Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74306: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Project Number:
Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
74306
Contract Title:
2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Continuation:
Previous: Next:
70741: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
  • 77247: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Status:
Closed
Contract Description:
A three-mile segment of the Walla Walla River near Milton-Freewater, Oregon, was dewatered each summer for the last century creating the need for fish rescues.  The rescues have not been necessary the last sixteen years after aggressive irrigation efficiency programs and new wells now maintain at least 27 cfs instream throughout the spring and 25 cfs instream throughout the summer.  However, half of these bypass flows are created by an increase in supplemental well use at unsustainable rates.  Additional irrigation conservation practices, combined with winter/spring groundwater recharge, will allow irrigators to reduce their demand on the river, reduce negative impacts to groundwater, and protect the conserved water as instream water rights. Projects planned under this contract will help WWBWC and the Walla Walla Basin continue their efforts to increase water in the Walla Walla River, its tributaries, and the highly connected shallow aquifer in order to ensure viable fish habitat in the basin.
Account Type(s):
Expense
Contract Start Date:
11/01/2016
Contract End Date:
10/31/2017
Current Contract Value:
$781,032
Expenditures:
$781,032

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Admin oversight for Exp Activities 10/31/2017 10/31/2017
Environmental Compliance complete C: 165. Environmental Compliance Documentation for all Exp actions 10/31/2017 09/29/2017
Surface Water Data collected for recharge projects and water monitoring D: 157. Collect Surface Water Data for Recharge project and Water monitoring 10/31/2017 10/31/2017
Groundwater Data collected for recharge projects and water monitoring E: 157. Collect Groundwater Data for Recharge project and Water monitoring 10/31/2017 10/31/2017
Produce accessible, error-checked datasets F: 157. Collect Water Temperature Data for Recharge project and Water monitoring 10/31/2017 10/31/2017
Updated WWBWC Database G: 160. Maintain Surface Water Database for Recharge project and Water monitoring 10/31/2017 10/31/2017
Maintain Groundwater Database H: 160. Maintain Groundwater Database for Recharge project and Water monitoring 10/31/2017 10/31/2017
Maintain water temperature database I: 160. Maintain Water Temperature Database for Recharge project and Water monitoring 10/31/2017 10/31/2017
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management J: 162. Analyze Surface Water Data for Recharge Project 10/31/2017 10/31/2017
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management K: 162. Analyze Groundwater Data for Recharge Project 10/31/2017 10/31/2017
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management L: 162. Analyze Water Temperature Data for Recharge Project 10/31/2017 10/31/2017
Annal Progress Report M: 132. Annual Progress Report (11-1-15 to 10-31-16) 05/19/2017 06/30/2017
Youth and Adult Presentations N: 99. Youth and adult presentations 10/31/2017 09/29/2017
Education and Outreach O: 99. Irrigation Efficiency and Aquifer Recharge project 10/31/2017 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 1 Splitter Box and Measuring Device P: 175. East Mud Creek Water Conservation Designs - Diversion 1 Splitter Box and Measuring Device 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 2 Splitter Box and Measuring Device Q: 175. East Mud Creek Water Conservation Designs - Diversion 2 Splitter Box and Measuring Device 09/01/2017
