Province | Subbasin | % |
---|---|---|
Columbia Plateau | Umatilla | 100.00% |
Previous: | Next: |
---|---|
73982 REL 46: 2007-252-00 EXP HYPORHEIC FLOW ASSESSMENT |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Completed Environmental Compliance | A: 165. Produce Environmental Compliance Documentation | 05/14/2020 | 05/14/2020 | |
Identify additional target floodplains | B: 162. Identify/quantify alluvial floodplains likely influenced by hyporheic exchange (CTUIR and MSU) | 05/14/2020 | 05/14/2020 | |
Documentation of water temperatures | C: 157. Continue to monitor water temperatures in study floodplains (CTUIR and MSU) | 05/14/2020 | 05/14/2020 | |
Sensitivity of surface water temperatures in Meacham Creek to changes in the statistical distribution of hyporheic flowpaths | D: 162. Meacham Creek, Oregon, Case Study (CTUIR and MSU) | 05/14/2020 | 05/14/2020 | |
Improved CTUIR Fisheries Habitat and RM&E efforts | E: 122. Aid in the collaboration of work with other CTUIR efforts - Habitat and RM&E | 05/14/2020 | 05/14/2020 | |
Combined hyporheic and shade water temperature model outputs and publication | F: 162. Refine, write up and publish hyporheic geometry concepts that underlie the TempTool model (CTUIR and MSU) | 05/14/2020 | 05/14/2020 | |
All administrative tasks fulfilled with timely quality products | G: 119. Routine project updates, reporting and maintenance | 05/14/2020 | 05/14/2020 | |
Submit CY2019 Annual Report | I: 132. Submit Progress Report for the period Jan 2019 to Dec 2019 | 05/01/2020 | 05/14/2020 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Produce Environmental Compliance Documentation | 05/15/2019 | ||||||
B | 162 | Identify/quantify alluvial floodplains likely influenced by hyporheic exchange (CTUIR and MSU) | 05/15/2019 | ||||||
C | 157 | Continue to monitor water temperatures in study floodplains (CTUIR and MSU) | 05/15/2019 | ||||||
D | 162 | Meacham Creek, Oregon, Case Study (CTUIR and MSU) | 05/15/2019 | ||||||
E | 122 | Aid in the collaboration of work with other CTUIR efforts - Habitat and RM&E | 05/15/2019 | ||||||
F | 162 | Refine, write up and publish hyporheic geometry concepts that underlie the TempTool model (CTUIR and MSU) | 05/15/2019 | ||||||
G | 119 | Routine project updates, reporting and maintenance | 05/15/2019 | ||||||
H | 132 | Submit Progress Report for the period Jan 2018 - Dec 2018 | 05/15/2019 | ||||||
I | 132 | Submit Progress Report for the period Jan 2019 to Dec 2019 | 05/15/2019 | ||||||
J | 185 | Periodic Status Reports for BPA | 05/15/2019 |