Completed Surveys and Consultation |
B: 165. Environmental Reviews and/or Consultation |
|
09/30/2021 |
09/27/2021 |
Administrative Tasks Completed |
C: 119. Conduct Administrative Activities required by BPA |
|
09/30/2021 |
09/27/2021 |
Rehabilitate or Overseed Pasture |
D: 199. Rehabilitate or Overseed Pasture |
|
05/15/2021 |
05/14/2021 |
Mowed pastures and planted cover crops |
E: 198. Goose Forage Management |
|
09/30/2021 |
09/27/2021 |
Maintained Trees and Shrubs |
F: 198. Maintain Planted Trees and Shrubs |
|
09/30/2021 |
09/27/2021 |
Removal of Established Reed Canary Grass |
G: 199. Moist Soil Management/ Control of Reed Canary Grass |
|
09/30/2021 |
09/27/2021 |
Clear Travel Routes |
H: 38. Improve Interior Roads and Travel Routes in Support of Other Activities |
|
09/30/2021 |
09/27/2021 |
Weeds Controlled |
I: 199. Control Noxious Weeds and Other Undesirable Plants |
|
09/30/2021 |
09/27/2021 |
Site Cleared of Brush |
J: 199. BUCKMIRE SLOUGH--Site Prep/Clearing |
|
09/30/2021 |
09/27/2021 |
Construction of Fence |
K: 40. NORTH BASIN--Install Fence |
|
09/30/2021 |
03/25/2021 |
Trees Planted at North Unit |
L: 47. NORTH UNIT (old ag site)-- Plant Oak habitat |
|
03/31/2021 |
02/18/2021 |
Trees Planted as needed at South Unit |
M: 47. SOUTH UNIT (old rookery site)-- Plant Trees |
|
03/31/2021 |
02/18/2021 |
Trees and Shrubs Planted at Lake River |
N: 47. LAKE RIVER (Riparian Zone)-- Plant Trees & Shrubs |
|
03/31/2021 |
02/18/2021 |
Trees Planted-- South Unit |
O: 47. SOUTH UNIT (Buckmire Slough)--Plant Trees & Shrubs |
|
03/31/2021 |
02/18/2021 |
Trees and shrubs planted--Chapman Slough |
P: 47. CHAPMAN SLOUGH-- Riparian Planting |
|
03/31/2021 |
02/18/2021 |
Maintained Water Management Structures |
Q: 186. Operate and Maintain Wetland Management Facilities (including pumps) |
|
09/30/2021 |
09/27/2021 |
Build and install nest boxes |
R: 36. Provide nest boxes in lieu of snags where necessary |
|
09/30/2021 |
05/14/2021 |
Build and install waterfowl nesting structures |
S: 36. Provide waterfowl nesting structures where necessary |
|
09/30/2021 |
03/26/2021 |
Fences Maintained |
T: 186. Maintain, Repair or Replace Existing Fences as Needed for Management Purposes |
|
09/30/2021 |
09/27/2021 |
Debris Removed |
U: 27. Remove Debris, Litter and Other Materials as Required |
|
09/30/2021 |
09/27/2021 |
Public Use Monitored/Managed |
V: 188. Monitor and Manage Public and Other Uses |
|
09/30/2021 |
09/27/2021 |
Assessment on broadleaf weed presence |
W: 115. ASSESSMENT--Broadleaf weeds in open habitats |
|
09/30/2021 |
09/27/2021 |
Assessment on waterfowl use |
X: 115. ASSESSMENT--Waterfowl use associated with habitat treatments |
|
09/30/2021 |
09/01/2021 |
Assessment of Wetland Vegetation |
Y: 115. ASSESSMENT--Wetland Vegetation |
|
01/31/2021 |
12/31/2020 |
Assessment of snag prevalence |
Z: 115. ASSESSMENT--Snag prevalence in forested areas |
|
09/30/2021 |
|
Update Wildlife Area Management Plan |
AA: 193. Land Management Plan Update |
|
09/30/2021 |
09/24/2021 |
Attach Progress Report in Pisces |
AB: 132. Submit Progress Report for the period Oct 2019 to Sept 2020 |
|
03/15/2021 |
03/15/2021 |