East Mud Creek Water Conservation Designs - Diversion 3 Splitter Box and Measuring Device R: 175. East Mud Creek Water Conservation Designs - Diversion 3 Splitter Box and Measuring Device 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 3 Ditch Piping S: 175. East Mud Creek Water Conservation Designs - Diversion 3 Ditch Piping 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 6 Splitter Box T: 175. East Mud Creek Water Conservation Designs - Diversion 6 Splitter Box 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 7 Splitter Box and Measuring Device U: 175. East Mud Creek Water Conservation Designs - Diversion 7 Splitter Box and Measuring Device 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 7 Ditch Piping V: 175. East Mud Creek Water Conservation Designs - Diversion 7 Ditch Piping 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 8 Splitter Box and Measuring Device W: 175. East Mud Creek Water Conservation Designs - Diversion 8 Splitter Box and Measuring Device 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 8 Ditch Piping X: 175. East Mud Creek Water Conservation Designs - Diversion 8 Ditch Piping 10/31/2017
East Mud Creek Water Conservation Designs - Diversion 11 Two Splitter Boxes and Two Measuring Device Y: 175. East Mud Creek Water Conservation Designs - Diversion 11 Two Splitter Boxes and Two Measuring Device 10/31/2017
Couse Creek Fish Passage Design Z: 175. Couse Creek Fish Passage Design 10/31/2017 10/31/2017
White Ditch Abandonment Recharge Site Design AA: 175. White Ditch Abandonment Recharge Site Design 10/31/2017 09/01/2017
Upper Eastside Dual-Purpose Bulge/Aquifer Recharge and Sprinkler System Site Design AB: 175. Upper Eastside Dual-Purpose Bulge/Aquifer Recharge and Sprinkler System Site Design 10/31/2017 10/31/2017
Lower West Little Walla Walla Irrigation Bulge Design AC: 175. Lower West Little Walla Walla Irrigation Bulge Design 01/31/2017 01/31/2017
Fruitvale Water Users Association Bulges Design AD: 175. Fruitvale Water Users Association Bulges Design 05/01/2017 09/15/2017
Flow meters installed AE: 148. Fruitvale Water Users Association Water Management Flow Meters - Phase 5 10/31/2017 10/31/2017
Locust Road Sprinkler Efficiency Phase 2 AG: 203. Locust Road Sprinkler Efficiency Phase 2 10/31/2017 10/31/2017
Lower West Little Walla Walla Irrigation Bulge AH: 203. Lower West Little Walla Walla Irrigation Bulge 10/31/2017 10/24/2017
Lower West Little Walla Walla Wetland Enhancement Implemented AI: 181. Lower West Little Walla Walla Wetland Enhancement 10/31/2017 10/31/2017
Fruitvale Water Users Association Bulges Installed AJ: 203. Fruitvale Water Users Association Bulges 10/31/2017 10/31/2017
Johnson Cherry Orchard Acquisition AL: 172. Johnson Cherry Orchard Acquisition 10/31/2017
Dorothy Ditch Flow Meter Design AM: 175. Dorothy Ditch Flow Meter Design 07/31/2017 07/31/2017
Gardena Farms Irrigation District #13 Water Source Exchange Engineering AN: 175. Gardena Farms Irrigation District #13 Water Source Exchange Engineering 10/31/2017 10/31/2017
Nursery Bridge Phase 2 Fish Passage Designs AO: 175. Nursery Bridge Phase 2 Fish Passage 10/31/2017 10/31/2017
Milton-Freewater ASR Design Study AP: 115. Milton-Freewater ASR Design Study 10/31/2017 10/31/2017
County Road Aquifer Recharge Site Installation AQ: 205. County Road Aquifer Recharge Site Installation 10/31/2017
Gallagher Aquifer Recharge Site Phase 1 Installation AR: 205. Gallagher Aquifer Recharge Site Phase 1 Installation 10/31/2017 10/31/2017
Dorothy & Spence Flow Meters Installed AS: 148. Dorothy & Spence Ditches Flowmeter Installation 10/31/2017 10/31/2017
Tributary and Water Diversion Telemetry Phase 1 Installed AT: 148. Tributary and Water Diversion Telemetry Phase 1 10/31/2017 10/31/2017
Spence Ditch Flow Meter Design AU: 175. Spence Ditch Flow Meter Design 07/31/2017 09/29/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 4 instances of WE 203 Install Water Conservation Measure
  • 2 instances of WE 205 Aquifer Recharge
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 19 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 162 Analyze/Interpret Data
  • 3 instances of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 4 instances of WE 203 Install Water Conservation Measure
