Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73548 REL 14: 1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Project Number:
Title:
Restore Salmon Creek Anadromous Fish
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
73548 REL 14
Contract Title:
1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Contract Continuation:
Previous: Next:
73255: 1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
  • 73548 REL 35: 1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Contract Status:
Closed
Contract Description:
Since 1910, water from Salmon Creek has been stored in Conconully Reservoir, which is delivered to agricultural fields within the Okanogan Irrigation District, via ~ 12 miles of Salmon Creek.  In addition,  the North Fork of Salmon Creek is diverted into Salmon Lake, an off-channel storage reservoir, via a feeder canal.  Water is then released from Salmon Lake to augment storage of Conconully Reservoir.   Both reservoirs are near the town of Conconully, about 17 miles northwest of Okanogan. Two pumping plants supplement the water supply during water-short years.  Shell Rock Pump Station lifts water from the Okanogan River, and Duck Lake Pumping Plant withdraws water from Duck Lake.

Salmon Creek, a tributary to the Okanogan River, is considered to be one of the most significant opportunities to restore summer steelhead in the Okanogan Basin.  This project reconnects the Okanogan River with approximately 11 miles of habitat conducive for spawning and rearing of summer steelhead.  During controlled water releases in 2003, approximately 25 cfs was required for fish migration downstream of the diversion dam.  During 2008 a "low-flow" channel was constructed downstream of the diversion dam which provided suitable fish passage conditions at approximately 10 cfs.  The low flow channel extended the duration of water available through a 12-year water lease program.  During 2011, uncontrolled spill exceeded 500 cfs resulting in an undistinguishable low flow channel.  The low flow channel was re-established after the irrigation season of 2012.  This included re-shaping the outlet of Salmon Creek as well as fortifying the stream bank in two reaches, one of which where a structure was in jeopardy of falling into the channel.  

this objective of this project is to return perennial flow to Salmon Creek.  At a minimum, 3,600 ac-ft is required to meet adequate conditions for the life history for summer steelhead.  One component, the development of a diversion dam on the N. F. Salmon Creek, will result in half (1,800 ac-ft.) of the required amount of water needed for perennial flow in Salmon Creek.  Currently, this project is financially and technically supporting the development of the aforementioned diversion dam which will result in an increase of 3,400 ac-ft in stored water.  In an MOU with the Okanogan Irrigation District 1,800 ac-ft of the increased stored water will be dedicated to instream flow.  

Interest to continue the water lease has been expressed by board members of the Okanogan Irrigation District.  

In addition to irrigation upgrades and water leases, there is an opportunity to improve stream bed and bank conditions in the middle reach of Salmon Creek.  As well as improving stream bed and bank conditions, best management practices such as install exclusionary fence along the riparian zone to reduce negative impacts by livestock may also be incorporated.  Concepts are proposed to be presented to landowners within this reach as to a follow-up from a site visit in 2015.
Account Type(s):
Expense
Contract Start Date:
08/01/2017
Contract End Date:
07/31/2018
Current Contract Value:
$116,832
Expenditures:
$116,832

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Roy Beaty Bonneville Power Administration Yes F&W Approver rebeaty@bpa.gov (503) 230-5213
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Chris Fisher Colville Confederated Tribes Yes Contract Manager chris.fisher@colvilletribes.com (509) 422-7427
Randy Friedlander Colville Confederated Tribes No Interested Party randall.friedlander@colvilletribes.com (509) 634-2110
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Billy Gunn Colville Confederated Tribes Yes Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Keith Kistler Colville Confederated Tribes Yes Technical Contact keith.kistler@colvilletribes.com (509) 422-7429
Peter Lofy Bonneville Power Administration No Interested Party ptlofy@bpa.gov (503) 230-4193
Kary Nichols Colville Confederated Tribes No Interested Party kary.nichols@colvilletribes.com (509) 422-4782
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
John Stensgar, Jr Colville Confederated Tribes Yes Administrative Contact lj.stensgar.fnw@colvilletribes.com (509) 634-2109
Kirk Truscott Colville Confederated Tribes No Supervisor kirk.truscott@colvilletribes.com (509) 978-8031
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Requirements Complete A: 165. Environmental Compliance Requirements 04/02/2018 06/06/2018
Provide information exchange with contractors, sub-contractors, govts., irrigation districts B: 119. Fulfill all administrative tasks with quality products in a timely manner 07/31/2018 02/19/2018
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR C: 191. Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB 07/10/2018 06/06/2018
Evaluation of fish passage conditions during controlled releases. D: 186. Evaluate fish passage conditions during controlled releases 06/04/2018 06/06/2018
Remove debris on 2.2 acre parcel along Salmon Creek H: 27. Remove debris on 2.2 acre parcel along Salmon Creek. 11/15/2017 11/15/2017
Plant native vegetation on 2.2 acre parcel I: 47. Plant vegetation at 2.2 acre parcel along Salmon Creek 04/16/2018 04/16/2018
Completed 2015 Annual Report K: 132. Placeholder: Submit Progress (Annual) Report for the period 8/1/2015 to 7/31/2016 09/29/2017 12/01/2017
Completed Annual Report L: 132. Submit Progress(Annual) Report for the period 8/1/2016 to 7/31/2017 05/31/2018 05/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance Requirements 08/01/2017
B 119 Fulfill all administrative tasks with quality products in a timely manner 08/01/2017
C 191 Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB 08/01/2017
D 186 Evaluate fish passage conditions during controlled releases 08/01/2017
E 175 Develop preliminary model output to abate sediment and reduce impacts to riparian area reach 7 & 8
F 100 Oversee construction of the irrigation diversion on the N.F. Salmon Creek 08/01/2017
G 84 Construct/install diversion on N. F. Salmon Creek
H 27 Remove debris on 2.2 acre parcel along Salmon Creek. 08/01/2017
I 47 Plant vegetation at 2.2 acre parcel along Salmon Creek 08/01/2017
J 185 Periodic Status Reports for BPA 08/01/2017
K 132 Placeholder: Submit Progress (Annual) Report for the period 8/1/2015 to 7/31/2016 08/01/2017
L 132 Submit Progress(Annual) Report for the period 8/1/2016 to 7/31/2017 08/01/2017