets | D: 157. Age Lake Roosevelt Burbot | 04/30/2021 | 04/30/2021 | |
Results of FWIN Burbot data analysis to monitor status and trends in Burbot population metrics | E: 162. Analyze 2020 FWIN Burbot data | 02/28/2022 | ||
Produce accessible, error-checked datasets | F: 157. Identify Burbot tributary spawning locations | 02/28/2022 | 02/28/2022 | |
Produce accessible, error-checked datasets | G: 157. Identify Burbot reservoir spawning locations | 02/28/2022 | 02/28/2022 | |
Pelagic Burbot larvae data set | H: 157. Pelagic Burbot larvae sampling | 02/28/2022 | 02/28/2022 | |
Raw hydrographic data set | I: 157. Conduct hydrographic survey in Lake Roosevelt to map benthic habitat | 02/28/2022 | ||
Benthic habitat map for Lake Roosevelt | J: 162. Analyze hydrographic survey data to develop sediment facies map of Lake Roosevelt | 02/28/2022 | ||
Funding Package Submitted | K: 119. Manage & Administer the Lake Roosevelt Burbot Population Assessment Project | 02/28/2022 | 02/28/2022 | |
Completed Annual Report | L: 132. Submit Progress Report for the period (Jan 2020) to (Dec 2020) | 04/15/2021 | 07/01/2021 |
Primary Focal Species | Work Statement Elements |
---|---|
Burbot (Lota lota) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Produce Environmental Compliance Documentation | |||||||
B | 157 | Assist with Fall Walleye Index Netting on Lake Roosevelt | 01/12/2021 | ||||||
C | 159 | Acquire 2020 Fall Walleye Indexing Netting (FWIN) data from Co-managers and format | |||||||
D | 157 | Age Lake Roosevelt Burbot | 01/12/2021 | ||||||
E | 162 | Analyze 2020 FWIN Burbot data | |||||||
F | 157 | Identify Burbot tributary spawning locations | 01/12/2021 | ||||||
G | 157 | Identify Burbot reservoir spawning locations | 01/12/2021 | ||||||
H | 157 | Pelagic Burbot larvae sampling | 01/12/2021 | ||||||
I | 157 | Conduct hydrographic survey in Lake Roosevelt to map benthic habitat | 01/12/2021 | ||||||
J | 162 | Analyze hydrographic survey data to develop sediment facies map of Lake Roosevelt | |||||||
K | 119 | Manage & Administer the Lake Roosevelt Burbot Population Assessment Project | |||||||
L | 132 | Submit Progress Report for the period (Jan 2020) to (Dec 2020) | |||||||
M | 132 | Draft Progress Report for the period (Jan 2021) to (Dec 2021) | |||||||
N | 185 | Periodic Status Reports for BPA |