  • 2 instances of WE 205 Aquifer Recharge
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 19 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 162 Analyze/Interpret Data
  • 3 instances of WE 148 Install Flow Measuring Device
Trout, Bull (S. confluentus) (Threatened)
  • 4 instances of WE 203 Install Water Conservation Measure
  • 2 instances of WE 205 Aquifer Recharge
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 19 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 162 Analyze/Interpret Data
  • 3 instances of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 11/01/2016
B 119 Admin oversight for Exp Activities 11/01/2016
C 165 Environmental Compliance Documentation for all Exp actions 11/01/2016
D 157 Collect Surface Water Data for Recharge project and Water monitoring 11/01/2016
E 157 Collect Groundwater Data for Recharge project and Water monitoring 11/01/2016
F 157 Collect Water Temperature Data for Recharge project and Water monitoring 11/01/2016
G 160 Maintain Surface Water Database for Recharge project and Water monitoring 11/01/2016
H 160 Maintain Groundwater Database for Recharge project and Water monitoring 11/01/2016
I 160 Maintain Water Temperature Database for Recharge project and Water monitoring 11/01/2016
J 162 Analyze Surface Water Data for Recharge Project 11/01/2016
K 162 Analyze Groundwater Data for Recharge Project 11/01/2016
L 162 Analyze Water Temperature Data for Recharge Project 11/01/2016
M 132 Annual Progress Report (11-1-15 to 10-31-16) 11/01/2016
N 99 Youth and adult presentations 11/01/2016
O 99 Irrigation Efficiency and Aquifer Recharge project 11/01/2016
P 175 East Mud Creek Water Conservation Designs - Diversion 1 Splitter Box and Measuring Device 11/01/2016
Q 175 East Mud Creek Water Conservation Designs - Diversion 2 Splitter Box and Measuring Device 11/01/2016
R 175 East Mud Creek Water Conservation Designs - Diversion 3 Splitter Box and Measuring Device 11/01/2016
S 175 East Mud Creek Water Conservation Designs - Diversion 3 Ditch Piping 11/01/2016
T 175 East Mud Creek Water Conservation Designs - Diversion 6 Splitter Box 11/01/2016
U 175 East Mud Creek Water Conservation Designs - Diversion 7 Splitter Box and Measuring Device 11/01/2016
V 175 East Mud Creek Water Conservation Designs - Diversion 7 Ditch Piping 11/01/2016
W 175 East Mud Creek Water Conservation Designs - Diversion 8 Splitter Box and Measuring Device 11/01/2016
X 175 East Mud Creek Water Conservation Designs - Diversion 8 Ditch Piping 11/01/2016
Y 175 East Mud Creek Water Conservation Designs - Diversion 11 Two Splitter Boxes and Two Measuring Device 11/01/2016
Z 175 Couse Creek Fish Passage Design 11/01/2016
AA 175 White Ditch Abandonment Recharge Site Design 11/01/2016
AB 175 Upper Eastside Dual-Purpose Bulge/Aquifer Recharge and Sprinkler System Site Design 11/01/2016
AC 175 Lower West Little Walla Walla Irrigation Bulge Design 11/01/2016
AD 175 Fruitvale Water Users Association Bulges Design 11/01/2016
AE 148 Fruitvale Water Users Association Water Management Flow Meters - Phase 5 09/29/2017
AF 203 CANCEL WE: West Branch Crocket Piping
AG 203 Locust Road Sprinkler Efficiency Phase 2 11/01/2016
AH 203 Lower West Little Walla Walla Irrigation Bulge 08/07/2017
AI 181 Lower West Little Walla Walla Wetland Enhancement 08/07/2017
AJ 203 Fruitvale Water Users Association Bulges 09/29/2017
AK 30 CANCEL WE: Joe West Reach Walla Walla River Habitat Project
AL 172 Johnson Cherry Orchard Acquisition 11/01/2016
AM 175 Dorothy Ditch Flow Meter Design 11/01/2016
AN 175 Gardena Farms Irrigation District #13 Water Source Exchange Engineering 11/01/2016
AO 175 Nursery Bridge Phase 2 Fish Passage 11/01/2016
AP 115 Milton-Freewater ASR Design Study 11/01/2016
AQ 205 County Road Aquifer Recharge Site Installation 12/15/2016
AR 205 Gallagher Aquifer Recharge Site Phase 1 Installation 12/15/2016
AS 148 Dorothy & Spence Ditches Flowmeter Installation 09/29/2017
AT 148 Tributary and Water Diversion Telemetry Phase 1 07/31/2017
AU 175 Spence Ditch Flow Meter Design 11/01/2016